Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
12 Aug 2021, 4:00 pmClosed
SE EDC-I RAEBARELI
SE EDC-I RAEBARELI
WORK MENTIONDED IN BOQ
2021_MVVNL_609373_1
41/EDC-I,R/2021-22
Open Tender
Electrical Works
Item Wise
30 days
UNDER EDD-II RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EX ENGINEER C AND MC RAEBARELI
₹2,000
Yes
18 Aug 2021
7 Aug 2021
13 Aug 2021
7 Aug 2021
12 Aug 2021
7 Aug 2021
Amount
CARTAGE OF STORE ITEMS FORM ESC, RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONG WITH LOADING, UN-LOADING AND PROPER STACKING
8.5 Mtr long PCC Poles
11 Mtr long ST Poles
loose line material including ACSR weasel conductor Mtr. 3465.00, ABC of size 3x95MM2 Mtr. 300.00 and other remaning items.
Errection
Errection of 8.5Mtr long PCC Pole including digging of Pits & fitting of accessories.
Errection of 11Mtr long ST Pole including digging of Pits & fitting of accessories.
Dis-mantling of existing wire of 11kv line (01 Span) .and re-laying, stringing & sagging of 3Ø3wire 11 kv line by dismanteld wire. complete in all respect as per RESSPO norms.
Errection of D/P by 11 Mtr Long ST Pole including digging of Pits & fitting of accessories.
Laying, stringing & sagging of 3Ø3wire 11 kv LT line by ACSR weasel conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required.
Laying of ABC of size 3x95mm2.complete in all respect as per RESSPO norms
Construction of plinth for mounting of 250 KVA T/F. complete in all respect as per RESSPO norms required material will be provided by the contractor.
Mounting of 250 KVA transformer on plinth including all associated works as required.
Making wire mesh fencing complete in all respect as per RESSPO norms required material will be provided by the contractor.
Well type pipe earthing of 250KVA T/F body & its neutral. Complete in all respect as per RESSPO norms. Required T & P will be provided by the contractor.
Dismantling of 11kv line on exiting pole including rolling back its conductor, GI wire etc.
Dis-mantling of pole .
cartage of receive back conductor/scrap from work site to ESC Tripula, Raebareli alongwith loading and un-loading
cartage of dismanteld/ receive back PCC pole from work site to ESC Tripula, Raebareli alongwith loading and un-loading
Shree Geetanjali Agency
M/S SUBHASH TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .