| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Admitted |
| 2 | Accepted-Technical | Accepted-Technical Admitted |
Tender Value
₹30.8 Cr
EMD Value
₹61.5 L
Closing Date
30 Oct 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
ASOM_MALA_3.0_25_26_33 Improvement and Upgradation of Teok Boloma Nakachari Road of Length 12.50Km under Asom Mala 3.0 for the year 2025-26
2025_PWD_47948_1
CE/DEV/TB/116/2025-26/22 Dtd- 11.09.2025
Open Tender
Civil Works – Roads
Item Rate
540 days
Teok
Please refer Tender Documents
5 documents required · 5 mandatory
₹20,000
₹61.5 L
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
26 Nov 2025
10 Oct 2025
30 Oct 2025
10 Oct 2025
30 Oct 2025
15 Oct 2025
10 Oct 2025 - 13 Oct 2025
14 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
By Manual Means
In area of non thorny jungle | 5.63 | Hect | 52,995.08 | ₹2,98,362.3 |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201.(i) Girth from 300 mm to 600 mm | 94 | each | 255.95 | ₹24,059.3 |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201.(ii) Girth from 600 mm to 900 mm | 10 | each | 438.55 | ₹4,385.5 |
| 4 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201.(ii) Girth from 900 mm to 1800 mm | 2 | each | 877.56 | ₹1,755.12 |
| 5 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)A 5th KM stone | 3 | each | 529.97 | ₹1,589.91 |
| 6 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)B Ordinary KM Stone each | 13 | each | 307.36 | ₹3,995.68 |
| 7 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)C Hectometre Stone/200-M stone | 63 | each | 61.02 | ₹3,844.26 |
| 8 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | 68,400 | Sq.m | 7.35 | ₹5,02,740 |
| 9 | Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202.Above 900 mm dia Hume pipe | 30 | metre | 440.14 | ₹13,204.2 |
| 10 | Dismantling of Structures (Dismantling of existing existing structures structures like culverts culverts, bridges bridges, retaining retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
II By Mechanical Means
b) Reinforced Cement Concrete | 39.34 | Cum | 708.51 | ₹27,872.78 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.02 MB
Tendernotice_2.pdf
PDF • 8.22 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_76371.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .