Krishnagiri District Hosur Block Under SRILANKAN REFUGEES CAMP IMPROVEMENT SCHEME Construction of Drain at Kelavarapalli Refugee Camp at Kelavarapalli Panchayat Package No HSR-13
2022_RDTN_245549_1
RocNo_23782_2021_G1_14_06_2022
Open Tender
Civil Works - Others
Item Rate
90 days
Hosur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹36,000
BDO Office Hosur
12 Aug 2022
4 Aug 2022
11 Aug 2022
4 Aug 2022
11 Aug 2022
4 Aug 2022
5 Aug 2022
Amount
1. Construction of Drain at Kelavarapalli Refugees Camp H/o Kelavarapalli Rs.35.36 /- Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all cost
Cover Slab sides Alround
Cover Slab Bottom
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Constructions Of Horizontal Filter
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Supply and Filling of Rough stone from Approved Qurry including all labour charge
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Supply and Filling of Char Coal including all labour charges
Supply and Fixing of 0.60x0.60m Vertical Filter steel Fabrication including cost and Conveyance
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
supplying and fixing of 63mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Writing Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Annamalayar Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .