Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹68.7 L
Closing Date
10 Jun 2026, 3:00 pm4d left
Chief Engineer
Lucknow Municipal Corporation
Construction of the new Central Workshop on Municipal Corporation land situated in Sarvodaya Nagar (Village Bastauli).
2026_DOLBU_1157221_1
40/CE/2026-27
Open Tender
Civil Works
Lucknow Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹41,300
Lucknow Municipal Corporation
₹68.7 L
5 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ADMIN BLOCK (G+3) CIVIL WORK | - | - | - | - |
| 2 | Cleaning of Jungle & removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | SQM | 13.91 | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | CUM | 205.63 | - |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 0.6 | CUM | 553.37 | ₹331.47 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | 1,677.67 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | - | CUM | 5,381.17 | - |
| 7 | Making apron (with Drain & other )analysis 230x230mm | - | Rm | 1,019.84 | - |
| 8 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 0.4 | SQM | 244.93 | ₹97.97 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Suspended floors, roofs, landings, balconies and access platform | - | SQM | 732.49 | - |
| 10 | (b) Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | SQM | 581.72 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_2168439.xls
BOQ • 1.53 MB
RFPsignRRoffice.pdf
Tender Documents • 4.75 MB
Download all tender documents and submit your bid