DG (WATER SUPPLY)
THE KOLKATA MUNICIPAL CORPORATION OFFICE OF THE DIRECTOR GENERAL (WATER SUPPLY) 5, S. N. BANERJEE ROAD, KOLKATA-700013
Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for three years
2026_KMC_1039113_1
KMC/WS/GRWW/T-04/2026-27
Open Tender
Miscellaneous Works
Item Rate
365 days
SLUDGE POND AREA(GRWW)
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹50,000
22 Aug 2026
22 Aug 2026
16 Sept 2026
22 Aug 2026
14 Sept 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for providing adequate number of working personnel per shift round the clock (like daily operation of L.T. pump-motor sets during all the pre-scheduled time spans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months. | - | month | 100 | - |
| 1.1 | Labour component:(85.77% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the first increment will be in effect. | - | - | 100 | - |
| 1.2 | Non-labour component: (14.23% of Total cost) This monthly rate/cost will remain unaltered from the date of commencement of the O&M-work till end of the first twelve months. This also indicates the base-cost upon which monthly cost of second year of O&M-work will be determined. | - | - | 10 | - |
| 2 | Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for providing adequate number of working personnel per shift round the clock (like daily operation of L.T. pump-motor sets during all the pre-scheduled time spans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months: For the period of Second 12 months. | - | month | 10 | - |
| 2.1 | Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient increment will be in effect. | - | - | 10 | - |
| 2.2 | Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | - | - | 10 | - |
| 3 | Operation and minor maintenance of Slurry Water Pumping Station of Garden Reach Water Works for providing adequate number of working personnel per shift round the clock (like daily operation of L.T. pump-motor sets during all the pre-scheduled time spans, valves etc., dewatering pump, switching ON/OFF entire illumination system etc., cleaning & sweeping all the units, rooms, spaces etc., supplying and providing all the consumables & stationeries etc., recording of all the variable data, parameters etc., and all other related works prescribed in the tender documents including scope of works etc., as per direction of the E.I.C. depending on the time to time requirements & demands of the sites: For the period of first 12 months: For the period of Third 12 months. | - | month | 10 | - |
| 3.1 | Labour component: This monthly rate/cost will remain unaltered from the date of commencement of work till a new order (as per circular as mentioned in the Tender Documents) comes in effect. This also indicates the base-cost upon which the subsequient (if any) increment will be in effect. | - | - | 10 | - |
| 3.2 | Non-labour component: This monthly cost is increased at the rate of Three percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | - | - | 10 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
Tendernotice_2.pdf
PDF • 0.68 MB
TBT04.pdf
Tender Documents • 1.22 MB
BOQ_2552179.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].