Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹5,000
Closing Date
12 Dec 2023, 3:00 pmClosed
Block Development Officer (VP) Annavasal
Block Development Officer (VP) Panchayat Union, Annavasal
Construction of Burial and Waiting Shed at Poongudi
2023_RDTN_396093_1
2553/2023/T2 Dt.01.12.2023
Open Tender
Civil Works
Item Rate
180 days
Annavasal
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
Yes
12 Dec 2023
5 Dec 2023
12 Dec 2023
5 Dec 2023
12 Dec 2023
5 Dec 2023
5 Dec 2023 - 12 Dec 2023
Amount
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per ss 20 B.
Filling with M.sand including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Reinforced Cement Concrete 1:1.5:3 mix for RCC using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for Sides and soffits including cost and conveyance and all labour charges etc., complete.
Below GL
Above GL
Supplying and fabrication of steel including cost and conveyance and all labour charges etc., complete.
Brick Work in Cement Mortor 1:5 mix using courntry bricks including cost and conveyance of all materials to site and all labour charges etc., complete
Plastering Ceiling with cement mortor 1:3 mix 10mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete
Plastering Inside& outside with cement mortor 1:5 mix 12mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete
WHEATHERING COURSE CONCRETE TO 80 MM THICKNESS (AVERAGE) using 20mm size brick jelly slacked lime in the proportion 32:12:50 (no sand to be used) including cost and conveyance costof al materials to work site and labour charges and finishing with one layer
Finished with one course of pressed tiles of size 23x23x2cm (20% New Ties) with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete complying with standard specification as directed. (25mm thick)
White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete.
Painting two coats with Exterior Emulsion including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ABDHUL MALIK
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .