Loading…
Loading…
Tender Value
₹40.9 L
EMD Value
₹82,000
Closing Date
14 Oct 2026, 6:00 pm
Lt Col Ravinder Kumar, Garrison Engineer
GE 970 EWS C/o 56 APO PIN-913970
SPECIAL REPAIR TO BLDG NO P-69 AT JAK LI REGT CENTRE UNDER GE 970 EWS
2026_MES_791040_1
GE 970 EWS-75(T)/2026-27
Open Tender
Civil Works
Item Rate
180 days
JAK LI RC SRINAGAR
As per tender documents
8 documents required · 8 mandatory
₹500
GE 970 EWS
₹82,000
Yes
25 Sept 2026
25 Sept 2026
16 Oct 2026
25 Sept 2026
14 Oct 2026
9 Oct 2026
25 Sept 2026 - 14 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolation of Brickwork or stone powder Masonry, built in cement or lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete complete all as specified and directed. | 9 | Cum | - | - |
| 2 | M&L for brick work with sub class `B’ bricks, straight or curved on plan exc 6m mean radius built in CM 1:6 complete all as specified and directed. | 5 | Cum | - | - |
| 3 | M&L Walling of random rubble stone masonry, uncoursed, well bonded bedded & hearted , built in cement mortar 1:4 in retaining walls, abutments and similar work complete all as specified and as directed | 4 | Cum | - | - |
| 4 | M&L Raking out joints/ pointing to squared rubble stone masonry, coursed or uncoursed built in cement or cement lime mortar as in wall or drain, etc complete all as specified and as directed | 6.3 | X Sqm | - | - |
| 5 | M&L for flush pointing to stone random rubble stone masonry, uncoursed or brought upto courses in cement mortar 1:3 as in drain, retaining wall etc. complete all as specified and as directed. | 6.3 | X Sqm | - | - |
| 6 | M&L for brick work with sub class `B’ bricks, straight or curved on plan to any radius in half brick thick walls, built in CM 1:4 complete all as specified and as directed | 5 | Sqm | - | - |
| 7 | Demolition of cement concrete in ground floors and pavings n.exc 15cm thickness (below or above ground level) complete all as specified and as directed. | 15.1 | Cum | - | - |
| 8 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for (reinforcement cut as required to facilitate demolition) complete all as specified and as directed | 2.7 | Cum | - | - |
| 9 | Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200mm thick (Horizontal or sloping) complete all as specified and as directed | 12 | Sqm | - | - |
| 10 | M&L for RCC Type A-I (1:1½:3 (using 12.5mm graded stone aggregate) for slabs supported on walls,beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the like complete all as specified and as directed | 1 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tender75T_merged.pdf
Tender Documents • 2.67 MB
BOQ_886824.xls
BOQ • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .