Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | -34.38% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 CrAdmitted-Finance | -33.39% | ₹1.7 Cr | L2 | Admitted-Finance |
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
5 Feb 2026, 6:00 pmClosed
Senior Regional Manager, RIICO, Bhiwadi Unit
RIICO, Bhiwadi Unit-II, Rest House Road, RIICO Chowk, Bhiwadi, Distt. Alwar (Rajasthan)
Construction of RCC Divider at Industrial area Tapukara
2026_RIICO_529395_1
2025-2026/29
Open Tender
Civil Works
180 days
Industrial area Tapukara
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
SSO Id of Contractor
₹5.1 L
17 Feb 2026
19 Jan 2026
6 Feb 2026
19 Jan 2026
5 Feb 2026
19 Jan 2026
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision.
Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Walls (any thickness) including attached pilasters, buttresses plinth and string course.
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)
Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding. New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ).
Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc., Good soil of earth
Maintenance of lawn, Spreading of manure , good earth in required thickness (cost of manure and good earth to be separately )
Dismantling kerb stones by manual means and disposal of dismantled material with all lifts and upto a lead of 1000 m as per MoRTH Specification Clause 202.
Clearing and Grubbing Road Land, Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201., By Manual Means, In area of non-thorny jungle
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
td.pdf
Tender Documents • 0.78 MB
BOQ_944246.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid