Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 LAccepted-AOC | ₹35.3 L | L1 | Accepted-AOC aoc |
| 2 | L2₹35.3 LRejected-Finance | ₹35.3 L | L2 | Rejected-Finance R |
Tender Value
₹40 L
EMD Value
₹4 L
Closing Date
30 Mar 2026, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
JANPAD BASTI ME GHODSARAY PARSIJOT PAKKI SADAK PAR STHIT NAHAR PAR 2X4-00 METER SPAN KI RCC SETU KA NIRMAN KARYA
2026_CEUBZ_1129639_1
1516/4E-NIVIDA-BASTI CIRCLE/25-26 DATED-13-03-2026
Open Tender
Civil Works
120 days
BASTI
AS PER MBD
2 documents required · 2 mandatory
₹2,714
Yes
₹4 L
Yes
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
27 May 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
24 Mar 2026 - 30 Mar 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
CULVERT WORK Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. as per Technical Specification Clause 302(II) in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | cum | - | - | |
GSB Filling in foundation trenches as per drawing & Technical Specification Clause 305.3.9 in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | cum | - | - | |
Plain Cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed placed in foundation and compected by vibration including curing for 14 days. As per MORD specification 800. in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | cum | - | - | |
Providing and laying reinforced cement concrete M 30 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | cum | - | - | |
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specification clauses 1002, 1010, 1202 in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | Mt | - | - | |
Providing Weep holes in brick masonary / Plain / reinforced concrete abutment wing wall/ return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of IV:20H towards drawing foce complete as per drawing and technical specification As per MORT&H specification 2706 & 2200 in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | Mtr. | - | - | |
Drainage spouts as per drawing & technical specification as per MORT&H specification 2705 in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | No. | - | - | |
Filling of boulders in between Cut off wall and Raft 600 mm thick comprising of loose boulders weighing not less than 40 kg beyond curtain wall. in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | cum | - | - | |
DIVERSION Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 in all aspects or as per direction of E/I . (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | cum | - | - | |
Laying reinforced cement concrete pipe 1000 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling concrete and masonary works in head walls and parapets. in all aspects or as per direction of E/I. (Rates are excluding G.S.T. but including of all other taxes labour cess, material, labour and T&P etc.) | - | Rm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
T-2.pdf
Tender Documents • 3.83 MB
BOQ_2107225.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid