Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAdmitted-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹17.4 L | L1 | Admitted-Finance |
| 2 | L2₹18.4 LAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹18.4 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWAPAN KUMAR AKHULI L1 | BABLU SINHA L2 |
|---|---|---|---|---|---|
| 1.00Dismantling of PV-300 ventilation fan and New installation of PV-300 ventilation fan at pit no. 01 of Shyamsundarpur Colliery | |||||
| 2.00 | Dismantling Existing PV-200 Fan with
disamntling concrete foundation and existing
fan house (5.00 x 4.60 x 4.00) | 1 | LS | 2,36,500 ₹2.4 L | 2,52,309.77 ₹2.5 L |
| 3.00 | Installation of New PV-300 ventilation fan
including installation motor | 1 | LS | 1,60,550 ₹1.6 L | 1,90,283 ₹1.9 L |
| 4.00 | Proper alignment and comminsioning | 1 | LS | 75,000 ₹75,000 | 76,870.28 ₹76,870.28 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m,disposed earth to be levelled and neatly dressed- All kinds of soil (For foundation of fan and motor) | 35.95 | cum | 128.35 ₹4,614.18 | 129.69 ₹4,662.36 |
| 6.00 | Providing and laying in position specified grade of RCC, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 60.22 | cum | 6,500 ₹3.9 L | 6,986.75 ₹4.2 L |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars | 6,021.5 | kg | 95.75 ₹5.8 L | 96.88 ₹5.8 L |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 115.62 | sqm | 269.3 ₹31,136.47 | 272.53 ₹31,509.92 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 2,65,642.07 ₹2.7 L | 2,80,753.26 ₹2.8 L |
Updated dates
Tender Value
₹18.2 L
EMD Value
₹22,800
Closing Date
30 Mar 2026, 4:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of PV 300 fan at no. 2 pit in place of PV 200 fan.
2026_ECL_356747_1
ECL/GM/BA/E TENDER/25-26/ENM/399 Dt 16.03.2026
Open Tender
Electrical and Maintenance Works
60 days
Shyamsundarpur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹22,800
7 Apr 2026
16 Mar 2026
31 Mar 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
16 Mar 2026 - 20 Mar 2026
Dismantling of PV-300 ventilation fan and New installation of PV-300 ventilation fan at pit no. 01 of Shyamsundarpur Colliery
Dismantling Existing PV-200 Fan with disamntling concrete foundation and existing fan house (5.00 x 4.60 x 4.00)
Installation of New PV-300 ventilation fan including installation motor
Proper alignment and comminsioning
Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m,disposed earth to be levelled and neatly dressed- All kinds of soil (For foundation of fan and motor)
Providing and laying in position specified grade of RCC, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_369604.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid