| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-Finance CHALIHA NAGAR DIST TINSUKIA ASSAM | TINSUKIA | ASSAM | ₹8.9 Cr | L1 | Accepted-Finance L1 as per Financial Evaluation Report |
| 2 | L2₹8.9 Cr+₹2,921.36 (<0.01%)Rejected-Finance | ₹8.9 Cr+₹2,921.36 (<0.01%) | L2 | Rejected-Finance L2 as per Financial Evaluation Report |
| Sl No | Description | Qty | Unit | M/S VIJAY AGARWAL AND SONS L1 | M/S AMUN MOTOR PARTS & ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00Confirmity SSI | |||||
| 1.01 | Conduct of Bore Hole Testing, as per IS:54:2000 sinking of 150 mm dia Bore Hole into the Sub Surface and conduct of all necessary tests and subission of report with recommendation in three copies | 1 | Job | 10,14,344.56 ₹10,14,344.56 Lowest | 10,14,440 ₹10,14,440 |
| 2.00Foundation (Excavation for Structures) | |||||
| 2.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)II) Ordinary rock (not requiring blasting)
B Mechanical Means(i) Depth upto 3 m ( without de-watering) A) Ordinary Soil | 1,266.43 | Cum | 115.62 ₹1,46,424.64 | 115 ₹1,45,639.45 Lowest |
| 2.02 | (IV) Hard rock ( blasting prohibited )Mechanical Means ( without de-watering) | 3,799.28 | Cum | 841.25 ₹31,96,144.3 | 841 ₹31,95,194.48 Lowest |
| 2.03 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 37.15 | Cum | 10,817.16 ₹4,01,857.49 Lowest | 10,818 ₹4,01,888.7 |
| 2.04 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30. With Batching Plant, Transit Mixer and Concrete Pump | 149.5 | Cum | 13,004.65 ₹19,44,195.18 Lowest | 13,005 ₹19,44,247.5 |
| 2.05 | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and Technical Specifications | 16.18 | MT | 1,03,525.2 ₹16,75,037.74 Lowest | 1,03,535 ₹16,75,196.3 |
| 3.00Sub Structure | |||||
| 3.01 | Plain/Reinforced Cement Concretein Sub structure complete as per drawing Technical Specifications. RCC Grade M30, Height 5m to 10m. With Batching Plant, Transit Mixer and Concrete Pump. | 209.57 | Cum | 13,914.34 ₹29,16,028.23 Lowest | 13,915 ₹29,16,166.55 |
Tender Value
₹8.9 Cr
EMD Value
₹17.8 L
Closing Date
24 Jun 2026, 4:00 pmClosed
EE, RWD, HAWAI
Office of the Executive Engineer Rural Works Division, Hawai, Anjaw District, Arunachal Pradesh
Construction of Arch Bridge across Krosam River on Road from PMGSY Road (Halaikrong) to staging Hut Krosam in Hawai-Walong Block of Anjaw District (A.P) under VVP (Span-50.00m)
2026_CEAR_148218_1
AR16011429880A
Open Tender
Civil - Roads and Bridges
Item Rate
730 days
Arch Bridge across Krosam River
As per SBD
10 documents required · 10 mandatory
₹15,000
ARRDA, Itanagar
₹17.8 L
HAWAI
22 Jul 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
24 Jun 2026
10 Jun 2026
10 Jun 2026 - 24 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Confirmity SSI | |||||
| 1.01 | Conduct of Bore Hole Testing, as per IS:54:2000 sinking of 150 mm dia Bore Hole into the Sub Surface and conduct of all necessary tests and subission of report with recommendation in three copies | 1 | Job | 100 | ₹100 |
| 2Foundation (Excavation for Structures) | |||||
| - | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)II) Ordinary rock (not requiring blasting)
B Mechanical Means(i) Depth upto 3 m ( without de-watering) A) Ordinary Soil | 1,266.43 | Cum | 100 | ₹1,26,643 |
| - | (IV) Hard rock ( blasting prohibited )Mechanical Means ( without de-watering) | 3,799.28 | Cum | 100 | ₹3,79,928 |
| - | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 37.15 | Cum | 100 | ₹3,715 |
| - | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30. With Batching Plant, Transit Mixer and Concrete Pump | 149.5 | Cum | 100 | ₹14,950 |
| - | Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and Technical Specifications | 16.18 | MT | 100 | ₹1,618 |
| 3Sub Structure | |||||
| - | Plain/Reinforced Cement Concretein Sub structure complete as per drawing Technical Specifications. RCC Grade M30, Height 5m to 10m. With Batching Plant, Transit Mixer and Concrete Pump. | 209.57 | Cum | 100 | ₹20,957 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.26 MB
Tendernotice_3.pdf
PDF • 0.49 MB
SBD.pdf
Tender Documents • 2.01 MB
BOQ_231996.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .