Tender Value
₹7.4 L
EMD Value
₹14,800
Closing Date
30 Sept 2026, 4:00 pm2d left
Er. Mohd Qasim
Executive Engineer PWD R and B Division Billawar
Please refer in BOQ
2026_PWDJK_325941_1
e-NIT No 87 of 2026-27 dated 24-09-2026
Open Tender
Civil Works
Percentage
180 days
Pattian
Please refer Tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Billawar
₹14,800
24 Sept 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 1mtr. | |||||
| 1.1 | All kinds of soil=85%. | 22.99 | Cum | 479.3 | ₹11,019.11 |
| 1.2 | Ordinary Rock=15%. | 4.06 | Cum | 924.8 | ₹3,754.69 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:A)1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.2 | Cum | 4,826.5 | ₹15,444.8 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:A)1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)with 20% boulders. | 22.09 | Cum | 4,774.46 | ₹1,05,467.82 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.A)1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.46 | Cum | 7,564.8 | ₹33,739.01 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :A)Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 19.41 | Cum | 7,571.55 | ₹1,46,963.79 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 19.41 | Cum | 1,455.65 | ₹28,254.17 |
| 7Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 7.1 | Foundations, footings, bases for columns | 83.64 | sqm | 286.35 | ₹23,950.31 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_1101912.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .