Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance NOT AVAILABLE | -28.90% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹8,646.90 (2.88%)Admitted-Finance | -26.85% | ₹3.1 L+₹8,646.90 (2.88%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 L+₹43,867.20 (14.6%)Admitted-Finance 2278 SECTOR 15 PANCHKULA | -18.50% | ₹3.4 L+₹43,867.20 (14.6%) | L3 | Admitted-Finance |
| 4 | L4₹3.5 L+₹46,566.72 (15.5%)Admitted-Finance 222 HSIDC BARWALA PANCHKULA | -17.86% | ₹3.5 L+₹46,566.72 (15.5%) | L4 | Admitted-Finance |
Tender Value
₹4.2 L
EMD Value
₹8,436
Closing Date
28 May 2026, 3:00 pmClosed
Excecutive Engineer Hort.Divn.No.2 M.C.Chandigarh
Excecutive Engineer Hort.Divn.No.2 M.C.Chandigarh
REPAIR AND REWINDING OF THE SUBMERSIBLE PUMP SET AND REPLACEMENT OF OLD BURNT ELECTRICAL PARTS AND OTHER ALLIED WORKS AT VARIOUS GREEN BELTS PARKS AT TUBEWELL UNDER THE JURISDICTION OF SDE MC PH SUB DIVISION NO.19,CHANDIGARH UNDER REVENUE HEAD.
2026_MCC_92605_1
MCC/H-2/70/2026
Open Tender
Miscellaneous Works
Percentage
60 days
Excecutive Engineer Hort.Divn.No.2 M.C.Chandigarh
REPAIR AND REWINDING OF THE SUBMERSIBLE PUMP SET AND REPLACEMENT OF OLD BURNT ELECTRICAL PARTS AND OTHER ALLIED WORKS AT VARIOUS GREEN BELTS PARKS AT TUBEWELL UNDER THE JURISDICTION OF SDE MC PH SUB DIVISION NO.19,CHANDIGARH UNDER REVENUE HEAD.
2 documents required · 2 mandatory
₹0
₹8,436
11 Jun 2026
21 May 2026
28 May 2026
21 May 2026
28 May 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair and rewinding of submersible pump set 25 HP 14 stage including replacement of all defective parts complete in all respect. | - | job | - | - |
| 2 | Repair and rewinding of submersible pump set 35 HP 14 stage including replacement of all defective parts complete in all respect. | - | job | - | - |
| 3 | Lifting /lowering of pump set complete in all respect as per entire satisfaction of EIC. | - | each | - | - |
| 4 | Replacement of broken/burnt contractor block 40 amper including making connection kit-kat 200 amp including cost of thimble making connection complete in all respect | - | each | - | - |
| 5 | Replacement of broken/burnt overload relay 30-50 ampere complete in all respect | - | each | - | - |
| 6 | Replacement of star delta timer complete in all respect. | - | each | - | - |
| 7 | Replacement of MCCB 100 ampere including making connection complete in all respect. | - | each | - | - |
| 8 | Replacement of Kitkat 200 ampere complete in all respect. | - | each | - | - |
| 9 | Extension of column pipe 3” c-class including cost of MS flange, cutting of pipe, threading, welding complete in all respect. | - | mtr | - | - |
| 10 | Extension of submersible cable 10mm2 complete in all respect. | - | mtr | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_113324.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .