SE ETC Mathura
132 KV S/S Aurangabad Mathura
Work of Transportation Erection and Commissioning of emergency restoration system ERS on 220 KV Agra Gokul Line near 400 KV Pilipokhar Agra Under ETD, Mathura
2022_UPTCL_724836_2
31/ETC(M)/22-23
Open Tender
Electrical Works
Lump-sum
90 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD Mathura
₹20,000
18 Oct 2022
23 Sept 2022
14 Oct 2022
23 Sept 2022
11 Oct 2022
23 Sept 2022
Amount
Execution of ERS (Emergency Restoration System) work for diversion of 220 KV Agra-Gokul S/C Line Under ETD, Mathura. The job includes the following works.
ERS Material Transportation from 400 KV Substation Greater Noida store to work site at 400 KV S/S Agra Pilipokhar end (Dist. approx 300 Km) under Transit Insurance. ERS Tower Erection complete in all respects with anchoring arrangement and safely Dismantling of ERS Material at site and returning to 400 KV Substation Greater Noida store under Transit Insurance as received originally. Note - All parts of ERS system is to be returned except consumeables like conductor, fitting etc.
Destringing of all 3Ø conductor & Earthwire between tower no 1 & 3 and Tower no 4 & 5 of 220 KV Agra-Gokul S/C Line (0.75 Km)
Stringing of 3 phase Conductor & Earthwire in between tower loc no 1 & 5 of 220 KV Agra-Gokul S/C Line (1.2 Km) after erection of ERS tower and jumpering at both end and associated works.
Destringing of all 3 Phase conductors & Earthwire (Approx 1.2 Km) of ERS Line section and safe removal of ERS Towers after restoration of main transmission through newly constructed M/C Line and properly rolling of conductor in drums ( provided by department) and safely shifting of conductor in the store under ETD, Mathura
Arrangement of watch and ward round the clock with atleast 4 nos security guards secutity is each shift at ERS location and from start of ERS installation work to till the dismantling of ERS tower and conductor with hardware fittings is done at site of Agra (Pilipokhar) end.
Note - All risk insurnace for the expecution of work covering material damage / theft at sites and transit Insurance charge shall be paid to contractor as actual.
Vindhya Vasini Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .