| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | ₹12.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹13.3 LRejected-Finance | ₹13.3 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SUSAI MANICKAM CONTRACTOR L2 | JESUS AUGUSTINE AROCKIAM L1 |
|---|---|---|---|---|---|
| 1.00Part 1 : Construction of Drainage with Cover slab From Muslim P.U Elementary school to Poonjolai Street at Athoor H/O Athoor Estimate Amount : Rs. 13.00 lakhs | |||||
| 2.00Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | |||||
| 3.00 | Drain | 172.8 | cum | 204 ₹35,251.20 | 197.83 ₹34,185.02 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum. | 21.6 | cum | 5,765 ₹1.2 L | 5,544.17 ₹1.2 L |
| 5.00 | Towards the centring charges for sides etc., complete conveyance of all materials & labour charges etc., complete. | 504 | SQM | 568 ₹2.9 L | 547.5 ₹2.8 L |
| 6.00 | CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 75.6 | cum | 6,547 ₹4.9 L | 6,296.8 ₹4.8 L |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.47 | MT | 95,562 ₹44,914.14 | 91,887.9 ₹43,187.31 |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 81 | SQM | 295 ₹23,895 | 284.55 ₹23,048.55 |
| 9.00 | CC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 12.38 | cum | 9,643 ₹1.2 L | 9,273.8 ₹1.1 L |
| 10.00 | Provision for Name Board | 1 | NO | 2,080 ₹2,080 | 2,000 ₹2,000 |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
10 Mar 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER ATHOOR PU
BLOCK DEVELOPMENT OFFICER ATHOOR PU
Construction of Drainage with Cover slab From Muslim P.U Elementary school to Poonjolai Street at Athoor H/O Athoor 117
2026_RDTN_672366_1
TN 05 117 PAR 2025-2026 ATHOOR BLOCK
Open Tender
Civil Works - Others
180 days
BLOCK DEVELOPMENT OFFICER ATHOOR PU
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
Yes
8 Jun 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
Part 1 : Construction of Drainage with Cover slab From Muslim P.U Elementary school to Poonjolai Street at Athoor H/O Athoor Estimate Amount : Rs. 13.00 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Drain
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum.
Towards the centring charges for sides etc., complete conveyance of all materials & labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
CC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_808057.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid