| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹46.2 L+₹4.2 L (10.0%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹49.2 L+₹7.2 L (17.2%)Rejected-Finance | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹49.4 L+₹7.5 L (17.8%)Rejected-Finance | L4 | Rejected-Finance Other than lowest | |
| 5 | Rejected-Technical | - | Rejected-Technical Not eligible |
| Sl No | Description | Qty | Unit | M/s SSS Motors L2 | M/s Ritz Marketing L1 | L BINOD CONSTRUCTION CO L4 | M/s Nongmaithem Construction L3 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule 'A' | |||||||
| 1.01 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(a) Semi under ground sump of capacity 75000 Gallon 2 nos at High Lift Pump House ( Each month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 24 | EACH JOB | 22,700 ₹5,44,800 | 22,000 ₹5,28,000 Lowest | 23,897.39 ₹5,73,537.36 | 23,500 ₹5,64,000 |
| 2.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(b) Semi under ground sump of capacity 50000 Gallon 4 nos at High Lift Pump House. (Each 3 Month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 16 | EACH JOB | 21,900 ₹3,50,400 | 20,750 ₹3,32,000 Lowest | 22,744.99 ₹3,63,919.84 | 22,500 ₹3,60,000 |
| 3.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(c) Semi under ground sump of capacity 50000 Gallon 3 nos Near Capt Qtr (High Lift Pump House), 01 no KLP Pump House & 02 no at 183 MH. (Each 3 Month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 24 | EACH JOB | 21,250 ₹5,10,000 | 20,000 ₹4,80,000 Lowest | 21,000 ₹5,04,000 | 21,500 ₹5,16,000 |
| 4.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(d) Semi under ground sump of capacity 25000 Gallon at High Lift pump house-01, KLP pump house-01 (Each 3 Month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 8 | EACH JOB | 15,500 ₹1,24,000 | 14,500 ₹1,16,000 Lowest | 16,500 ₹1,32,000 | 16,850 ₹1,34,800 |
| 5.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(e) Semi under ground sump open type of capacity 50000 Gallon at Low Lift Pump house. (Twice 01 Month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 22 | EACH JOB | 20,850 ₹4,58,700 | 18,000 ₹3,96,000 Lowest | 20,500 ₹4,51,000 | 21,800 ₹4,79,600 |
| 6.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(f) Semi under ground sump open type of capacity 10000 Gallon at Low Lift Pump house. (Every month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 11 | EACH JOB | 14,850 ₹1,63,350 | 13,000 ₹1,43,000 Lowest | 15,000 ₹1,65,000 | 15,750 ₹1,73,250 |
| 7.00 | M&L for cleaning of inner surfaces of RCC semi under ground sump/OHT including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(h) OHT 50000 Gallon capacity at inf Bn. (Each 3 Month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC semi under ground sump/OHT.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 4 | EACH JOB | 22,500 ₹90,000 | 21,000 ₹84,000 Lowest | 22,500 ₹90,000 | 22,300 ₹89,200 |
| 8.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(i) OHT 25000 Gallon capacity MH Bn. (Each 3 Month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 4 | EACH JOB | 17,500 ₹70,000 | 16,000 ₹64,000 Lowest | 18,500 ₹74,000 | 19,450 ₹77,800 |
| 9.00 | M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following :
(a) Semi under ground sump of capacity 5000 Gallon 01 nos at R&R ( Each 3 month) NOTE :
(i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc.
(ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump.
(iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department.
(iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users.
(v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge | 4 | EACH JOB | 11,100 ₹44,400 | 10,250 ₹41,000 | 10,000 ₹40,000 Lowest | 11,400 ₹45,600 |
Tender Value
₹42 L
EMD Value
₹84,000
Closing Date
1 Aug 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE 869 EWS
GE 869 EWS PIN-913869 C/O 99APO
MAINT AND CLEANING OF UG SUMPS, STORAGE SUMPS, CHANNELS AND WATER TESTING AT UPPER LEIMAKHONG AND LOWER LEIMAKHONG,CENTRAL SECTOR KOIRENGEI MIL STN.
2025_MES_718667_1
8685/E8
Open Tender
Civil Works
Item Rate
210 days
LEIMAKHONG MIL STN
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹500
GE 869 EWS
₹84,000
Yes
12 Sept 2025
4 Jul 2025
8 Aug 2025
4 Jul 2025
1 Aug 2025
19 Jul 2025
Amount
Schedule 'A'
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (a) Semi under ground sump of capacity 75000 Gallon 2 nos at High Lift Pump House ( Each month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (b) Semi under ground sump of capacity 50000 Gallon 4 nos at High Lift Pump House. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (c) Semi under ground sump of capacity 50000 Gallon 3 nos Near Capt Qtr (High Lift Pump House), 01 no KLP Pump House & 02 no at 183 MH. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (d) Semi under ground sump of capacity 25000 Gallon at High Lift pump house-01, KLP pump house-01 (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (e) Semi under ground sump open type of capacity 50000 Gallon at Low Lift Pump house. (Twice 01 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (f) Semi under ground sump open type of capacity 10000 Gallon at Low Lift Pump house. (Every month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC semi under ground sump/OHT including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (h) OHT 50000 Gallon capacity at inf Bn. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC semi under ground sump/OHT. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (i) OHT 25000 Gallon capacity MH Bn. (Each 3 Month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (a) Semi under ground sump of capacity 5000 Gallon 01 nos at R&R ( Each 3 month) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump/SWT including floor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the following : (f) Semi under ground sump open type of capacity 50000 Gallon 2 nos at 183 MH. (Each 3 Month) (SWT) NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump/ SWT. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning of inner surfaces of channel upto appx 20 mtr infront of starting point including removing of mud, stone, gravels and removing silt, sludge, moss, algae, dirt etc to the channel the water to the channel including floor of water intake sump and complete all specified and directed by Engr-in-Charge NOTE : (i) The unit rate quoted shall be deemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed to include all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work inside each UG sump to prevent interruption of water supply to the users. (v) The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge
M&L for cleaning/ cutting of bush/ shurbs/ trimming of branches of tree around the sump/ pumphouses/ valve pits complete all specified and directed by Engr-in-Charge.
S&F water tank level indicator with marking of level such as 01 mtr to tank, suitable for tank height upto 5 mtr complete with Aluminium/ SS 304 die cast weather proof, weather proof enclosure, chemical proof scale and connected accessories complete all specified and directed by Engr-in-Charge
Supply only inorganic polymerised liquid primary coagulant for drinking water treatment with following specifications: Appearance: Clear to slight hazy liquid Odour:Odourless Specific gravity: 1.3300 - 1.3500 pH (30% w/v) : 4.00 - 4.40 Melting / Freezing point : -7 degree centigrade Evaporation rate : 50 - 75%(water) Viscosity : less than 50 cps Oral LD50 : 5000 mg/Kg (Rat)
S&F in repair STEQUA PACK PRO Bleaching Stick Applicator complete with all connection/ accessories complete all as specified and as directed
S&F in repair STEQUA PACK PRO Bleaching Stick complete all as specified and as directed
Testing of water for potability test by chemical and bacteriological from any Govt. laboratory such as PH value, Total dissolved solids, hardness as CaCOᶟ, Calcium, Magnesium, Chlorides, Sulphates, Nitrate, Alkalinity, Iron, Turbidity NTU, Mineral oil, Colur hazen units, Taste, Odour, Residual free Chlorine, Total Coliform per 100ml (Microbiologocal test) & E Coli per 100ml (Microbiological test) complete and report to be submitted to the department in triplicate in hard bound copy complete all as specified and as directed
M/s SSS Motors (BID ID -3367276)
M/s Nongmaithem Construction (BID ID -3370606)
L BINOD CONSTRUCTION CO (BID ID -3365412)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .