| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹47.3 LAdmitted-Finance | H1 | Admitted-Finance | |
| 2 | H2₹47.0 L−₹25,649.50 (0.54%)Admitted-Finance P O BUD BUD DIST BURDWAN PIN 713403 W B | BUD BUD | BURDWAN | WEST BENGAL | 713403 | H2 | Admitted-Finance | |
| 3 | H3₹45.9 L−₹1.4 L (2.95%)Admitted-Finance | H3 | Admitted-Finance | |
| 4 | H4₹44.8 L−₹2.4 L (5.16%)Admitted-Finance VILL MIRIKPARA GALSI WEST PO GALSI PS GALSI DIST PURBA BARDHAMAN PIN 713406 WB | GALSI | PURBA BARDHAMAN | WEST BENGAL | 713406 | H4 | Admitted-Finance | |
| 5 | H5₹43.1 L−₹4.2 L (8.78%)Admitted-Finance MANKAR MANKAR MANKAR RAIPUR BARDHAMAN WEST BENGAL 713144 | PURBA BARDHAMAN | WEST BENGAL | 713144 | H5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Baba kshatrapal Labour Contract And Construction Co-Operative Society Ltd H5 | K L BAKSHI AND SONS H2 | M/S DEBNATH MONDAL H1 | M/S Dey Construction H8 | M/S Ali Trading Co H7 | UNIQUE ENTERPRISE H6 | M/s sadhan kumar mukherjee H3 | GALSI DEVELOPERS PVT LTD H4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as sepcified and directed. | 50 | Cum | 730 ₹36,500 | 850 ₹42,500 | 777 ₹38,850 | 549 ₹27,450 Lowest | 700 ₹35,000 | 580 ₹29,000 | 622 ₹31,100 | 800 ₹40,000 |
| 2.00 | M&L for fly ash brick old size straight or curved on plan exc 6 mtr mean radius built in CM 1:6 complete all as specified and directed. | 50 | Cum | 8,625 ₹4,31,250 | 8,600 ₹4,30,000 | 8,525 ₹4,26,250 | 8,499 ₹4,24,950 Lowest | 8,600 ₹4,30,000 | 8,550 ₹4,27,500 | 8,600 ₹4,30,000 | 8,524 ₹4,26,200 |
| 3.00 | Demolition of cement concrete reinforced as in chajja & similar suspended work (other than ground floor) complete all as specified and directed. | 4 | Cum | 730 ₹2,920 | 900 ₹3,600 | 825 ₹3,300 | 549 ₹2,196 Lowest | 700 ₹2,800 | 590 ₹2,360 | 630 ₹2,520 | 825 ₹3,300 |
| 4.00 | M&L for M-25 Design mix using 20mm stone aggregate as in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concret complete all as specified and directed. | 6 | Cum | 8,650 ₹51,900 | 8,800 ₹52,800 | 8,725 ₹52,350 | 8,499 ₹50,994 Lowest | 8,600 ₹51,600 | 8,610 ₹51,660 | 8,800 ₹52,800 | 8,700 ₹52,200 |
| 5.00 | M&L for M-25 Design mix using 20mm stone aggregate as in chajjas complete all as specified and directed. | 0.5 | Cum | 8,660 ₹4,330 | 8,800 ₹4,400 | 8,750 ₹4,375 | 8,599 ₹4,299.5 Lowest | 8,600 ₹4,300 | 8,680 ₹4,340 | 8,900 ₹4,450 | 8,725 ₹4,362.5 |
| 6.00 | M&L for M-25 Design mix using 20mm stone aggregate Beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified and directed. | 3.5 | Cum | 8,650 ₹30,275 | 8,825 ₹30,887.5 | 8,900 ₹31,150 | 8,699 ₹30,446.5 | 8,600 ₹30,100 Lowest | 8,800 ₹30,800 | 9,000 ₹31,500 | 8,800 ₹30,800 |
| 7.00 | M&L for Steel Centering and shuttering including strutting, propping etc. and removal of form to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter complete all as sepcified and directed. | 40 | Sqm | 480 ₹19,200 | 525 ₹21,000 | 600 ₹24,000 | 459 ₹18,360 | 450 ₹18,000 Lowest | 510 ₹20,400 | 550 ₹22,000 | 500 ₹20,000 |
| 8.00 | M&L for Steel Centering and shuttering including strutting, propping etc. and removal of form to chullah hoods, chajjas, troughs and similar items including edge for fair finished surface of concreted complete all as specified and directed. | 8 | Sqm | 480 ₹3,840 | 622 ₹4,976 | 630 ₹5,040 | 469 ₹3,752 | 450 ₹3,600 Lowest | 520 ₹4,160 | 550 ₹4,400 | 525 ₹4,200 |
| 9.00 | M&L for Steel Centering and shuttering including strutting, propping etc. and removal of form to sides and soffits of floor or roof beams, beam haunch?ings, girders, bressummers, lintels, cantilevers, shelves including sup- ports, overhangs, etc. also splays between floors and beams, etc for fair finished surface of concrete complete all as specified and directed. | 30 | Sqm | 485 ₹14,550 | 620 ₹18,600 | 650 ₹19,500 | 479 ₹14,370 | 450 ₹13,500 Lowest | 520 ₹15,600 | 550 ₹16,500 | 550 ₹16,500 |
| 10.00 | Taking down cement plaster of any description from brick wall surfaces etc including racking out joints and hacking for key, scrubbing down with water etc complete all as sepcified and directed. | 380 | Sqm | 42 ₹15,960 | 42 ₹15,960 | 45 ₹17,100 | 29 ₹11,020 | 40 ₹15,200 | 30 ₹11,400 | 28 ₹10,640 Lowest | 39 ₹14,820 |
Tender Value
₹43.2 L
EMD Value
₹86,500
Closing Date
9 Sept 2026, 6:00 pmClosed
GE PANNGARH
GARRISON ENGINEER PANAGARH, MILITARY ENGINEER SERVICES, PO-PANAGARH, DISTT- BURDWAN, STATE-WEST BENGAL PIN-713420
All as per BOQ
2026_MES_785360_1
8500-673/E8
Open Tender
Civil Works
Works
180 days
PANNGARH
As per tender documents
6 documents required · 6 mandatory
₹500
GE Panagarh
₹86,500
17 Sept 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
9 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as sepcified and directed. | 50 | Cum | - | - |
| 2 | M&L for fly ash brick old size straight or curved on plan exc 6 mtr mean radius built in CM 1:6 complete all as specified and directed. | 50 | Cum | - | - |
| 3 | Demolition of cement concrete reinforced as in chajja & similar suspended work (other than ground floor) complete all as specified and directed. | 4 | Cum | - | - |
| 4 | M&L for M-25 Design mix using 20mm stone aggregate as in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concret complete all as specified and directed. | 6 | Cum | - | - |
| 5 | M&L for M-25 Design mix using 20mm stone aggregate as in chajjas complete all as specified and directed. | 0.5 | Cum | - | - |
| 6 | M&L for M-25 Design mix using 20mm stone aggregate Beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified and directed. | 3.5 | Cum | - | - |
| 7 | M&L for Steel Centering and shuttering including strutting, propping etc. and removal of form to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter complete all as sepcified and directed. | 40 | Sqm | - | - |
| 8 | M&L for Steel Centering and shuttering including strutting, propping etc. and removal of form to chullah hoods, chajjas, troughs and similar items including edge for fair finished surface of concreted complete all as specified and directed. | 8 | Sqm | - | - |
| 9 | M&L for Steel Centering and shuttering including strutting, propping etc. and removal of form to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including sup- ports, overhangs, etc. also splays between floors and beams, etc for fair finished surface of concrete complete all as specified and directed. | 30 | Sqm | - | - |
| 10 | Taking down cement plaster of any description from brick wall surfaces etc including racking out joints and hacking for key, scrubbing down with water etc complete all as sepcified and directed. | 380 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
PS673.pdf
Tender Documents • 1.23 MB
BOQ_880025.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .