Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.1 L
EMD Value
₹28,100
Closing Date
11 Nov 2026, 12:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Er. Gurcharan Singh
Executive Engineer, Civil Mtc. Division, BBMB, Chandigarh
Re-grading of tile terracing of roof top in BBMB Colony, Sector 36 A and B, Chandigarh
2026_BBMB_294883_1
NIT-571/2026/CMD
Open Tender
Civil Works
Tender cum Auction
180 days
Chandigarh
As per Tender Documents
2 documents required · 2 mandatory
₹0
₹28,100
16 Oct 2026
16 Oct 2026
12 Nov 2026
16 Oct 2026
11 Nov 2026
16 Oct 2026
16 Oct 2026 - 11 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Regrading terracing of mud plaster covered with tiles or bricks in cement by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud plaster to proper, slope, relaying mud plaster Gobri leaping and tiles or bricks grouted in cement mortar 1:3 (1 cement and 3 fine sand) including replacing unserviceable tiles, or bricks with new over and disposal of unserviceable material to the dumping ground within 50 m lead (The cost of new tiles or bricks excluded) | 2,060.8 | Sqm | 1.25 | ₹2,576 |
| 2 | Scraping: (g) Tiles dismantled from the work in lime or cement | 53.38 | per 1000 No | - | - |
| 3 | Supply of tiles size 22.86 x 11.43 x 3.83 cm. As per A & c slip No. 4 of PB CSR 2020 | 22,875 | No | 100 | ₹22,87,500 |
| 4 | Cement concrete 1:2:4 gola 10cm x 10cm concave quadrant along junction of roofs with parapet wall finished smooth, where specially specified. | 623.22 | Mtr | 53 | ₹33,030.66 |
| 5 | Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:16 | 50 | No | 10 | ₹500 |
| 6 | P & Laying LDPE (low density polyethylene sheets ) over roofing before laying of roof tiles having thickness 200 micron including cutting jointing (heat seal jointing with hot iron) and over lapping of minimum 150mm and CC gola 75mm wide, complete in all respect to the satisfaction approval of engineer-in-charge | 2,123.12 | Mtr | 11 | ₹23,354.32 |
| 7 | Dismantling brick work tile, masonry or tile lining: (b) In cement
Note : Dismantled brick not use in fresh brick work due to high rise brick work. | 167.75 | Cum | 11 | ₹1,845.25 |
| 8 | First class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 metres above plinth level.
Note: Parapet brick work will be done at 4th floor. | 167.75 | Cum | 10 | ₹1,677.5 |
| 9 | Conglomerate floor 40mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material | 143.32 | Sqm | 22 | ₹3,153.04 |
| 10 | 12.5 mm thick cement plaster 1:6 | 535.46 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_343698.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .