| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹318.4 CrAccepted-Finance NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹318.4 Cr | L1 | Accepted-Finance YES |
| 2 | L2₹395.0 CrAccepted-Finance | ₹395.0 Cr | L2 | Accepted-Finance YES |
| 3 | L3₹639.4 CrAccepted-Finance | ₹639.4 Cr | L3 | Accepted-Finance YES |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹196.6 Cr
EMD Value
₹2.1 Cr
Closing Date
7 Mar 2024, 3:00 pmClosed
Lt Col Nitin Mishra
CCE(RandD)CENTRAL, Development Enclave, Behind Army HQ, Rao Tula Ram Marg, Delhi Cantt 110010
PROVISION OF MAXIMUM MICROBIAL CONTAINMENT (BSL-4) COMPLEX PROJECT AT DRDE GWALIOR (DESIGN AND BUILD MODE)
2023_DRDO_787559_1
CCE(RandD)C/BSLIV/MMCC/GWL
Open Tender
Civil Works
1095 days
Gwalior
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.1 Cr
Yes
CONFRENECE HALL, CCE(RandD)CENTRAL
3 Jul 2024
27 Dec 2023
8 Mar 2024
29 Dec 2023
7 Mar 2024
29 Dec 2023
16 Jan 2024
Amount
Part-A:-
(I) CONSULTANCY SERVICES
Carryout planning, designing and risk matrix analysis of the project as a whole which shall include the following:
Building construction including services. (i) Planning and Desinging: (a) Site Master Plan along with detailed concept design, Soil investigation. (b) Laboratory planning. (c) Detailed designing of : Laboratory areas (Includng BSL-2, BSL-3, ABSL-4 and BSL-4 Bio containment area).
(ii) Reference of Codes and Standards to be adopted/Referred. Labs conducting high-consequence work with pathogens should adopt the international standard for biorisk Management ISO 35001 or any other relevant codes or standards as applicable.
(iii) Design documentation of complete system and Sub-system.
(iv) To facilitate user/stakeholder in Obtaining statutory approvals and clearance like municipal approvals, fire clearance, Pollution, Board clearance etc. as deemed necessary and applicable.
(v) Architectural, Structural design and approved drawings, including internal services and External infrastructures also of any system and sub-system deemed important.
(vi) Mechanical design. (A) HVAC Design. (1) Heating, Ventilation and Air- Conditioning design. (2) Supply Air Handling Systems. (3) Piping systems. (4) Thermal insulation systems. (5) Noise and Vibration. (6) BSL-2, BSL-3, ABSL-4 and BSL-4 Bio containment system design. (7) Access control system. (B) Building Automation systems design. (1) Design considerations. (2) Infrastructure. (3) Applications. (4) System level requirement. (5) Component level requirements. (6) Installation. (7) BSL-2, BSL-3, ABSL-4 and BSL-4 Bio containment system design. (8) MEP & Building services.
(C) Plumbing design (1) Plumbing General requirements. (2) Plumbing fixtures and equipment. (3) Water System including Underground sump/Over head tank. (4) Drainage System. (5) Natural gas/ Fuel gas systems. (6) BSL-2, BSL-3, ABSL-4 and BSL-4 Bio containment system design. (D) Fire protection and Suppression design. (1) Fire protection systems . (2) Fire Suppression System. (3) Fire alarm and mass notification systems. (4) Life safety measures. (5) BSL-2, BSL-3, ABSL-4 and BSL-4 Bio containment system design.
(vii) Electrical design. (1) Electrical system design. (2) Electrical service and Normal Power. (3) Emergency Power including DG set & UPS. (4) Site electrical distribution. (5) Wiring methods and other requirements. (6) Power Quality and Grounding. (7) Lighting. (8) BSL-2, BSL-3, ABSL-4 and BSL-4 Bio containment system design. (9) Cable management and marking. (10) FLP Fixture for BSL-III & BSL-IV
(viii) Telecommunication System design:- (1) Telecommunication System design . (2) Telecommunication/Local areas Network closet/Room. (3) Cable management. (4) Audio video system. (5) Security systems. (6) PA system.
(ix) Special process piping systems design:- (1) High purity water systems. (2) Animal Drinking water system. (3) Compressed gas and cryogenic systems. (4) Laboratory vacuum system. (5) Veterinary Medical gas system for ABSL-4. (6) Plumbing requirements for specialised equipments.
(x) Specialised equipments, systems and penetration equipments design (1) Dynamic Pass Box. (2) VHP Box. (3) VHP System - for VHP Box and fumigation/Decontam Airlocks. (4) Bio Safety cabinet Class II A2-SS 316. (5) Nude Shower system. (6) Chemical Shower system. (7) Compressed air system for process Air. (8) Compressed air system for Breathing air . (9) Breathing Air Filtration System. (10) Breathing Air Tank Distribution Pipe, Valve and Fitting. (11) Positive Pressure Suits For BSL-IV (12) Ventilated type Grament Storage Cabinet. (13)Biological Effluent Decontamination system (Steam system). (14)ETP (MLB) STP(50KLD). (15) Individually ventilated cages (Bio Containment Unit) System. (16) Down Draft Procedure Table. (17) RFID systems for PAC (Pathogen asset control). (18) Steam generation and distribution systems. (19) Liquid Nitrogen generation and distribution system
(20) Tissue digestor. (21) Gamma inactivation chamber. (22) Glove Box Isolator. (23) Air Tight Biosafty Doors (24) Interlock System (25) Air Tight Vision Panel (26) Emergency Door (27) Formylin Air Lock (Fogging System) (28) Double Door Autoclave (29) Dunk Tank (30) Formallin Pass Box (31) Boiler For Raw Steam-500 Kg/Hr X 3 Nos (32) Pure Steam Generator (33) Water for Injection Generation System (34) Purified Water Genenration System (35) Sink With Foot Operated Taps (36) Eye Wash Station For BSL-II, BSl-III. (37) HEPA Plenums(Containment Housing) (38) Utility Coonection (Steam, Compressed Air, Power Supply ,Water, Treated Water, Drains etc) For Containmenet Equipment and Systems (39) Automated Cage and Rack Washer
(xi) Services:- (1) Lift (13 Passengers & 3 Tonne Goods). (2) Baggage Scanner. (3) CCTV surveillance system. (4) Building Management system & SCADA System (5) STP. (6) Boundary wall & Security fence. (7) Room Pressure Sensor (8) IP Based EPABX System (9) Area Development & Aboriculture Plan. Note:- All Building to be designed considering Earthquake Zone and Latest IS Codes.
(II) BUILDING INFRASTRUCTURES INCLUDINGSERVICES BASE ON (DESIGN & BUILD MODE) Note:- All approved above design to be build at site as follows.
(i) Construction, Testing and Validation of multistoried RCC framed buildings Ground+3 floors of approx. Plinth Area - 11480.00 sqm, Chemical Treatment sump 300KL., including detailed design, good for construction drawings of Structure, Civil and Finishing works including Water proofing/ Partition / Electrical / Sanitary/ Plumbing/ Doors / hardware incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply of all labour, materials, equipment, facilities and handing over all assets with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing. Note:- (i) RCC wall with epoxy lining for BSL- 3 & 4 . (ii) Roof treatment for entire facilities. (iii) Stronge Structural member to bear heavy load above 500Kg/Sqm upto 1000Kg/Sqm. (iv) Underground sump for Chemically treated water Approximate 300 KL capacity.
(ii) Construction, Testing and Validation of RCC framed Ancillary buildings –Substation, AC Plant room, UG Tank and Pump Room, HT Meter room and STP Plinth Area - 250.00 sqm(Approx) including detailed design, calculations, good for construction drawings of Structure, Civil and Finishing works including Water proofing/ Electrical / Sanitary/ Plumbing/ Doors / hardware incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, of all labour, materials, equipment, facilities and handing over all assets with SOP for maintenance including standard norms of documentation. The complete works shall be as per the approved good for construction drawing. Note:- (i) Minmum 250Sqm plinth area for substation.
(iii) Supply, installation, testing,commissioning, validation and certification of complete External and Internal Electrical System including LT & HT works for entire campus and all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per the approved good for construction drawing.
(iv) Supply, installation, testing,commissioning, validation and certification of complete External and Internal HVAC System works of all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing.
(v) Supply, installation, testing,commissioning, validation and certification of complete External and Internal Plumbing System works of all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing.
(vi) Supply, installation, testing,commissioning, validation and certification of complete External and Internal Fire fighting System works of all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing.
(vii) Supply, installation, testing,commissioning, validation and certification of complete External and Internal medium-Voltage System works of all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing.n Documents and as per the approved good for construction drawing.
(viii) Supply, installation, testing,commissioning, validation and certification of complete BMS System works of all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing.
(ix) Supply, installation, testing,commissioning, validation and certification of complete Security System works of all buildings including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis, including supply, testing, commissioning of all labour, materials, equipment, facilities and handing over all assets including all E & M installations with SOP for maintenance including standard norms of documentation. The complete works shall be as per Conceptual User Requirement & Specification Documents and as per the approved good for construction drawing.
(x) Supply, installation, testing,commissioning, validation and certification of specilised equipments and penetration equpiments including detailed design, specification, calculation, good for construction/installation drawings incorporating all stiplulated design, specification parameters, functional requrements, technical specifications catering to laid down parameters of International standards on design build basis, including supply, testing commissioning of all labour, materials, equipments, facilities and handing over all assets including all E&M installations with SOP for maintenance including standard norms of documentation. The complete work shall be as per the conceptual user requirement & specification document and as per the approved good for construction drawing.
(xi) Execution of complete Area development works of entire campus including detailed design, calculations, good for construction drawings incorporating all stipulated design parameters, functional requirements, technical specifications on design build basis for Roads, Pathways, Rain water Harvesting, Surface parking works including supply of all labour, materials, equipment, facilities and handing over all assets with SOP for maintenance including standard norms of documentation. The complete works shall be as per approved scheme and good for construction drawing.
(xii) Supply, installation, testing,commissioning, validation and certification of complete containment systems with detailed design, calculations, good for construction drawings including all stipulated design parameter, functional requirement, technical specifications on design built basis for (a) Hydrogen peroxide formalin based decontamination system for laboratory, airlocks and Pass boxes. (b) inhalation challenge facility for small laboratory animals (e.g. mice, rats) in cabinet line along interface with aerosol generation system (AeroMP or Similar) (c) Aerosol facility for testing of Bio detectors (d) Quarantine/Treatment center with Biocontainment patient care in MMCC campus
(xiii) Preparation of plan and scheme for facility commissioning, validation and certification, shut down procedures and re-commissioning procedures, complete safety and audit protocols, provision of user operation and maintenance manuals and training on operations, troubleshooting and preventive maintenance to the client/users.
(xiv) During Validation upto 06 months L1 Bidder will be trained the personal deployed for running the Facility, SOP, Do & Don't, Operational & Maintenance Schedule; Spare list Manpower requirement etc. as per site requirement for Handing/Taking over to user.
Part-B
The L1 bidder shall be bound to perform O&M of the entire facility, for a period of not less than 02 years from date of issue of completion certificate which includes validation also.
1st year Operation and Maintenance
2nd year Operation and Maintenance
Part-C
Operation & Maintenance of 03 years after DLP.
3rd year Operation and Maintenance
4th year Operation and Maintenance
5th year Operation and Maintenance
Note:- (i) L1 will be decided on the basis of design, construction, erection, commissioning & validation of the facility and O&M for 02 years i.e., Part A + Part B. (ii) In case of tie equal quote amount upto Part A + B, the L1 will be decided based on the least quote of only Part C. (iii) For the Item of works not catered in tender documents but available in DSR, the rate shall be derived from DSR.
RVR PROJECTS PRIVATE LIMITED
Suroj Buildcon Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid