Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | L1 | Accepted-AOC LOWEST QUOTED AND ACCEPTED FIRM |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
3 Aug 2022, 5:00 pmClosed
STAFF OFFICER (ENM)
OFFICE OF STAFF OFFICER (ENM) JOHILLA AREA NOWROZABAD DISTT- UMARIA
Laying of 2 no pipelines by loading and unloading having length 300 mtr each of size 8 dia from Lehngi side new coal face to discharging point at KOCP of Nowrozabad Sub Area of johilla Area
2022_SECL_250344_1
SECL/JHL/SO(ENM)/ 22-23/ET/222308/ dt.16.07.2022
Open Tender
Miscellaneous Works
Item Rate
90 days
JOHILLA AREA
4 documents required · 4 mandatory
₹6,000
12 Jul 2023
18 Jul 2022
5 Aug 2022
19 Jul 2022
3 Aug 2022
19 Jul 2022
19 Jul 2022 - 26 Jul 2022
Amount
Laying of 2 no pipelines by loading and unloading having length 300 mtr each of size 8’’dia from Lehngi side new coal face to discharging point
200 mm dia MS pipe loading from central part of quarry/workshop and unloading & laying at proposed western - central site from departmental vehicle
Repairing of Pontoons 3 nos. of Central Boxes (each of 2x2x1.25) & 12 nos. Side Boxes (each of (2m X 0.8m X 1m)& (1.5m X 0.8m X 1m) at Kanchan O.C. Mine of Nowrozabad Sub- Area
Cleaning of Threenos. central boxes, Cutting of damaged plates, cutting of required size new M.S. plates, Fixing of plates in boxes & welding work.
Cleaning of twelvenos. side boxes, Cutting of damaged plates, cutting of required size new M.S. plates, Fixing of plates in boxes & welding work.
Painting of 04 Nos. of pontoons (Kanchan OC have 5 no. of Pontoons in which 1 no. pontoon is already painted)
Painting with synthetic enamel paint of approved brand and manufacturer of required color Two or more coats on new work
Loading of 2 no. pumps and 5 no. pontoons from coal face and east sumps at unit workshop and after repairing loading and unloading and installation 5 no. pumps and 5 no. pumps at coal face sump (2 no.) , east sump (1 no.) and Lehngi side sump (2 no.)and unloading and installation 5 no. pumps and 5 no. pumps at coal face sump (2 no.) , east sump (1 no.) and Lehngi side sump (2 no.)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .