Tender Value
₹2.0 Cr
EMD Value
₹2.5 L
Closing Date
21 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
DEN 2
15 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
75 conditions · 21 needing a document upload
" No post tender correspondence will be done with the participant tenderer(s) for deficient credentials noted during scrutiny of tender/offer nor any credential will be accepted after opening of the tender and the offer shall be decided on the basis of submitted/Credentials downloaded with offer only"
If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender.
After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm / Partnership Firm / Registered Company/ Registered Trust / Registered Society/HUF etc. shall be neither asked nor considered, if submitted.Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office files etc. will be taken for consideration of the tender, if no such mention is available in tender offer submitted
No post tender correspondence will be done with the participant tender(s) for deficient credentials noted during scrutiny of tender/offer nor any credential will be accepted after opening of the tender and the offer shall be decided on the basis of submitted/Credentials downloaded with offer only.
Tenderers attention is invited to clause I of Section VII and other relevant clauses of Section I and II whereby in case of non- submission/non compliance, the tender offer is likely to be rejected.
The tenderer/s shall submit a duly filled Tender form TENDER FORM (First Sheet) as per "ANNEXURE-I" OF STANDARD TENDER DOCUMENT"
BID Security (Bank Guarantee Bond from)-Annexure-XXII, The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e.excluding the last date of submission of bids)
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted a longwith bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-V. In addition to Annexure-V, in case of other than Company/Proprietary firm, Annexure-V (A) shall also be submitted by the each member of a Partnership Firm/ Joint Venture (JV)/Hindu Undivided Family (HUF)/ Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above Certificate(s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/digitally signed by which they/he is qualifying the Qualifying Criteria mentioned in the Tender Document.
The following documents should be specified for submission along with tender:
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, Date of actual start, actual completion and final value of contract should also be given.
D. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
The tenderers whether sole proprietor , a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship documents etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement , receive money, witness measurements, sign measurement books , compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
Bid Security: (a)Subject to exemptions provided under para 4(iv)) of this document, the tender must be accompanied by a Bid Security as mentioned in tender documents, failing which the tender shall be summarily rejected. (b)The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender. It is understood that the tender documents have been issued to the Tenderer(s) and the Tenderer(s), is / are permitted to tender in consideration of the stipulation on his / their part that after submitting his / Their tender subject to the period being extended further, if required by mutual agreement from time to time, he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to North East Frontier Railway. Should the tenderer fail to observe or comply with the foregoing stipulation, the amount deposited or Bank guarantee bond submitted as Bid Security for the due performance of the above stipulation, shall be forfeited to the Railway. (c)If his tender is accepted, (i)the Bid Security mentioned in sub para(a) above deposited in cash through e- payment gateway will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract; (ii)the Bid Security mentioned in sub para(a) above submitted as Bank guarantee bond, will be encashed as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation to the Bid Security that may happen thereto while in their possession, nor be liable to pay interest thereon. (d)In case Contractor submits the Term Deposit Receipt/Bank Guarantee Bond towards either the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security so retained as per sub para(c) above, to the Contractor.
The following documents should be specified for submission along with tender:
A. List of Personnel, Organization available on hand and proposed to be engaged for the subject work.
B. List of plant Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work.
C. List of Works completed in the last three financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work, Date of actual start, actual completion and final value of contract should also be given.
D. List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Clause regarding GST - (a) Tenderer should furnished their GSTIN numbers representing the States in which they are registered for GST, along with address of Registered Office, place of business in State etc. (b) The contract is under GST act & rules as applicable time to time. (c) All the bidders/tenders should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law.
l) The tenderer(s) are required to submit the test report of the stone ballast conforming to railways specifications as given in the condition no.7.2.2 of section-VI along with their offer, issued from the approved laboratory as listed in condition no 7.1.1(a) of section-VI in the tender documents otherwise their offer shall be summarily rejected. (This item will be applicable only for the tenders of supply of ballast) (Mandatory).
The tenderers whether Sole Proprietor, a limited company or a partnership firm he/they should submit authentic proof in terms of partnership deed, proprietorship documents etc. along with the tender. If he/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorizing him/her name to submit the tender, sign the agreement, receive money, witness measurements, sign measurement books, compromise, settie, relinquish any claims, preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
(a) At the time of creation of any new tender in IREPS works module, an option has been provided to the tendering authority for obtaining Bid Security Declaration in lieu of Bid Security/Earnest Money Deposit. In case this option is selected, the Bid Security/Earnest Money Deposit amount for the tender shall be NIL. (b) If the tendering authority decides to take Bid Security/Earnest Money Deposit, it shall be mandatory for the tendering authority to provide reasons, and upload the approval of competent authority for the same. The Competent Authority shall be the next higher authority to the authority competent to finalise the particular tender. (c) In case Bid Security Declaration in lieu of Bid Security/Earnest Money Deposit is allowed against a tender, the provision has been made in IREPS for the bidder to mandatorily submit the following declaration along with his offer : If the bidder fails to submit the Bid security declaration, the bid will be rejected irrespective of winning the bid and qualifying for the tender.
Maintenance of track including Distressing of LWR, Ballast Boxing, Lubrication of ERCs & Liners, Painting of rails etc. along with all other ancillary works in LLBR- BHRB section under the jurisdiction of SSE/P-WAY/LLBR for one year.
SCL-ENGG-105-2025~NFR
SCL-ENGG-105-2025
Open
Works - General
12 Months
Hojai, Assam
₹0
₹2.5 L
21 Jan 2026
24 Dec 2025
7 Jan 2026
89 items across 6 schedules · ₹1,95,01,182.81 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Driving rails 90R/52 Kg section below average ground level within the slope/toe of embankment including making of nose with contractor's own arrangement complete in all respect Note: Payment will be made as per actual driven length of rail which will be supplied free by Railways at the site of work. | Metre | 300.00 | 123.99 | 37,197 |
| 2 | Supplying fabricating and erecting welded and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only. | MT | 1.00 | 1,38,571.69 | 1,38,571.69 |
| 3 | Cess repair/widening work as per RDSO Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. | cum | 800.00 | 505.65 | 4,04,520 |
| 4 | Extra over item 113010 for earth-work for making cess on other side of the track (when no approaches available along track or no road vehicles to work at site) by dumping contractor's own earth, collected along toe of bank of any height on to other side of track & side slope of the existing bank by head load, duly crossing of tracks with all contractor's materials, labour, tools, plant including loading of earth in baskets, lifting, leading to the non-cess side of bank including crossing of tracks & dumping etc. and as directed by the Engineer in-charge. | cum | 300.00 | 50.57 | 15,171 |
| 5 | Cleaning of side drains along the track including disposing of muck beyond Railway boundary as per instructions of Engineer in- charge to keep drains clean and clear in cuttings etc. | RM | 800.00 | 36.37 | 29,096 |
| 6 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 10000.00 | 16.74 | 1,67,400 |
| 7 | Trimming of tree branches coming within 6m of centre line of track & those obstructing views of Curves/LCs / Signal / Indicator at locations in section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Note: Girth of more than 20 cm will only be considered as tree branch. | Each | 200.00 | 192.15 | 38,430 |
| 8 | Kilometre & Gradient post | Each | 300.00 | 103.89 | 31,167 |
| 9 | Hectometre Post | Each | 250.00 | 121 | 30,250 |
| 10 | LWR / SEJ Board | Each | 100.00 | 188.03 | 18,803 |
| 11 | Curve Board | Each | 100.00 | 188.03 | 18,803 |
| 12 | Bridge Board | Each | 10.00 | 188.03 | 1,880.3 |
| 13 | Bridge Tablet | Each | 20.00 | 52.7 | 1,054 |
| 14 | Miscellaneous General Boards, Jurisdiction Boards, Structures etc. | Sqm | 10.00 | 147.45 | 1,474.5 |
| 15 | Attending the CC apron repairs under the sleeper where there is separation of PSC Sleeper along whole periphery and puncturing of apron under the sleepers, chiselling as required including removal of foreign materials from the sleeper trench and dewatering duly filling cement concrete with CONBEXTRA-GP2 or similar, the narrow gaps completely including pouring, finishing, curing to match with the existing C.C.apron surface and slopes complete, labour charges in traffic block and as per the direction of Engineer In charge. | Each | 100.00 | 2,222.01 | 2,22,201 |
| 16 | 80mm thick blocks M-35 grade for medium traffic. | Sqm | 200.00 | 1,423.44 | 2,84,688 |
| 17 | 120mm thick blocks of M-40 grade for heavy traffic. | Sqm | 200.00 | 1,887.83 | 3,77,566 |
| 18 | Fixing vertically the unserviceable PSC sleepers at locations of tress-passing, railway boundary or to make temporary store by excavating trench, fixing PSC sleeper in trench and filling back open trench. | Each | 50.00 | 169.18 | 8,459 |
| 19 | Supplying and spraying in specified proportion Weedicide Chemical, capable to kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in all respect. Scientific name of the chemical is Isopropylamine Salt of Glyphosate, in which active ingredient is Glyphosate (41%), colour is light amber to brownish, very low in toxicity and has favourable environmental characteristics. It will be ensured that no weed growth occurs up to six months period, otherwise re-spraying shall be done by the contractor free of cost. | Sqm | 50000.00 | 0.75 | 37,500 |
| 20 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 30.00 | 827.84 | 24,835.2 |
| 21 | Supply, filling and stacking of sand bags layer by layer filled with Railway Sand/railway quarry dust in Contractor's empty polythene cement bags of 50 kg bags with all contractors labour, tools, plants, lead, lift etc., including stitching the same with machine using polythene thread complete as directed by Engineer-in charge at site. | Each | 10000.00 | 16.55 | 1,65,500 |
| Schedule total | ₹20,54,566.69 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .