| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 CrAdmitted-Finance NH 3 A 140 PO VINDHYA NAGAR DIST SINGRAULI MP 486885 | SINGRAULI | MADHYA PRADESH | 486885 | ₹21.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹25.6 CrAdmitted-Finance | ₹25.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹35.7 CrAdmitted-Finance | ₹35.7 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TIRANGA CONSTRUCTION L1 | M/s Simar Infrastructures Limited L2 | MP SUDHAKARAN L3 |
|---|---|---|---|---|---|---|
| 1.0010.1 PART-A : Round the clock Routine (in 3 shifts), Preventive, Minor Breakdown maintenance and equipment cleaning work of Main Turbine and it’s Associated Auxiliaries 2X660MW JTPS | ||||||
| 1.01 | 10.1.1 Round the clock Routine maintenance (in 03 shifts ) & Preventive Maintenance, and Equipment Cleaning work of Main Turbine and it’s Associated Auxiliary like MBFP, TBFP, CEP, Vacuum pump, DMCW Pump & other small pumps , in day shifts. (One job consists of 24 hrs. work). | 730 | Nos | 29,000 ₹2.1 Cr | 31,562 ₹2.3 Cr | 15,000 ₹1.1 Cr |
| 2.0010.2 PART-B : Operation of TG hall/BFP bay EOT Crane | ||||||
| 2.01 | 10.2.1 Operation of two Nos. TG hall EOT crane Capacity: 210/30T & two nos BFP bay EOT crane 65/5T (One Job will be of eight hours duration operation). | 730 | Nos | 2,000 ₹14.6 L | 1,315 ₹9.6 L | 2,000 ₹14.6 L |
| 3.0010.3 PART-C: Routine preventive/Breakdown maintenance of Main TG area auxiliaries like BFP, CEP, Vacuum pump, DMCW Pump & other small pumps | ||||||
| 3.01 | 10.3.01 Re-visioning/ Replacement of DE journal bearing of MDBFP/ TDBFP Booster Pump. | 8 | Nos | 4,700 ₹37,600 | 5,000 ₹40,000 | 1,250 ₹10,000 |
| 3.02 | 10.3.02 Re-visioning/ Replacement of NDE journal bearing of MDBFP/ TDBFP Booster Pump. | 8 | Nos | 4,700 ₹37,600 | 5,000 ₹40,000 | 1,250 ₹10,000 |
| 3.03 | 10.3.03 Re-visioning/ Replacement of NDE Thrust Bearing of MDBFP/ TDBFP Booster Pump. | 8 | Nos | 4,700 ₹37,600 | 3,500 ₹28,000 | 1,250 ₹10,000 |
| 3.04 | 10.3.04 Re-visioning/ Replacement of NDE Mech. Seal of MDBFP/ TDBFP Booster Pump. | 8 | Nos | 8,300 ₹66,400 | 3,000 ₹24,000 | 1,250 ₹10,000 |
| 3.05 | 10.3.05 Re-visioning/ Replacement of DE Mech. Seal of MDBFP/ TDBFP Booster Pump. | 8 | Nos | 9,200 ₹73,600 | 3,000 ₹24,000 | 1,250 ₹10,000 |
Tender Value
₹20.2 Cr
EMD Value
₹21 L
Closing Date
5 Oct 2023, 5:00 pmClosed
SE EMCC 2
OFFICE OF SUPERINTENDING ENGINEER CIRCLE 2 2X6660MW JTPS MALAWAN ETAH
BIENNIAL CONTRACT FOR MECHANICAL MAINTENANCE (PREVENTIVE ROUTINE BD OH) AND OPERATIONAL SUPPORT OF EQUIPMENTS OF MAIN PLANT BOILER AND AUX TG AND AUX AND BOP (EXCLUDING MAJOR OVERHAULS OF BOILER AND TURBINE) AT 2X660 MW JAWAHARPUR THERMAL POWER S
2023_RVUNL_828025_1
ST-01/EMCC-II/JTPS/2023-24
Open Tender
Repair and Maintenance Works
730 days
2X660MW JTPS MALAWAN ETAH
AS PER PQC MENTIONED IN TENDER DOCUMENT
3 documents required · 3 mandatory
₹11,800
DY Chief Finance and Account Officer JTPS MALAWAN
₹21 L
OFFICE OF SUPERINTENDING ENGINEER CIRCLE2
16 Nov 2023
10 Aug 2023
6 Oct 2023
10 Aug 2023
5 Oct 2023
10 Aug 2023
10 Aug 2023 - 25 Aug 2023
20 Sept 2023
Amount
10.1 PART-A : Round the clock Routine (in 3 shifts), Preventive, Minor Breakdown maintenance and equipment cleaning work of Main Turbine and it’s Associated Auxiliaries 2X660MW JTPS
10.1.1 Round the clock Routine maintenance (in 03 shifts ) & Preventive Maintenance, and Equipment Cleaning work of Main Turbine and it’s Associated Auxiliary like MBFP, TBFP, CEP, Vacuum pump, DMCW Pump & other small pumps , in day shifts. (One job consists of 24 hrs. work).
10.2 PART-B : Operation of TG hall/BFP bay EOT Crane
10.2.1 Operation of two Nos. TG hall EOT crane Capacity: 210/30T & two nos BFP bay EOT crane 65/5T (One Job will be of eight hours duration operation).
10.3 PART-C: Routine preventive/Breakdown maintenance of Main TG area auxiliaries like BFP, CEP, Vacuum pump, DMCW Pump & other small pumps
10.3.01 Re-visioning/ Replacement of DE journal bearing of MDBFP/ TDBFP Booster Pump.
10.3.02 Re-visioning/ Replacement of NDE journal bearing of MDBFP/ TDBFP Booster Pump.
10.3.03 Re-visioning/ Replacement of NDE Thrust Bearing of MDBFP/ TDBFP Booster Pump.
10.3.04 Re-visioning/ Replacement of NDE Mech. Seal of MDBFP/ TDBFP Booster Pump.
10.3.05 Re-visioning/ Replacement of DE Mech. Seal of MDBFP/ TDBFP Booster Pump.
10.3.06 Inspection/ Minor Overhauling of Booster Pump of TDBFP/ MDBFP
10.3.07 Re-visioning/ Replacement of DE journal bearing of MDBFP/TDBFP
10.3.08 Re-visioning/ Replacement of NDE journal bearing of MDBFP/ TDBFP
10.3.09 Re-visioning/ Replacement of NDE Thrust Bearing of MDBFP/ TDBFP
10.3.10 Re-visioning/ Replacement of NDE Mech. Seal of MDBFP/ TDBFP.
10.3.11 Re-visioning/ Replacement of DE Mech. Seal of MDBFP/TDBFP
10.3.12 Thread out of BFP Cartridge as per the scope of work.
10.3.13 Thread in of BFP Cartridge as per the scope of work.
10.3.14 Miscellaneous revisioning work of Hydraulic coupling
10.3.15 Re-visioning of Thrust cum radial bearing no. 1 of BFP-Turbine.
10.3.16Re-visioning of rear journal bearing no. 2 of BFP-Turbine
10.3.17 Inspection/ overhauling of Gear Box of BFP Turbine.
10.3.18 Inspection/ rectification/ replacement of thrust cum radial bearing of CEP
10.3.19 Inspection/ rectification/ replacement of thrust cum radial bearing of Drip Pump
10.3.20 Re-visioning/ replacement of Mech. Seal of CEP
10.3.21 Re-visioning/ replacement of Mech. Seal of Drip pump
10.3.22 Complete Overhauling of Condensate Extraction Pump.
10.3.23 Replacement of Condensate Extraction Pump
10.3.24 Complete Overhauling of Drip Pump.
10.3.25 Axial & Radial alignment of horizontal equipment like MDBFP to Hydraulic coupling/ Hydraulic coupling to Motor/ Motor to Booster pump/ TDBFP to Drive Turbine/ Drive Turbine to Gear box/ Gear box to Booster pump
10.3.26 Complete servicing/overhauling of vacuum pump.
10.3.27 Replacement/Servicing of DE bearing of main vacuums pump.
10.3.28 Replacement/Servicing of NDE bearing of main vacuum pump.
10.3.29 Replacement of DE Mechanical Seal/ gland of main vacuum pump.
10.3.30 Replacement of NDE Mechanical Seal/ gland of main vacuum pump.
10.3.31 Replacement/Servicing of White metal bearing of Motor. (Booster Pump side /Hydraulic Coupling side).
10.3.32 Servicing/ Overhauling Portable Oil Purifier of MDBFP.
10.3.33 Overhauling of TDBFP/ Main TG/CLOST -transfer oil pump/oil purifier gear type oil pump
10.3.34 Axial and radial alignment of Vertical pump like Tank mounted lube oil pump of Main TG/ BFPT& condensate pump-CEP
10.3.35 High Capacity horizontal pump alignment
10.3.36 Low capacity horizontal pump alignment.
10.3.37 Replacement of coupling of equipment like of MDBFP/ TDBFP/CEP/Drip pump/Vacuum pump//DMCW pump/MOP/EOP of Main Turbine & BFP Drive Turbine.
10.3.38 Arresting oil leakage through the felt ring of MOP of Main Turbine/ Drive Turbine
10.3.39 Replacement of Main TG (Tank Mounted) MOP/EOP/TDBFP MOP/TDBFP EOP/MDBFP AOP
10.3.40 Rev/ Replacement of bearing of MOP/ EOP of main turbine/ BFP drive Turbine/ MDBFP AOP (One job consists one pump).
10.3.41 Low capacity water & Oil service Pump Mechanical Seal replacement
10.3.42 Low capacity water & Oil service Pump Bearing replacement
10.3.43 Complete Overhauling/ Servicing of Low capacity water & oil service pump.
10.3.44 Repair/ Overhauling of DMCW Pump
10.3.45 O/H of Vapour extractor of MOT/ Control Fluid Tank/ TDBFP Oil Tank/GSC vapour extractor.
10.3.46 O/H of Sump Pump/ Dewatering Pump
10.3.47 Replacement/ Inspection/ Revisioning of EH control oil unit pump of Main Turbine/ HP bypass valve
10.3.48 Checking & filling of N2 gas in accumulators
10.3.49 Replacement of N2 Bladders/ Service of accumulators of oil tank.
10.3.50 Overhauling of Hydrazine/ Ammonia dosing pump
10.3.51 TG Hall (210/30 MT) / BFP EOT (65/5 MT) EOT Crane –Attend Defect
10.3.52 Inspection, Testing & Issue of required Statutory test certificate for TG Hall (210/30 MT) / BFP EOT (65/5MT) EOT Crane
PART-D: Routine preventive and Breakdown maintenance work of TG Area: Tanks/ Heaters/ Strainers/Condenser Jobs
10.4.01 Replacement of the Burst Atmospheric relief Diaphragm of LP Turbine/ Drive Turbine.
10.4.02 Inspection of last stage blades of LP Turbine and minor repair work if required.
10.4.03 Oil Replacement/Tank cleaning & Minor revisioning of Main Turbine EHC unit Oil /Turbine HP Bypass Oil.
10.4.04 Steam Turbine Preservation
10.4.05 CEP /BFP BP/DMCW Pump (Suction Strainer) Cleaning
10.4.06 BFP Main pump Suction Strainer Cleaning
10.4.07 MOT Duplex Filter/ Return oil MOT strainers Cleaning
10.4.08 Centrifuging of Lub Oil through Portable Centrifuging machine. Operation of External Centrifuge/Purifier on Lub oil/Control fluid system/oil barrels
10.4.09 Bowl cleaning of Portable centrifuge
10.4.10 Cartridges replacement of Main Turbine/Drive Turbine/CLOST Oil Conditioners
10.4.11 Inspection/ cleaning, flushing and normalization of Deaerator
10.4.12 Inspection/ cleaning, flushing and normalization of Condenser hot well (One Condenser)
10.4.13 Condenser (WATERBOX) Cleaning
10.4.14 Inspection, cleaning and adjustment of Condenser COLTCS Screen
10.4.15 Tank Cleaning -TG DMCW O/H tank / Drip tank/ flash tank (either of LP/HP/Atm FT/). (One job consists one tank)
10.4.16 Inspection and Cleaning of MOT Tank/COT/DOT Tank
10.4.17 Inspection and Cleaning TDBFP MOT Tank
10.4.18 Inspection/ Cleaning of MOT Oil Plate Heat Exchanger
10.4.19 Inspection/ Cleaning of MDBFP & TDBFP Lube oil /working oil Plate Heat Exchanger
10.4.20 HP Heater / LP Heater /DE super heater/GSC Internal inspection/servicing & attend tube leakage
10.4.21 HP Heater/ LPHeater /DE Superheater/ GSC manhole door gasket replacement
10.4.22 Tube & Shell type cooler cleaning
10.4.23 Cleaning of sump pits of T/G Area.
10.4.24 Filling, Flushing and normalization of TG DMCW System
10.4.25 Performing of system vacuum and Condenser tube leak test and attending all the leakages by plugging and welding, if any.
10.4.26 Hanger Check and attend defect
10.4.27 Revisioning / Servicing of Ball Collector of Condenser Tube Cleaning System.
10.4.28 Inspection/ minor repairing of ball catch strainer of condenser tube cleaning system installed inside CW return line of size: 2700 mm.
10.4.29 Cleaning of CEP Pit/ Condenser Pit/ BFPT Pit/ MOT pit
PART-E: Breakdown maintenance work of TG Area: Servicing/ overhauling of Valves/ NRV/PRV
10.5.01 Main TG/BFPT: MSV/MCV servomotor servicing
10.5.02 HP/ LP BP Valve Servicing
10.5.03 LP Valve Servicing: motor/ pneumatic operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Size: (Dia < 6”) Class: 150-800.
10.5.04 LP Valve Servicing: motor/ pneumatic operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Size: (Dia 6" - 12") Class: 150-800.
10.5.05 LP Valve Servicing (per mm dia. Basis): motor/ pneumatic operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Size: (Dia >12") Class: 150-800.
10.5.06 HP Valve Servicing: motor/ pneumatic operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Size: (Dia < 6”) Class: >800.
10.5.07 HP Valve Servicing: motor/ pneumatic operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Size: (Dia 6" - 12") Class: >800.
10.5.08 HP Valve Servicing (per mm dia. Basis): motor/ pneumatic operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Size: (Dia >12") Class: >800.
10.5.09 Repair/ Replacement of LP piping by cutting & welding on per mm ID basis.
10.5.10 Replacement of flange type gate / globe valves/butterfly valves of LP lines on per mm dia. basis of valve.
10.5.11 High pressure TIG Welding per one inch of welding
10.5.12 Safety Valve (1”-4") Servicing
10.5.13 Safety Valve (>4”-8") Servicing
10.5.14 Safety Valve (>8") Servicing
10.5.15 Revisioning / Servicing of Butterfly valves; Size: <6”
10.5.16 Revisioning / Servicing of Butterfly valves; Size: 6” – 12”
10.5.17 Revisioning / Servicing of Butterfly valve Size: >12”
10.5.18 Servicing of valve Gear Box Size: Up to 12”
10.5.19 Servicing of valve Gear Box Size: > 12”
10.5.20 Flange (Above DN300) Attend Defect
10.5.21 Replacement of flange gasket of HP/ LP valves, Piping & fittings on per mm dia. basis of valve.
10.5.22 Expansion Joints (UPTO 1000MM) Replacement
PART-F: Breakdown maintenance work of TG Area: Replacement of Valves/ NRV/PRV & Miscellaneous work
10.6.01 LP Valves -Replacement on per mm dia basis, Class: 150-800
10.6.02 HP valves- Replacement on per mm dia basis, Class: > 800
10.6.03 Steam Piping (DIA<=6") Stress Relieving
10.6.04 Steam Piping (DIA>6") Stress Relieving
10.6.05 Fabrication & Erection of platform, stairs & Rack on Tonnage basis
10.6.06 Erection of Scaffolding
PART-G: General cleaning of turbine area for 2X660 MW JTPS , Malawan Etah
10.7.01 Daily Cleaning work of all Floors, stairs, railings, trenches, door etc in the turbine area.
10.7.02 Weekly Cleaning work of ventilation and cooling air ducts, piping, columns, etc in the turbine area.
10.7.03 Mechanised cleaning of T.G. floor, 2X660 MW-JTPS, Malawan Etah
Operation and general up keeping of Workshop Machines/Equipments for 2X660 MW, JTPS.
10.8.1 Operation and up keeping of Machine and Equipments
10.8.2 Housekeeping, Workshop Machines, Cleaning and oiling and General cleaning of Workshop.
20.010 Routine and Preventive/Breakdown Maintenance of Main Boiler & its accessories Including Pressure Part , Soot Blowers, HP Valves, LP Water Pumps, Online sealing of Valves, Insulation Refractory works etc and Daily Routine Maintenance of Main Boiler as well as Auxiliary Boiler and cleaning activities of these in general shift of 2X660 MW,JTPS Malawan Etah for a period of 02 Year.
20.1 Preventive/Breakdown maintenance of Pressure Parts
20.1.1 Attending tube leakage up to 1st ten H.P. weld joints. (irrespective of number H.P. weld joints in one frequency)
20.1.2 Attending tube leakages for each H.P. weld joints beyond 10 Nos. of H.P. weld joint.
20.1.3 Boiler HP Joint Radiography
20.1.4 Fixing of Scaffolding during Attending Tube Leakage.
20.1.5 Sky Climber Installation and Removal.
20.1.6 Eco Coils Attend defect online.
20.1.7 Stress Relieving of HP Joints.
20.1.8 Boiler (Tube Bends) Fabrication.
20.1.9 Boiler Segment Shield Welding.
20.1.10Boiler Peep/Man Hole Attend Defect.
20.1.11 Hanger Inspection.
20.1.12 Hanger Servicing.
20.2 Preventive/Breakdown maintenance of soot blowers
20.2.1 Wall Blower/LRSB Over hauling
20.2.2 Attending Defect of Soot Blower Valve
20.2.3 Wall Blower Servicing.
20.2.4 Operation & Maintenance of LRSB.
20.2.5 Flange (Gasket) Replacement of soot blowers.
20.3 Preventive/ Breakdown maintenance of sky climber
20.3.1 Testing of Sky climber after installation.
20.3.2 Over hauling of Sky Climber.
20.4 Removal of Honey comb from Boiler.
20.5 Over Hauling/Servicing of HP Valves.
20.5.1 Overhauling of Safety Valve.
20.5.2 Overhauling of Control Valve size up to 6".
20.5.3 Servicing of HP Valve size up to 6"
20.5.4 Servicing of HP Valve size above 6" to 12"
20.5.5 Servicing of HP Valve size above 12"
20.5.6 Servicing of NRV size 6" to 12"
20.5.7 Servicing of NRV size below 6"
20.5.8 Servicing of NRV size above 12"
20.5.9 Overhauling of E/M Relief Valve.
20.5.10 Gland Replacement of HP Valve.
20.6 Preventive/ Breakdown & Over hauling of Boiler fans.
20.6.1 Coupling and alignment of Fan.
20.6.2 Overhauling of Fan.
20.7 Checking and Fault removal of Oil gun assembly.
20.8 Preventive/Breakdown maintenance of duct & dampers
20.8.1 Attending defect of dampers and Gate.
20.8.2 Replacement of Damaged portion of Duct.
20.8.3 Repair of damaged Expansion Joints.
20.9 Preventive/ Breakdown maintenance of LP water pumps.
20.9.1 Servicing of LP Water Pump.
20.9.2 Replacement of LP Water Pump Bearing.
20.9.3 Replacement of LP Water Pump Gland.
20.9.4 Coupling and alignment of LP Water Pump.
20.10 Removal and Installation of Scanner hose/Purg air hose Pipe.
20.11 Preventive/ Breakdown maintenance of lube oil system of hydraulic valves.
20.11.1 Replacement of Lube oil Pump.
20.11.2 Over hauling of Lube oil System.
20.11.3 Alignment of Lub Oil Pump Coupling
20.12 Servicing of Electrical hoist
20.13 Servicing of LP Valve size up to 6".
20.14 Replacement of LP Valve (Flange Type) size up to 6".
20.15 Insulation & Refractory of Boiler and Turbine area.
20.16 NDT (Die Penetration) DPT.
20.17 Structural Fabrication.
20.18 Online Leak sealing of HP Valve.
20.18.1 Attending defect of online
20.18.2 Ring Clamp(above 2") attend defect
20.18.3 Box Clamp(above 9") attend defect
20.21 Online Safety Valve set pressure verification and set pressure adjustment by Valtest method for safety Valve installed in Boiler area.
20.21.1 Safety Valve setting
20.21.2 Including Travelling charges with fare expenses issued.
20.22 Daily routine maintenance work scope including burners, scanner air fan, purge air fan, Checking of soot blowers, oil gun cleaning etc. in respect of Main boiler as well as Aux boiler work round the clock (one job= 2 boiler 660 MW per day)
20.23 Cleaning of boiler and other associated work of 2X660 MW as well as Aux boiler. As per scope of work (one job= 1 boiler 660 MW per day)
30 Round the Clock Operation and Maintenance Works of Bowl Mill, Gravimetric Coal Feeder, Coal Mill Reject System, ID/FD/PA Fan and its associated system of 2X660 MW Jawaharpur Thermal Power Station, Malawan, Etah for a period of 02 Year
30.1 ROUND THE CLOCK ROUTINE, PREVENTIVE & BREAKDOWN MECHANICAL MAINTENANCE OF BOWL MILL AND ITS ASSOCIATED SYSTEM AS PER SCOPE OF WORK AND BILL OF QUANTITY.
30.1.1 Inspection/ Replacement Of Mill Coupling
30.1.2 Oil Replacement Of Mill Roller Assly/ Gear Box/ Centrifuging Of Oil
30.1.3 Replacement Of Bull Ring Segment (Grinding Table segments)
30.1.4 Adjustment/ Repair Of Separator Body Assembly/ Classifier Servicing
30.1.5 MDV/KGV/ Burner Inlet Gate/Variable Orifice/Transition Piece Replacement
30.1.6 Repair/Replacement Of Scraper Assy.
30.1.7 Replacement / Checking Of Labyrinth Seal (Sealing air chamber ring) Assembly Per mill
30.1.8 Mill Gearbox Input Shaft/ Bearing Replacement
30.1.9 Cleaning, Greasing, Servicing of electrically operated hoist.
30.1.10Structure Fabrication
30.1.11 Replacement of Roller Assembly.
30.1.12 Replacement Of Worn Out Grinding Roll (Tyre) With New/Healthy One including Servicing of Roller assembly.
30.1.13 Replacement/Repairing of Airport Ring Assembly (Louver ring, scatter ring). Complete One Set (One Set Consist Of 08 Pieces).
30.1.14 Repairing/Replacement Of Bowl Extension Ring Segment (Dam ring and wear ring).
30.1.15 Repairing Eroded Portion Of Classifier Inner Cone (Grit cone).
30.1.16 Complete Dense Hard Facing of Airport Ring Assembly & Extension Ring (Armour ring, Louver ring, scatter ring, dam ring, wear ring and other mill internals) With L&T-670/700 Hard Facing Electrode.
30.1.17 Servicing Of Lube Oil System Of Mills (One Mill Makes One Job).
30.1.18 Replacement/servicing of journal stop bolt (Buffer stopper with bushing)
30.1.19 Checking/replacement of (leaking) victaulic coupling (QRC) rubber gasket of MDV/ Transition piece
30.1.20 Replacement/ refitting/servicing of classifier blade
30.1.21 Replacement of mill side (body) liner
30.1.22 Servicing of seal air valve on seal air header of mills/Rocker arm
30.1.23 Complete overhauling of Roller Assembly
30.1.24 Servicing of HSLM Cabinet system with Nitrogen gas system and hydraulic cylinders/ pistons of one mill
30.1.25 Replacement of Rocker arm bearings
30.1.26 Servicing/ Overhauling of Hydraulic swing cylinders
30.1.27 Replacement of Rocker Arm
30.1.28 Replacement of Armour plates of mill body door housing & Rocker arm
30.1.29 Round The Clock Routine Maintenance Of Bowl Mills, RC Feeders, Coal pipes & other Miscellaneous work.
30.1.30 Cleaning/ Removal of choking from the split raw coal pipe from bunker outlet gate to bowl mill (mainly during rainy season) choked due to wet coal in the form of slurry/sticky.
30.2 BREAKDOWN MECHANICAL MAINTENANCE OF RC FEEDER AND COAL PIPE AS PER SCOPE OF WORK AND BILL OF QUANTITY.
30.2.1 Inspection and Maintenance Gravimetric Feeder
30.2.2 Replacement of Belt
30.2.3 Replacement of Belt Drive Reducer
30.2.4 Servicing of Belt Drive Reducer & Eddy Current Clutch Coupling
30.2.5 Replacement of Clean out Conveyor Drive Reducer
30.2.6 Servicing of Clean Out Conveyor Drive Reducer
30.2.7 Replacement of Head/Tail Pulleys/ Idlers/ Coc Shaft of Coal Feeder
30.2.8 Servicing of Feeder Inlet/Outlet Gates/ Bunker Outlet Gates
30.2.9 Feeder Bearing Replacement
30.2.10 Attend Breakdown of Feeder
30.2.11 Removal of choking from Coal Pipe
30.2.12 Replacement of Center Feed Pipe Coupling Area with SS Spool Piece
30.2.13 Replacement Coal Pipe Coupling Gasket/ Coupling Assy
30.2.14 Attending Coal Dust Leakage
30.2.15 Welding/ Patch Welding Work for Repairing
30.2.16 Straight Pipe Rotation/ Replacement of Pulverize Fuel Pipe
30.2.17 Coal Pipe Bend Replacement
30.2.18 Repairing/Adjustment of Fuel Piping Supports/ Hangers
30.3 ROUND THE CLOCK ROUTINE, PREVENTIVE MECHANICAL MAINTENANCE OF COAL MILL REJECTS SYSTEM AND ITS ASSOCIATED SYSTEM.
30.3.1Round The Clock Operation PLC (Auto) Room/ Manually From Mill Site And Compressor For Coal Mill Reject Handling System And Routine/ Preventive Maintenance Of Pneumatic Coal Mill Reject Handling System & Compressor With Air Receiver Tank And Air Pipe Lines Etc. Along With The House Keeping Of Reject System And Near By Area. ( Like Reject Hoppers,Mill Gear Box, Mill Motor Coupling Etc).
30.3.2 Round the Clock Handling, Lifting and Shifting of Coal Mill Reject from
30.3.2.1 Mill Floor at ‘0’ Meter.
30.3.2.2 Below the Silo
30.4 ROUTINE, PREVENTIVE & BREAKDOWN MECHANICAL MAINTENANCE OF ID/FD/PA FAN AND ITS ASSOCIATED SYSTEM AS PER SCOPE OF WORK AND BILL OF QUANTITY.
30.4.1 Repairing Of ID/FD/PA Fan
30.4.2 Arresting Of Lube Oil Leakage (Inside Casing) Of ID/FD/PA Fan
30.4.3 Maintenance Of Lube Oil System (FD/ PA/ ID)
30.4.4 Maintenance Of Mill Seal Air Fan / ID Fan Seal Air Fan
30.4.5 Overhauling Of Mill Seal Air Fan/ ID Fan Seal Air Fans
30.4.6 De-Coupling, Coupling And Alignment Of Mill Seal Air Fan / ID Fan Seal Air Fan
30.4.7 Routine Maintenance Of ID/FD/PA Fans, ECW & APH System during General shift per Day and other Miscellaneous work
30.5 Preventive & Breakdown Mechanical Maintenance of APH and Its Associated System as per Scope of Work and Bill of Quantity.
30.5.1 Replacement/ Rectification and setting out Board/ Middle Board/ In Board Radial Seal and Circumferential (By Pass) Seals and Plates of Hot End & Cold End of Air Pre-Heater.
30.5.2 Repairing/ Replacement of Static Seal Plates by Fabrication, Cutting, Grinding, Welding of Hot End & Cold End of APH for Sector Plate.
30.5.3 Repairing/ Replacement of Rotor Post Seal of Hot End & Cold End of APH
30.5.4 Resetting/ Replacement of Axial Seal and Leveling of Axial Seal Plate by means of Adjusting Bolt in APH
30.5.5 Servicing of Lube Oil System of Guide/ Support Bearing of APH. One Job include One Lube Oil System.
30.5.6 Replacement of Guide Bearing
30.5.7 Replacement of Support Bearing
30.5.8 Replacement of Guide Trunion
30.5.9 Inspection & Housing Level Checking of Support Bearing or Guide Bearing of APH
30.5.10 Air Seal Housing Inspection and Replacement of Packing Rope of Guide or Support Bearing
30.5.11 Inspection of Gear Box, Drive Pinion & Pin Rack
30.5.12 Gear Boxes overhauling (RDU/SDU)
30.5.13 PM of Air Motor and Associated Valves/ Lines of APH
30.5.14 Servicing/ Replacement of Air Motor and Associated Valves/ Lines
30.5.15 Repair/ Cleaning or Replacement of APH Wash and Fire-Fighting Lines
30.5.16 Trial Run of Air Heater
30.5.17 Air Receiver Tanks Testing
30.5.18 Replacement of Main Drive Gear Box
30.5.19 Air Seal Assembly Repair
30.5.20 Rotor Inspection
30.5.21 Overhauling of APH Soot Blowers
30.5.22 Attending Defects of APH Soot Blowers
30.5.23 Servicing of APH Soot Blower
40 1.Routine, Preventive Maintenance,Breakdown Maintenance (Mechanical), General Up keeping of CW/ACW pumps and it’s Auxiliaries, EOT cranes/ Mono Rail Cranes, Natural Draft Cooling Tower system 2. Routine, Preventive Maintenance,Breakdown Maintenance (Mechanical) of Intake pumps, travelling screen, Raw water pumps (Ash water pumps and Raw water to PTP), Rain water pump, coolers, channel gate, strainers, LOP, all others equipment associated to above systems and EOT crane 03 Nos. 5Ton M/s. Reva make, 02 Mono rail Crane capacity <3Ton for 2x660 MW, JTPS for 2x660 MW, JTPS. 3. Routine, Preventive Maintenance,Breakdown Maintenance (Mechanical) of all water/lube/sludge pumps, 15 pumps of clarified pump house, 15 pumps of D.M. Water pump house, 04 Condensate Water pump house, coolers, strainers, LOP, all others equipment associated to above systems and EOT crane 03 Nos. (5Ton M/s. Reva make), JTPS. of 2x660 MW, JTPS
40.1.01 1. Routine, Preventive (Mechanical) of M/s. KSB make CW Pumps (05Nos., 2W/Unit+1S), ACW Pumps (03Nos., 1W/Unit+1S) and CW LOP water pump total; 10No. (1W+1S)/Unit, M/s. GE Power make- ACW Self Cleaning Strainer 04Nos., (1W+1S)/Unit, ACW PHE (Plate Heat Exchanger) -04Nos {1W+1S}/Unit) and Valves/Butterfly Valves associated with CW & ACW system(Skilled -01, Semi Skilled -02, Unskilled-01)INTAKE/RAW WATER/ Rain water pumpSYSTEM 2.RUNNING ROUTINE AND PREVENTIVE MAINTENANCE OF NATURAL DROUGHT COOLING TOWER SYSTEM 3.Routine, Preventive Maintenance (Mechanical), General Up keeping of Intake pumps, travelling screen, Raw water pumps(Ash water pumps and Raw water to PTP), Rain water pump, coolers, channel gate, strainers, LOP, all others equipment associated such as coolers, channel gate, strainers, LOP, flanges, all types of valves/B.F., pipes and all others equipment associated to above systems 4. Routine, Preventive Maintenance (Mechanical), General Up keeping of 15pumps of clarified pump house, 15 pumps of D.M. Water pump house, 04 Condensate Water pump and all others equipment associated such as coolers, channel , strainers, LOP, flanges, all types of valves/B.F., pipes and all others equipment associated to above systems.
40.2 1.EOT AND MONO RAIL CRANES OF C.W.PUMP HOUSE Routine, Preventive Maintenance (Mechanical) of EOT crane 03 Nos. (01No. 50/5Ton M/s. Rewa make, Mono rail Crane capacity 3Ton (Total 02 Nos.). 2.EOT AND MONO RAIL CRANES:- INTAKE,RAW WATER AND RAIN WATER PUMP HOUSE- Routine, Preventive Maintenance (Mechanical) of EOT crane 03 Nos. 5Ton M/s. Rewa make, 3.EOT AND MONO RAIL CRANES:- CLARIFIED , D.M. WATER AND CONDENSATE PUMP HOUSE- Routine, Preventive Maintenance (Mechanical) of EOT crane 03Nos. 5Ton M/s. Rewa make, Mono rail Crane capacity 3Ton (Total 02 Nos.) 4. EOT CRANES OF GIS BUILDING. Routine, Preventive Maintenance (Mechanical) of EOT crane 03 Nos.(<10Ton) M/s. Rewa make,
40.3 Breakdown Maintenance (Mechanical) of M/s. KSB make CW Pumps (05Nos., 2W/Unit+1S), ACW Pumps (03Nos., 1W/Unit+1S) and CW Lub water pump total; 10No. (1W+1S)/Unit, M/s. GE Power make- ACW Self Cleaning Strainer 04Nos., (1W+1S)/Unit, ACW PHE (Plate Heat Exchanger) -04Nos {1W+1S}/Unit) and Valves/Butterfly Valves associated with CW & ACW system and EOT crane 03 Nos. (01No. 50/5Ton M/s. Rewa make, Mono rail Crane capacity 5Ton to 10Ton (Total 10 Nos.) for 2x660 MW, JTPS.
40.3.1 Decoupling & coupling of motor and CW pump (while motor replacement)/motor removal and fitting of motor of CW pump
40.3.2 Alignment of motor and CW pump
40.3.3 Break down maintenance/Overhauling of CW pump
40.3.4 Decoupling & coupling of motor and ACW/Raw Water(Ash water /PTP)/Rain Water pump with adjustment of pump lift (while motor replacement)/motor removal and fitting of ACW motor
40.3.5 Alignment of motor and ACW/Raw Water(Ash water /PTP)/Rain Water pump
40.3.6 Break down maintenance/Overhauling of ACW/Raw Water(Ash water /PTP)/Rain Water pump
40.3.7 Cleaning of screen of ACW/Raw Water(Ash water /PTP)/Rain Water pump
40.3.8 Servicing/Maintenance of Lub water cooling pump and attend defect
40.3.9 Cleaning of mesh of self-cleaning strainer
40.3.10 Servicing of self-cleaning strainer (including drive assembly)
40.3.11 Inspection/Cleaning and reconditioning of plate heat exchanger (PHE) OF ACW line
40.3.12 Servicing/maintenance of Air release vent (ARV) / Isolation valve and attend defect
40.3.13 Replacement of rubber sealing Ring (Door Seal ) of B/F valve <1000mm
40.3.14 Servicing of Butterfly valve <1000mm.
40.3.15 Replacement of Rubber sealing ring(Door seal) of Butterfly valve>1000mm.
40.3.16 Servicing of B/F valve >1000 mm.
40.3.17 Replacement of Expansion bellow
40.3.18 Cleaning of sump pit of CW/ACW Pump/Intake pump/Raw water pump.
40.3.19 Providing a Diving team of 03 Divers & 01 Supervisor 01 Helper for underwater diving services
40.4 Breakdown mechanical maintenance of Natural drought cooling tower system of 2x660 MW, JTPS, Malawan, Etah.
40.4.1 NDCT distribution Pipe/Nozzles Cleaning
40.5.3 NDCT Fill Packs replacement/cleaning (Online)
40.4.4 CT Basin Cleaning:- Cleaning (Mechanical cleaning)
40.5 Breakdown Maintenance (Mechanical) of all water/lube/sludge pumps clarified pump house, of D.M. Water pump house, Condensate Water pump house , NDCT and all water/lube/sludge pumps all for 2x660 MW, JTPS.
40.5.1 Breakdown/Overhauling of Horizontal Pump
40.5.1.1 Breakdown/Overhauling of Horizontal Pump: ( Capacity<100 M3/)
40.5.1.2 Breakdown/Overhauling of Horizontal Pump: (Capacity>100<=300 M3/)
40.5.1.3 Breakdown/Overhauling of Horizontal Pump: (Capacity>300 M3/)
40.5.2 Alignment of Horizontal Pump
40.5.2.1 Alignment of Horizontal Pump ( Capacity<100 M3/)
40.5.2.2 Alignment of Horizontal (Capacity>100<=300 M3/)
40.5.2.3 Alignment of Horizontal Pumps (Capacity>300 M3/)
40.5.3 Overhauling of Lube oil Pump:
40.5.4 Alignment of Lube oil Pump:
40.5.5 Overhauling of Various Centrifugal Pumps/Sludge disposal pump
40.5.6 Decoupling & coupling of motor and pump (while motor replacement)/motor removal and fitting of motor of pump(Clarified/D.M./Condensate etc)
40.5.7 Replacement of thrust bearing/spherical roller bearing
40.5.8 Attending Defects in Flanges
40.5.9 Replacement of Lube oil Pump.
40.6.10 Over hauling of Lube oil System.
40.6 Maintenance (Mechanical) of Electrical/manual/Portable Hoists / Inspection, Testing & Issue of required Statutory test certificate for EOT Crane for 2x660 MW, JTPS.
40.6.1 Servicing of Electrical hoist (Load range <03 T).
40.6.2 Servicing of Portable hoist (Load range <03 T
40.6.3 Inspection, Testing & Issue of required Statutory test certificate for CWPH EOT Crane (50/5 MT).
40.6.4 Inspection, Testing & Issue of required statutory test certificate for Cranes (>03 To12 ton capacity).
40.6.5 Inspection, Testing & Issue of required statutory test certificate for Cranes <=03 T
40.7 Break down maintenance of motor operated control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves
40.7.1 Overhauling of motor operated/manual control valve, motor operated gate/globe valves, manually operated gate/globe valves, check valves of Raw water, intake water, Clarified water, D.M. water, Condensate, CW, DMCW, ACW line valves (except butterfly valves) will be done as per following scope of work
40.7.1.1 Overhauling of motor operated/Manual Valve: Valve (Dia<6”)
40.7.1.2 Overhauling of motor operated/Manual Valve: Valve (Dia 6-12”)
40.7.1.3 Overhauling of motor operated/Manual Valve: Valve (Dia>12 -20”)
40.7.1.4 Overhauling of motor operated/Manual Valve: Valve (Dia>20 to32”)
40.7.1.5 Overhauling of motor operated/Manual Valve: Valve (Dia >32”)
40.7.2 Replacement of flange type(All) valves
40.7.2.1 Replacement of flange type gate / globe valves/butterfly valves of (Dia<06”)
40.7.2.2Replacement of motor operated /Manual Valve (Dia 6-12”)
40.7.2.3 Replacement of motor operated/Manual Valve (Dia 12-20”)
40.7.2.4 Replacement of motor operated/Manual Valve (Dia -21-32”)
40.7.2.5 Replacement of motor operated/Manual Valve (Dia >32”)
40.7.3 Expansion Joints Replacement
40.7.3.1 Expansion Joints (UPTO <32”) Replacement
40.7.3.2 Expansion Joints (>32”) Replacement
40.7.4 Attending Defects in Expansion Joints
40.8 Repair/ Replacement of various metal M.S./S.S./G.I./C.S. etc. and HDPE pipe line of various sizes
40.8.1Repairing in HDPE pipes
40.8.2 Laying of HDPE pipes
40.8.3 Attending Defects in pipes line
40.8.4 Erection/laying of Lines
40.8.4.1 Erection/laying of pipe Lines <=100mm
40.8.4.2 Erection/laying of pipe Lines, >100 to 400 mm
40.8.4.3 Erection/laying of pipe Lines,>400
40.8.5 Miscellaneous repairing / welding work of Pipe lines
40.9 Fabrication & Erection of Platform, Stairs, Rack, scaffolding on Tonnage basis
40.9.1 Fabrication & Erection of Platform, Stairs, Rack on Tonnage basis
40.9.2 Erection of scaffolding
40.10.1 Cleaning of water storage tank, Capacity-1200/1000/800 KL
40.11 General cleaning of Intake/Raw/Rain/C.W./Clarified/ D.M.Water/ CondensateB.O.P. Pump area for 2x660 MW JTPS , Malawan Etah
40.11.1 Daily Cleaning work of all Floors, stairs, railings, trenches, doors etc in the B.O.P. Pump area.
40.11.2 Weekly Cleaning work of ventilation and cooling air ducts/ piping, columns, etc in the BOP area.
40.11.3 Weekly Mechanized cleaning of BOP area- 2x660 MW, JTPS
40.12 COMPRESSED AIR SYSTEM
40.12.01 Routine preventive maintenance (mechanical) of M/s Atlas Copco make Instrument Air 04 Nos., Service air compressors 04 nos., Air Dryer 04 Nos, External Air coolers 04 Nos, Receiver tanks 08 nos.alongwith headers
50. Biennial Round the clock routine, preventive & breakdown mechanical maintenance and assisting in operation of complete Water & Waste Water Treatment Plant of 2X660 MW, JTPS, Malawan, Etah.
50.1 Round the clock routine, preventive maintenance and assisting in operation of complete Water & Waste Water Treatment Plant.
50.2 Breakdown mechanical maintenance of complete Water & Waste Water Treatment Plant,
50.2.1 Breakdown mechanical maintenance of Pre-Treatment Plant, DM Plant, Effluent Treat-ment Plant
50.2.1.1 Servicing / repairing of Valves (Dia<=100mm)
50.2.1.2 Servicing/repairing of Valves (Dia100mm-200mm)
50.2.1.3 Servicing/repairing of Valves (Dia>200mm)
50.2.1.4 Overhauling Valves (Dia=<100mm)
50.2.1.5 Overhauling Valves (Dia100mm-200mm)
50.2.1.6 Overhauling Valves (Dia>200mm)
50.2.1.7 Replacement of Valves (Dia=<100mm)
50.2.1.8 Replacement of Valves (Dia100mm-200mm)
50.2.1.9 Replacement of Valves (Dia>200mm)
50.2.1.10 Overhauling of Horizontal Pumps(LP)(dia<100 mm)
50.2.1.11 Overhauling of Horizontal Pumps(LP)(dia 100 mm-200 mm)
50.2.1.12 Overhauling of Horizontal Pumps(LP)(dia>200 mm)
50.2.1.13 Overhauling of Horizontal Pumps(HP)(dia 100 mm-200 mm)
50.2.1.14 Alignment of Horizontal Pumps(LP)(dia<100 mm)
50.2.1.15 Alignment of Horizontal Pumps(Dia100-200mm)
50.2.1.16 Alignment of Horizontal Pumps(Dia>200mm)
50.2.1.17 Servicing/repairing of Horizontal Pumps(LP)(Dia<100mm)
50.2.1.18 Servicing/repairing of Horizontal Pumps(LP/HP)(Dia100mm-200mm)
50.2.1.19 Servicing/repairing of Horizontal Pumps(Dia>200mm)
50.2.1.20 Overhauling of Agitators/Floculators
50.2.1.21 Servicing of Agitators/Floculators
50.2.1.22 Overhauling of Clarifloculator
50.2.1.23 Overhauling of Blowers
50.2.1.24 Bearing replacement of Blowers
50.2.1.25 Belt replacement of Blowers
50.2.1.26 Overhauling of Reciprocating pumps
50.2.1.27 Servicing/repairing of Reciprocating pumps
50.2.1.28 Servicing of NRV
50.2.1.29 servicing of Screw pump
50.2.1.30 Overhauling of Screw pump
50.2.1.31 Choking Removal of GI Pipe
50.2.1.32 Servicing of Water Channel Gates
50.2.1.33 Gland replacement of Water Pumps
50.2.1.34 Attending Defects in Flanges
50.2.1.35 Choking Removal of clarifloculator
50.2.1.36 Servicing of Clarifloculator Drive
50.2.1.37 Repair/Replacement of rail of Electrical Hoist
50.2.1.38 Repair/servicing of Clarifloculator Scrapers
50.2.1.39 Lifting of water Channel Gates
50.2.1.40 Misclleneous Welding Works
50.2.1.41 Replacement of the Cartridge Filter Element of RO /UF Water System
50.2.1.42 Inspection, Repair and Replacement of the RO/UF Membranes of RO Water System
50.2.1.43 Attending Defects in HDPE pipe
50.2.1.44 Laying of HDPE pipes(per mtr)
50.2.1.45 Erection/laying of SS Line(per mtr)
50.2.1.46 Replacement of Pressure Vessels for RO/UF of RO Water System
50.2.1.47 Replacement of Victaulic coupling/bushes, CPVC Valves & Fitting of RO /UF Water System
50.2.1.48 Inspection of Pressure Vessels
50.2.1.49 Servicng of V/V gear box
50.2.1.50 Cleaning of Tanks
50.2.1.51 Overhauling of Vertical pumps(100 mm -200 mm size)
50.2.1.52 Overhauling of Vertical pumps(200 mm -300 mm size)
50.2.1.53 Overhauling of Vertical pumps(>=300 mm)
50.2.1.54 Replacement of seal of Butterfly Valves(>300mm)
50.2.1.55 Servicing of Butterfly Valves(>300mm)
50.2.1.56 EOT/Cranes (>15-30MT) servicing
50.2.1.57 Cleaning of Pit/Sump
50.2.1.58 Replacement of MS piping (100mm-200mm)
50.2.1.59 Replacement of MSRL Pipes
50.2.1.60 Laying of ERW Pipes(per mtr)
50.2.1.61 Bulk Chemicals (RESIN) Hndlg&Stacking/inert gas cylinder /chlorine tonners unloading
50.2.1.62 Overhauling of vessels
50.2.1.63 Servicing of air blower
50.2.1.64 Strainer Cleaning/choking removal
50.2.1.65 Replacement/filling of Resin
50.2.1.66 Servicing of diaphragm chamber/oil pressure relief valves
50.2.1.67 Attending gland leakage of various pumps and valves
50.2.1.68 Maintenance of gear box of PT-CW/ETP Clarifier/Floculator
50.2.1.69 Coupling Bush replacement and alignment in vertical pump
50.2.1.70 Laying of MS pipe line(per mtr)
50.2.1.71 Maintenance of Air Vent & ARV
50.2.1.72 Painting
50.2.1.73 Replacement/servicing/repairing of ejectors
50.2.1.74 Re rubber lining of Acid/Alkali/FeCl3 storage tanks etc. with natural rubber 5 mm thickness 2 ply (Inner Side and outer side around neck and around holes.)
50.2.1.75 Re rubber lining of Acid/Alkali/FeCl3/PE/Brine solution/ARU/CRU/CMB/N.pit/RO/UF cleaning solution etc.dosing/measuring Tanks with two layer of neoprene rubber each having thickness of 2.5 mm.
50.2.1.76 Re rubber lining of one stream of cation tank with two layer of neoprene rubber each having thickness of 2.5 mm.
50.2.1.77 Re rubber lining of one stream of Degasser tanks with two layer of neoprene rubber each having thickness of 2.5 mm.
50.2.1.78 Re rubber lining of one stream of anion tank with two layer of neoprene rubber each having thickness of 2.5 mm.
50.2.1.79 Re rubber lining of one stream of mixed bed tank with two layer of neoprene rubber each having thickness of 2.5 mm.
50.2.1.80 Rubber lining/re- rubber lining of Pipe/ bends / Tee including both side flanges etc. [including fabrication works for flanges joining] with new pipe having sizes from 25 NB to 250 NB. [Running Meter measured at centre line of pipes used]
50.2.1.81 Protective coating of Epoxy paint including removal of old paint, rusted surface, preparation of surface by sand blasting, two coat of epoxy primer and two or more coat of epoxy paint on outer/inner surface of Acid storage tanks /Alkali Storage Tank/ Alum Solution Preparation Tank /PE storage Tank/Demi tank/UF Feed Tank/UF Backwash Tank/UF Permit Tank /other vessels / pipes of various sizes / bends / tee’s / and other Misc. work.
50.2.2 Breakdown mechanical maintenance of of CW/RW/PW Chlorination Plant, CW Treatment Plant & Side Stream Filtration Plant
50.2.2.1 Servicing of CW chlorinator
50.2.2.2 Servicing of RW chlorinator
50.2.2.3 Servicing of CW evaporator
50.2.2.4 Servicing of RW evaporator
50.2.2.5 Replacement /servicing of CW/RW/PW Remote Vacuum regulator
50.2.2.6 Replacement /servicing of CW/RW/PW pressure relief valve
50.2.2.7 Replacement /servicing of CW/RW /PW Flow meter
50.2.2.8 Replacement /servicing of CW/RW /PW Flow control valve
50.2.2.9 Replacement /servicing of CW Differential pressure regulator
50.2.2.10 Servicing of PW chlorinator
50.2.2.11 Servicing/cleaning of CW Cl2 absorption tower with suction duct network
50.2.2.12 Repairing /Servicing of CW Injector assembly with associated NRVs/valves
50.2.2.13 Repairing /Servicing of RW Injector assembly with associated NRVs/valves
50.2.2.14 Repairing /Servicing of PW Injector assembly with associated NRVs/valves
50.2.2.15 Repairing /Servicing of complete tonner manifold of CW with associated valves & expansion cylinders
50.2.2.16 Repairing /servicing of complete tonner manifold of RW with associated valves
50.2.2.17 Repairing /servicing of CW chlorine dispenser lines of one chlorinator & evaporator with associated valves & filters
50.2.2.18 Repairing /servicing of PW chlorine dispenser lines of one chlorinator with associated valves & filters
50.2.2.19 Repairing /servicing of RW chlorine dispenser lines of one chlorinator with associated valves & filters
50.2.2.20 Replacement of coupling and Alignment of Booster pump
50.2.2.21 Replacement of coupling and Alignment of Recirculation pump
50.2.2.22 Servicing of caustic recirculation pump
50.2.2.23 Servicing of CW Booster pump
50.2.2.24 Overhauling of caustic recirculation pump
50.2.2.25 Overhauling of CW Booster pump
50.2.2.26 Servicing of caustic Blowers
50.2.2.27 Overhauling of caustic Blowers
50.2.2.28 Bearing replacement of different pumps
50.2.2.29 Bearing replacement of Blower
50.2.2.30 Repairing /Servicing of valves sizes 0mm-50mm
50.2.2.31 Maintenance /Servicing of valves sizes>50 mm -100 mm
50.2.2.32 Maintenance /Servicing of valves sizes >100mm -200mm
50.2.2.33 Repairing /Servicing of PP diaphragm/check valves sizes -0mm- 80mm
50.2.2.34 Repairing/servicing of CPVC NRV/BALL valve 0MM-50 mm
50.2.2.35 Repairng/servicing of CPVC BF/Check Valve 100mm-150 mm
50.2.2.36 Repair of MS pipeline work to arrest leakage
50.2.2.37 Repair of HDPE pipeline for CW to arrest leakage of chlorine solution
50.2.2.38 Repair of HDPE pipeline for RW to arrest leakage of chlorine solution
50.2.2.39 Repairing /servicing of CW Forebay chlorine solution diffuser with associated valves
50.2.2.40 Repairing /servicing of RW parshall flume chlorine solution diffuser with associated valves
50.2.2.41 Replacement of CW chlorinator PVC vacuum pipeline with associated bends, tees, unions, flanges etc
50.2.2.42 Replacement of RW/PW chlorinator PVC vacuum pipeline with associated bends,tees, unions, flanges etc
50.2.2.43 Fabrication of lead gaskets ID 13mm, OD :20MM Thickness : 3mm (as per sample)
50.2.2.44 Refilling with maintenance /serving of oxygen cylinder and safety set
50.2.2.45Repairing /Servicing of emergency shower with associated pipe line & valve connected to source
50.2.2.46 Servicing of CW/RW line strainers
50.2.2.47 Attending B/d by re-rubber lining of different pipes, bend, pipes, Tee & Cross
50.2.2.48 Repairing /Servicing & revisioning of stroke adjustment of Acid dosing pump/scale inhibitor/corrosion inhibitor /biocide dosing pump
50.2.2.49 Complete cleaning & removal of foreign-material from scale inhibitor /corrosion inhibitor/biocide tanks, their strainer, backwashing of tank & Cleaning & flushing of pipe lines
50.2.2.50 Repairng/Servicing of agitator of scale inhibitor tank/corrosion tank/bio dispersant tank of dosing system
50.2.2.51 Repairing/Servicing of acid unloading pumps along with suction and discharge valve
50.2.2.52 Attending leakage in pipe lines
50.2.2.53 Repairing/servicing of PTFE NRV/ball/Diaphragm valve (0mm-50 mm)
50.2.2.54 Painting of Acid Storage Tank, Acid/Scale/ Corrosion inhibitor/ biocide measuring Tanks (Note : Paint and primer is in the contractor scope)
50.2.2.55 Overhauling of SSF Filter Back wash Pump
50.2.2.56 Servicing of SSF Filter Back wash Pump
50.2.2.57 Overhauling of SSF Air blower
50.2.2.58 Servicing of SSF Air blower
50.2.2.59 Replacement of Bearing of Filter Back wash Pump
50.2.2.60 Replacement of Bearing of Filter Back wash blowers
50.2.2.61 Replacement of coupling, Alignment & balancing of Back wash pumps
50.2.2.62 Cleaning /removal of mud/sludge from SSF Backwash Water Pit and its disposal
50.2.2.63 Miscellaneous repairing / welding work of MS Pipe lines
50.2.2.64 Replacement/ Top up of media (sand ) per m3
50.2.2.65 Inspection of Pressure Vessels
50.2.2.66 Cleaning of Pressure Vessels
50.2.2.67 Gland replacement of Water Pumps
50.2.2.68 Attending Defects in Flanges
50.2.2.69 Attending gland leakage of various pumps and valves.
50.3 Bienneal round the clock & routine collection and preparation of sample and analysis of water/steam/coal/oil/ash/waste water and Monitoring, Recording & maintaining Water Chemistry of 2X660 MW, JTPS Malawan Etah.
50.3.1 Round the clock collection and preparation of sample and analysis of water/steam/coal/oil/ash/waste water and Monitoring, Recording & maintaining Water Chemistry of 2X660 MW,JTPS, Malawn Etah.
50.3.2 Routine collection and preparation of sample and analysis of water/steam/coal/oil/ash/waste water/flue gas/mill fineness/various components pertaining to pollution etc. and Monitoring, Recording & maintaining Water Chemistry ,calibration of instruments and Standardization of solutions for the special testing.
60.1 Routine and Preventive Maintenance of Mechanical systems of ESP, for 2x660 MW, JTPS, Malawan, Etah.
60.1.1 Cleaning and sweeping of all railing of ESP top cover and cleaning of geared motor emitting electrode rapping mechanism. (96 Nos.)
60.1.2 Cleaning and sweeping of platform between passes and cleaning of geared motor of collecting electrode rapping mechanism.
60.1.3 Checking of oil level and attending oil leakage in all geared motor of CERM, DERM, GDRM (per week).
60.1.4 Cleaning and sweeping of all stairs railing and platform from ‘0’ mtr. to top of ESP.(per week)
60.1.5 Cleaning and sweeping of outside casing walls between passes.(once in two month)
60.1.6 Inspection and tightening of nut and bolts of CERM, DERM & GDRM if found in loose condition.(once in a week)
60.1.7 Cleaning of ash dust from ESP top roof of one pass, monthly per pass.
60.2 Breakdown Maintenance of Mechanical systems of ESP
60.2.1 Cleaning of complete structure, electrodes, shock bar, rapping mechanism, insulators & hoppers from inside of ESP of one field by wire brush, hard broom and old cloth/water washing.(one Field)
60.2.2 Replacement/Repairing of rapping hammer.
60.2.3 Replacement of plane bearing of rapping mechanism.
60.2.4 Repairing of rapping shaft.
60.2.5 Straightening of rapping shaft
60.2.6 Replacement of rapping shaft.
60.2.7 Repairing of bent collecting electrodes in ESP chamber in fix position.
60.2.8 Fixing of collecting electrodes with clamp/strip by bolting & welding.
60.2.9 Repair/Replacement of shock bar.
60.2.10 Replacement of shock pads
60.2.11 Repairing of shock bar guide (front/ rear) and shock bar guide attachment by welding or grinding wherever required.
60.2.12 Straightening of bent guide bar of collecting structure.
60.2.13 Removal of damaged emitting electrode and fixing the new emitting electrode.
60.2.14 Changing of damaged support Insulator.
60.2.15 Changing of damaged Shaft Insulator.
60.2.16 Alignment of disturbed emitting structure.
60.2.17 Repairing of support insulator screen pipe inside the ESP.
60.2.18 Replacement of asbestos rope of ESP shaft insulators cover.
60.2.19 Replacement of damaged motor gear box of rapping system.
60.2.20 Repairing of damaged rapping gear box.
60.2.21 Repairing of coupling of reduction gear box of collecting/emitting/GD rapping system.
60.2.22 Replacement of asbestos rope of ESP hopper manhole/Casing manhole/ Casing top manhole.
60.2.23 Repairing of manhole by replacing the damaged plate portion with new one.
60.2.24 Repairing of eroded portion by welding in ash hopper, ESP roof and other places inside and outside of the ESP chamber:
60.2.25 Repair/ fixing/welding of ash deflector plate
60.2.26 Repairing/ Re-fabrication of support of duct plate at ESP inlet.
60.2.27 Repairing of bracings between ESP inlet gate and GD Screen and rear side of ESP by providing patch at eroded area or changing new piece by bracing pipe as per size.
60.2.28 Repairing /re-fixing of deflector plate on gas distribution screen.
60.2.29 Inspection and checking of ESP field and removal of minor defect.
60.2.30 Repairing of GD Screen.
60.2.31 Servicing of monorail.
70 Routine, Preventive and Breakdown maintenance works, Cleaning works, Decantation of LDO from BTPN rakes & other associated maintenance works of Fuel oil system And Round the clock Operation and Routine, Preventive, Breakdown maintenance & General cleaning work in 2x660MW, JTPS-Extn-Malawan Etah.
70.1 Routine, Preventive and Breakdown maintenance works, Cleaning works, Decantation of LDO from BTPN rakes & other associated maintenance works of Fuel oil system
70.1.1 Routine & Preventive maintenance works of fuel oil System.
70.1.2 Cleaning of LDO storage tank, Capacity-3000 KL. Completion time-08 days (8 hrs shift).
70.1.3 Cleaning of DOT, Capacity-100 KL. Completion time-02 day (8 hrs shift).
70.1.4 Daily cleaning of fuel oil pump house area, Work includes cleaning of all trenches, channel & open drains inside and outside of fuel oil pump house area.
70.1.5 Complete cleaning of LDO Unloading Header to Aux Boiler. Cleaning also includes Cutting of Vegetation around unloading header and shifting of cutted vegetation in scrap yard or as decided by JE/AE/EE concerns. Completion period-01month=02 jobs.
70.2 Break Down Maintenance works of fuel oil system
70.2.1 Servicing of LDO unloading screw pumps (Installed Qty-06 nos)
70.2.2 Servicing of LDO pressurizing screw pumps (Installed Qty-3 nos.)
70.2.3 Servicing of Transfer pump pumps (Installed Qty-2 nos)
70.2.4 Servicing of Vertical Drain oil pump (Installed Qty-2 nos)
70.2.5 Servicing of Gate Valve/Globe Valve/NRVs Size 20mm to 50mm.
70.2.6 Servicing of Gate Valve/Globe Valve/NRVs Size above 50 to 100mm.
70.2.7 Servicing of Gate Valve/Globe Valve/NRVs Size above 100-150mm.
70.2.8 Servicing of Gate Valve/Globe Valve/NRVs Size above 150-200mm.
70.2.9 Servicing of Gate Valve/Globe Valve/NRVs Size above 200-450mm.
70.2.10 Replacement of Gate Valve/Globe Valve/NRVs Size 20mm to 50mm.
70.2.11 Replacement of Gate Valve/Globe Valve/NRVs Size above 50mm to 100mm.
70.2.12 Replacement of Gate Valve/Globe Valve/NRVs Size above 100 to 150mm.
70.2.13 Replacement of Gate Valve/Globe Valve/NRVs Size above 150-200mm.
70.2.14 Replacement of Gate Valve/Globe Valve/NRVs to above 200 to450mm.
70.2.15 Replacement / Repairing of Three-way Valve.
70.2.16 Attending the leakage of steam, LSHS/LDO, Pipe Line Dia.-50x4mm..
70.2.17 Attending the steam leakages of Steam Pipe lines of Dia. 80-100x5mm.
70.2.18 Attending the steam leakages of Steam Pipe lines of Dai. 100x6mm and above.
70.2.19 Alignment of LSHS/LDO pressurizing,transfer pumps & unloading pumps.
70.2.20 Replacement of New/serviced LSHS/LDO pumps.
70.2.21 Repairing/Replacement of pressure release safety valve of LSHS/LDO system (One PRS valve makes one number Job.
70.2.22 Attending leakage of steam from tracing line.
70.2.23 Cleaning of Strainer of LDO/LSHS
70.2.24 Decantation of LDO/LSHS from BTPN rakes by making connection for unloading and making disconnection after unloading.
70.3 Insulation work of Steam/water/oil piping
70.3.1 Insulation of Steam/water/oil piping having dia. up to 100mm
70.3.2 Insulation of Steam/water/oil piping of dia. above 100mm to 250mm
70.3.3 Insulation of Steam/water/oil piping of dia. above 250mm
70.3.4 Insulation work of valve having 20mm to 40mm.
70.3.5 Insulation work of valve having 50mm to 100mm.
70.3.6 Insulation work of valve having 150mm to 200mm.
70.3.7 Insulation work of valve having 250mm to 450mm.
70.3.8 Routine and preventive maintenance of EOT Crane of fuel oil pump house
70.3.9 Operation of EOT CRANE of fuel oil pump house
80.1 Breakdown Mechanical maintenance of fire fighting system including IGS of 2x660mw, Malawan, Etah
80.1.01 Maintenance of Hydrant Pump /Spray pump (motor/diesel engine driven)
80.1.02 Maintenance of Jockey Pump
80.1.03 Maintenance / overhauling of Hydrant /Spray diesel engine
80.1.04 Maintenance / overhauling of Booster diesel engine
80.1.05 Maintenance / repairing of 350//250 mm C.I. Isolating gate valves (fabricating , fixing & lapping of new brass seat rings in valve body & gate seat after removal of damaged ones, repair /replacement of wedge nut ,spindle, key , keyway ,gears, etc)
80.1.06 Maintenance / repairing of 100/80/65 mm C.I. Isolating gate valves (fabricating , fixing & lapping of new brass seat rings in valve body & gate seat after removal of damaged ones, repair /replacement of wedge nut ,spindle, key , keyway ,gears, etc)
80.1.07 Maintenance of 350/250 mm C.I. swing type Non Return Valve
80.1.08 Maintenance of 200/150 mm C.I. swing type Non Return Valve
80.1.09 Maintenance of 100/80/65 mm C.I. swing type Non Return Valve
80.1.10 Overhauling(cleaning, repairing , replacement of damaged parts etc) of 350/300/250/200mm Y-type Strainer
80.1.11 Overhauling(cleaning, repairing , replacement of damaged parts etc) of 150/100/80/65/50mm Y-type Strainer
80.1.12 Fabrication & fitting of flap seat of 350//250/200 mm swing type NRV
80.1.13 Fabrication & fitting of flap seat of 200/150 mm swing type NRV
80.1.14 Fabrication & fitting of flap seat of 100/80/65 mm swing type NRV
80.1.15 Fabrication & fitting of complete hinge-lever of 250/200/150 mm swing type NRV
80.1.16 Fabrication & fitting of complete hinge-lever of 100/80/65 mm swing type NRV
80.1.17 Filling of gland packing in stuffing box of valves (350-200 mm)
80.1.18 Filling of gland packing in stuffing box of valves (150-50 mm)
80.1.19 Maintenance of Air release valve 25mm/40mm
80.1.20 Maintenance / overhauling of 150 /100mm Deluge valve
80.1.21 Maintenance / overhauling of 80 mm Deluge valve
80.1.22 Maintenance/servicing of 150/100 mm butterfly valve
80.1.23 Maintenance/servicing of 80 /65 mm butterfly valve
80.1.24 Maintenance of 100 /80 mm C.I. Isolating Valve installed underground in the chamber
80.1.25 Maintenance of 200 /150 mm C.I. Isolating Valve installed underground in the chamber
80.1.26 Maintenance of Hydrant valve75 mm inlet and 63 mm(monitor) out let
80.1.27 Maintenance of Foam Pump (Electric motor Driven)
80.1.28 Servicing of Diesel Engine of Hydrant/Spray/Booster pumps
80.1.29 Maintenance of 50/40 mm Inline Balance Pressure Foam Proportioner)
80.1.30 Maintenance of Foam Maker
80.1.31 Cleaning & servicing of basket type strainer 150 mm in Fixed Foam pourer pump house/system
80.1.32 Maintenance of C.S./S.S. valves/check valve (25 mm - 40 mm) in Fixed Foam pourer pump house/system
80.1.33 Maintenance of Y type Strainer 32 NB (S.S.) in Fixed Foam pourer pump house/system
80.1.34 Maintenance of booster pump(Electric motor/Diesel Engine)
80.1.35 Maintenance/Servicing of complete Auto (Water) spray system in Generator Transformers/ Station Transformers/ Unit Auxiliary Transformers/ICT/UT/CHP Transformer
80.1.36 Maintenance/Servicing of complete Auto (Water) spray system in Boiler Burner Fronts/Rear
80.1.37 Maintenance/Servicing of complete Auto (Water) spray system in Main Oil Tanks & Oil Purifier
80.1.38 Maintenance/Servicing of complete Auto (Water) spray system in Clean & Dirty Oil Tanks
80.1.39Maintenance/Servicing of complete Auto (Water) spray system in FGD storage shed.
80.1.40 Maintenance/Servicing of complete Auto (Water) spray system as per scope of work in T- Boiler Feed Pumps and Oil Tank
80.1.41 Maintenance/Servicing of complete Auto (Water) spray system in Cable Spreader Room in Main Plant at EI.0.0m/9m/14m/25m/ ESP Room .
80.1.42 Maintenance/Servicing of complete Auto (Water) spray system in Seal oil pumps area.
80.1.43 Maintenance/Servicing of complete Auto (Water) spray system as per scope of work in Fuel Oil Pump House
80.1.44 Maintenance/Servicing of complete Auto (Water) spray system in E.D.G .Set Building.
80.1.45 Maintenance/Servicing of complete Auto (Water) spray system in Coal Conveyors(section confined with one deluge valve will be treated as one job
80.1.46 Maintenance/Servicing of complete Auto (Water) spray system in Bowl mill area. ).(system confined with one mill will be treated as one job)
80.1.47 Maintenance/Servicing of complete Auto (Water) spray system in APH area(system confined with one APH will be treated as one job)
80.1.48 Maintenance/Servicing of complete Auto (Water/Foam) spray system in HFO Storage Tanks /LDO Storage Tanks
80.1.49 Leakage arresting work in underground pipe line at approx. 1.5 meter depth.
80.1.50 Leakage arresting work in water lines laid at ground level.
80.1.51 Leakage arresting work in water lines running overhead.
80.1.52 For arresting leakage in pipe lines laid above ground or inside of trenches by providing clamp.
80.1.53 Maintenance/overhauling of Inert Gas flooding system.
80.1.54 Servicing of Inert Gas flooding system.
80.1.55 Maintenance / repairing of 200/150 mm C.I. Isolating gate valves (fabricating , fixing & lapping of new brass seat rings in valve body & gate seat after removal of damaged ones, repair /replacement of wedge nut ,spindle, key , keyway ,gears, etc)
80.2 Round the clock operation and routine, preventive maintenance of fire fighting system of 2X660MW, JTPS, MALAWAN, ETAH
90.2 Round the clock Operation and Routine, Preventive, Breakdown maintenance & General cleaning work of HVAC (Heat Ventilation and Air Conditioning) system and Routine, Preventive & Breakdown maintenance of 1.5Ton and 2.0Ton Split type Air conditioners installed in 2x660MW,JTPS, Malawan Etah” for the period of two years
90.2.1 “Round the clock Operation and Routine, Preventive, Breakdown maintenance & general cleaning work of HVAC (Heat Ventilation and Air Conditioning) system of 2x660MW, JTPS Malawan,Etah for two years.
90.2.2 Routine, Preventive & Breakdown maintenance of 1.5Ton and 2.0Ton Split type Air conditioners installed in 2x660MW, JTPS-Malawan Etah” for the period of two years
90.2.2.1 Routine servicing of 1.5Ton (Qty-218 Nos) and 2.0Ton (Qty-23 Nos) Split type Air conditioners installed in 2x660MW, JTPS Malawan,Etah for two years.. (Approx.Total 241 Nos. Split AC)
90.2.2.2 Breakdown maintenance of damaged/defective spare parts of 1.5/ 2.0on Split type Air conditioners installed at various buldings of 2x660MW, JTPS,Malawan, Etah.
90.2.2.2.1 Replacement of 1.5 Ton burnt compressor with gas charging (R-32).
90.2.2.2.2 Replacement of 2.0 Ton burnt compressor with gas charging (R-32).
90.2.2.2.3 Gas charging in 1.5 Ton Compressor (R-32).
90.2.2.2.4 Gas charging in 2.0 Ton Compressor (R-32).
90.2.2.2.5 Replacement of Strainer filter of 2.0 Ton Split AC
90.2.2.2.6 Replacement of Strainer filter of 1.5 Ton Split AC
90.2.2.2.7 Replacement of Starting capacitor/ running capacitor of 2.0 Ton split type Air conditioner
90.2.2.2.8 Replacement of Starting capacitor/ running capacitor of 1.5 Ton split AC
90.2.2.2.9 Replacement of Thermostat of 2.0 Ton split type Air conditioner
90.2.2.2.10 Replacement of Thermostat of 1.5 Ton split type Air conditioner
90.2.2.2.11 Replacement of Blade of fan blower of 2.0 Ton split type Air conditioner
90.2.2.2.12 Replacement of Blade of fan blower of 1.5 Ton split type Air conditioner
90.2.2.2.13 Replacement of Fan motor capacitor of 2.0 Ton split type Air conditioner
90.2.2.2.14 Replacement of Fan motor capacitor of 1.5 Ton split type Air conditioner
90.2.2.2.15 Rewinding of outer blower motor of 1.5/2.0Ton split type Air conditioner
90.2.2.2.16 Rewinding of inner blower motor of 1.5/2.0 Ton split type Air conditioner
90.2.2.2.17 Replacement of Starting relay of 2.0 Ton split type Air conditioner
90.2.2.2.18 Replacement of Starting relay of 1.5 Ton split type Air conditioner
90.2.2.2.19 Repairing of PCB 1.5/2.0 Ton split type Air conditioner
90.2.2.2.20 Replacement of PCB 1.5/2.0 Ton split type Air conditioner
90.2.2.2.21 Repairing of Remote kit of 1.5/2.0 Ton split type Air conditioner
90.2.2.2.22 Replacement of Remote kit of 1.5/2.0 Ton split type Air conditioner
90.2.2.2.23 Top up of refrigerant of unit as per requirement as per model
90.2.2.2.24 Shifting of wall mounted complete Split AC of 1.5Ton and 2.0Ton Split AC as per requirement of site, including supply of inlet/outlet copper piping with insulation, cutting, brazing & gas charging. Supply of inlet/outlet copper piping, insulation material, brazing & gas charging will be in the contractor scope.
90.2.2.2.25 Replacement of Condenser/Evaporator coil of 1.5 Ton AC
90.2.2.2.26 Replacement of Condenser/Evaporator coil of 2.0 Ton AC
90.2.2.2.27 Replacement of Fan Motor of 1.5 ton AC
90.2.2.2.28 Replacement of Fan Motor of 2.0 ton AC
100 Part H: Operation, Maintenance and upkeep of Hydrogen Generation Plant for two years.
100.1 Operation, Maintenance and upkeep of Hydrogen Generation Plant for two years.
100.2 Painting of Hydrogen Cylinders.
110 Engagement of Field Operation Assistant (Operator) in shift (Round the clock for assistance in operational activities from Unit Control room (CCR) of 2X660 MW, JTPS , Malawan, Etah.
110. 1Engagement of Field Operation Assistant (Operator) in shift(Round the clock) for assistance in operational activities from Unit Control room(CCR) of 2X660 MW, JTPS Malawan, Etah.{Each shift will be of 08 Hrs. and in 24 Hrs.(Day & Night) total 03 shifts will be carriedout and so in one year total shifts=3X365=1095 Shifts)}. No. of skilled manpower required per shift in both the units=19
M/s Simar Infrastructures Limited
MP SUDHAKARAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 2.87 MB
Tender.pdf
Tender Documents • 2.86 MB
BOQ_1387854.xls
BOQ • 0.68 MB
Download all tender documents and submit your bid