| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹32.5 L+₹1.3 L (4.20%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹32.8 L+₹1.6 L (5.08%)Rejected-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹34.3 L+₹3.1 L (9.82%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹37.5 L+₹6.3 L (20.1%)Rejected-AOC | L5 | Rejected-AOC Rejected |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
25 Nov 2019, 6:00 pmClosed
CWE NW MUMBAI
DR HOMI BHABHA NAVY NAGAR ROAD COLABA MUMBAI
OUTSOURCING FOR CONSERVANCY AND HOUSE KEEPING SERVICES FOR HQ CE NAVY MUMBAI UNDER AGE I ASVINI COLABA MUMBAI
2019_MES_292969_1
8046/CWE (NW) MUMBAI
Open Tender
Civil Works
Item Wise
330 days
AGE I ASVINI
Class D
9 documents required · 9 mandatory
₹500
Yes
AGE I ASVINI
₹88,000
Yes
16 Jan 2020
26 Oct 2019
27 Nov 2019
26 Oct 2019
25 Nov 2019
9 Nov 2019
26 Oct 2019 - 2 Nov 2019
Amount
Provision of conservancy services / works as related with following manpower with the desired educational qualification, uniform / dress code, T&P, security etc covered under the PS using required materials, tools and all as directed by Engineer-in-Charge / GE shall be carried out :-
Data Entry Operator (DEO) (14 persons)
Safaiwala (02 persons)
Mali (01 person)
Supply only non dust broom standard quality of make ''GALA''
Supply only napthalin balls 1 Kg pack (Tiger brand)
Supply only Phenyl 5 Ltr Can (Tiger brand)
Supply only odonil room freshener as approved by GE/AGE
Supply only floor mop with stick of standard quality & of make " GALA"
Supply only toilet cleaner 500 ml pack of make ''Harpic''
Supply only liquid hand wash of detol brand in container
Supply only dustbin (plastic) of medium size, Make : Princes, Supreme, Nilkamal & medium size & as approved
Supply only bucket medium size Make :- Princes, Supreme, Nilkamal as approved
Supply only mug medium size
Supply only duster white/yellow
Supply only big garbage bin with wheel & cover sulo MGB 240 ltr or equivalent as approved
Supply only cotton waste
Supply only washing soap bar big size
Supply only colin in container (500 ml)
Supply only acid bottle 1 ltr
Supply only garbage bag of size suitable for dust bin as per item 10 above (30 pieces bag)
Supply only garbage bag of size suitable for garbage bin as per item 13 above (30 pieces bag)
Note :- (a) Surprise check will be carried out by department representative and if any employes is not available at his working place, he will be treated as absent. (b) After issue of work order, contractor has to submit the list of employees including reserve alongwith relevant documents as mentioned is PS to the Engineer-in-Charge. (c) The payment shall be made to employee on OR before 10th of every calender month. Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. (d) Contractor has to submit proof of payment of EPF subscription made by him alongwith RAR failing which RAR will not be progressed for payment.
(e) Contractor has to employ the number of labours per day as intimated by the Engineer-in-Charge for which he has to make alternative arrangement. (f) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (g) Contractor shall quote the rates considering their monthly leaves, releiver etc as per labour laws and nothing extra shall be paid on account of the above. In case of absence of staff/tradesman from duty, payment of that day will not be paid. In addition to that a penalty of Rs 700/- per day per person will be recovered from contractors dues. Also in case of long absence (more than one week) of staff/tradesman, the penalty shall be recovered including Sundays & Holidays if any. The contractor shall have no claim on this account. (h) Contractor has to supply three sets of Tools and Plants (as applicable) to the labours employed by him and should be placed with the safe custody of department. Rates quoted shall be deemed to be included the above provision. (j) In case any variation in manpower as indicated in Column No 4 of BOQ due to any reasons / or any manpower held in Department or any policy change contractor should have no claim on that account.
(k) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (l) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost of work mentioned in NIT, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (Cover No 2). The deposited amount shall be the difference between estimated cost mentioned in NIT less supply only material cost and amount quoted by lowest bidder less supply only material cost. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall sumbit BGB/FDR of validity shall 12 months for the purpose of encashment/ release as the case may be. (m) The rates quoted shall be inclusive of suitable reliever of menpower engaged by them
NOEL ENGINEERS
Shree Ayyappa Engineering
Bright Construction Co
AIRCON SYSTEMS
R.R.Construction.Co
K A ELECTRIC CO
ORIENTAL INTEGRATED FACILITY MANAGEMENT PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .