Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance 63A SADAR BAZAAR DAGSHAI CANTT DISTT SOLAN 173210 H P | DAGSHAI | SOLAN | HIMACHAL PRADESH | 173210 | ₹5.7 L | L1 | Accepted-Finance OK |
| 2 | L2₹6.3 L+₹62,789.63 (11.1%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | ₹6.3 L+₹62,789.63 (11.1%) | L2 | Rejected-Finance Due to high rates |
| 3 | L3₹6.9 L+₹1.2 L (21.5%)Rejected-Finance | ₹6.9 L+₹1.2 L (21.5%) | L3 | Rejected-Finance Due to high rates |
| 4 | Rejected-Technical HARYANA HR | GURUGRAM | HARYANA | 122001 | - | - | Rejected-Technical Non responsive |
Tender Value
₹7.2 L
EMD Value
₹14,500
Closing Date
7 Sept 2026, 6:00 pmClosed
EE HPSAMB
EE HPSAMB
Repair and maintenance of S.M. Yard Chakki ka Mor, Distt. Solan, H.P. SH- Painting distempering, repair work, CGI roofing and laying of water line.
2026_HPAMB_142267_3
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Percentage
30 days
Chakki Ka Mor Solan
Please refer Tender documents.
4 documents required · 4 mandatory
₹415
₹14,500
21 Sept 2026
29 Aug 2026
8 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead s per Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government . | 16.07 | sqm | 31.2 | ₹501.38 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government . | 0.83 | sqm | 619.05 | ₹513.81 |
| 3 | Providing and laying Second class Half brick masonry in super structure above plinth level upto all floor level. In Cement mortar 1 : 4 (1 cement : 4 coarse sand) as per Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government . | 1.44 | sqm | 935 | ₹1,346.4 |
| 4 | Providing and laying Second class Brick work in super structure above plinth level upto all floor level: Cement mortar 1:6 (1 cement : 6 Coarse sand) as per Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government . | 3.19 | Per Cubic Metre | 6,500 | ₹20,735 |
| 5 | 15 (Fifteen) millimeters thick cement plaster in single coat on the rough side of brick/concrete/ stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80 (Eighty) millimeters in girth and finished even and smooth in cement mortar 1:4(One cement: Four sand)as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 124.48 | sqm | 211.7 | ₹26,352.42 |
| 6 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 0.83 | CUM | 4,200 | ₹3,486 |
| 7 | Providing and laying mechanically mixed and vibrated cement concrete 1:2:4 (one cement isto two sand isto four graded crushed stone aggregate 20mm (twenty millimeter) nominal size) and curing complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 1.2 | CUM | 5,661.63 | ₹6,793.96 |
| 8 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joint with white cement & matching pigments etc. complete as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 16.07 | SQM | 1,296.95 | ₹20,841.99 |
| 9 | Applying birla wall putty putty two coats over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matt finish to the surface complete as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government | 125 | SQM | 60 | ₹7,500 |
| 10 | Painting two or more coats coats including primer coat after filling the surface with Synthetic enamel paint in all shades on new plastered/ concrete surfaces as per drawing and technical specification. including carriage of materials with in all leads & lifts as per direction / satisfaction of the Engineer-in-charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 2,000 | SQM | 88.8 | ₹1,77,600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_211344.xls
BOQ • 0.37 MB
SBD_3_Chakki_ka_Mor.pdf
Tender Documents • 6.79 MB
Dates_corri_092026.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .