| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹27.5 LAccepted-Finance | ₹27.5 L | L-1 | Accepted-Finance 1 |
| 2 | L-2₹28.5 L+₹94,481 (3.43%)Rejected-Finance | ₹28.5 L+₹94,481 (3.43%) | L-2 | Rejected-Finance 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical rejected |
Tender Value
₹27.0 L
EMD Value
₹54,000
Closing Date
17 Mar 2026, 6:00 pmClosed
Executive Engineer
HPPWD ROHRU
AR MO Housing Board Cololy at Samala Tehsil Rohru Distt. Shimla H.P SH PF Steel work at 1 No. Quarter Almirah cup board in 4Nos quarter etc
2026_PWD_131313_1
27000-99 dated 6-3-26
Open Tender
Civil Works
Percentage
120 days
housing
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹54,000
21 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
17 Mar 2026
12 Mar 2026
EXcavation in foundation and trenches in earth work in all heights and depth in all kinds of soils, including saturated soil comprising of pick work, jumper work, and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting out to required lines, levels as |shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-l I(one) and sorting out useful and un- useful material and transportation of the un -useful material for disposing at dumping site (to be arranged by the contractor) to he satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its levelling fine |dressing and with all kinds of labour,machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means land labour ( if required ). All useful material such as stones shingles aggregates land slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation and used / removed per the direction of engineer in charge. any loss to the public and private property during the course of excavation and disposal of servicable and unservicable material shall be the absolute rtesponsibilty of the contractor
Providing and laying in position cement concrete of specified grade excluding the cost of 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
Steel work welded in built up sections and framed workm incliding cutting, hoisting, fixing in position and applying a coat of lead paint in beans joints channels angles tees flats with connection plates or angle cleats as in main and cross beams, hip and jack rafters, purlins and connected to common rafters and the like as per specification.
P/F 12mm thick preleinated board both side bwp plenol bounded exterior/interior grade shutter with framed and screws etc. complete including carriage of meterial in all leds and lifts as per the direction of the Engineer in charge.
Providing and fixing bright finished brass double acting spring hinges with necessary brass screws etc. complete
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
SBD1.pdf
Tender Documents • 2.62 MB
BOQ_194130.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .