Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-AOC | ₹24.3 L Quoted ₹24.6 L | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 Contractor, Amutha Engineering and Construction, Chennai at their revised quoted total amount of Rs. 24,27,800.00 /- for the work. |
| 2 | L2₹27.9 L+₹3.2 L (13.2%)Rejected-Finance | ₹27.9 L+₹3.2 L (13.2%) | L2 | Rejected-Finance L2 Contractor. Hence not Accepted by CWC. |
| Sl No | Description | Qty | Unit | Siva Enterprises L2 | AMUTHA ENGINEERING AND CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of Main water pump House in 03 shifts G -Type over head tanks, E-Type over head tanks, DSC over head tanks and Nursary over head tanks at HVF Esate . The water supply systems in HVF Estate shall be operated without any interruption. The Operation and Maintenance involves the following jobs as per Annexure 'C' Details description for the work | 1 | WJ | 11,76,900 ₹11,76,900 | 11,34,000 ₹11,34,000 Lowest |
| 2.00 | Testing of water samples at the WPH and the end user area of North and South Zone of Estate quarters. The test shall be done at King Institute, Guindy, Chennai-600 032 (Tamilnadu Government Lab). The samples shall be tested for drinking and potability which includes Physical, Chemical and Biological tests. (for 1 month = 3 samples.Hence for 12 months =3 x 12=36 samples for year.) | 36 | WJ | 10,500 ₹3,78,000 | 9,000 ₹3,24,000 Lowest |
| 3.00 | Operation and Maintenance of bore wells on 24/7 basis (ANNEXURE - E) The operator should fill the water, from bore wells to overhead tanks of each residential / public buildings on daily basis. The Bore well systems in HVF Estate shall be operated without any interruption. The details of the work involved is enclosed as ANNEXURE D | 1 | WJ | 6,95,000 ₹6,95,000 | 6,00,000 ₹6,00,000 Lowest |
| 4.00 | Removing of PVC/G.I pipes from bore wells. Any class of 40 to 50 mm (including all fitting )including disconecting with taking out of submersible pumpsets etc, carefully with out any damage. | 1,400 | M | 125 ₹1,75,000 | 90 ₹1,26,000 Lowest |
| 5.00 | Lowering of 40 to 50 mm PVC/G.I pipes any class (including all fitting )including conecting with taken out submersible pumpsets etc, carefully with out any damage. | 1,400 | M | 115 ₹1,61,000 | 90 ₹1,26,000 Lowest |
| 6.00 | Cleaning of existing borewells with compressed air inserted in bore of any size to remove the silt/mud deposited inside the bore well and as specified and directed | 1,400 | M | 145 ₹2,03,000 | 110 ₹1,54,000 Lowest |
Tender Value
₹23.4 L
EMD Value
₹47,000
Closing Date
18 Jun 2026, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, FMU - HVF, AVADI, CHENNAI - 54
OPERATION AND MAINTENANCE OF WATER SUPPLY SYSTEMS AT HVF ESTATE.
2026_AVNL_279474_1
HVF/TE/13025/CEO/2026-27/18
Open Tender
Civil Works
Works
365 days
HVF ESTATE, AVADI
DETAILS ENCLOSED
8 documents required · 8 mandatory
₹0
₹47,000
4 Aug 2026
3 Jun 2026
19 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and Maintenance of Main water pump House in 03 shifts G -Type over head tanks, E-Type over head tanks, DSC over head tanks and Nursary over head tanks at HVF Esate . The water supply systems in HVF Estate shall be operated without any interruption. The Operation and Maintenance involves the following jobs as per Annexure 'C' Details description for the work | 1 | WJ | 10,68,200 | ₹10,68,200 |
| 2 | Testing of water samples at the WPH and the end user area of North and South Zone of Estate quarters. The test shall be done at King Institute, Guindy, Chennai-600 032 (Tamilnadu Government Lab). The samples shall be tested for drinking and potability which includes Physical, Chemical and Biological tests. (for 1 month = 3 samples.Hence for 12 months =3 x 12=36 samples for year.) | 36 | WJ | 8,500 | ₹3,06,000 |
| 3 | Operation and Maintenance of bore wells on 24/7 basis (ANNEXURE - E) The operator should fill the water, from bore wells to overhead tanks of each residential / public buildings on daily basis. The Bore well systems in HVF Estate shall be operated without any interruption. The details of the work involved is enclosed as ANNEXURE D | 1 | WJ | 5,75,400 | ₹5,75,400 |
| 4 | Removing of PVC/G.I pipes from bore wells. Any class of 40 to 50 mm (including all fitting )including disconecting with taking out of submersible pumpsets etc, carefully with out any damage. | 1,400 | M | 86 | ₹1,20,400 |
| 5 | Lowering of 40 to 50 mm PVC/G.I pipes any class (including all fitting )including conecting with taken out submersible pumpsets etc, carefully with out any damage. | 1,400 | M | 86 | ₹1,20,400 |
| 6 | Cleaning of existing borewells with compressed air inserted in bore of any size to remove the silt/mud deposited inside the bore well and as specified and directed | 1,400 | M | 106 | ₹1,48,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_326234.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .