Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC AT LAMTIBAHAL BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768233 | JHARSUGUDA | ODISHA | 768233 | ₹1.7 L | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical AT PO RAMPUR COLLIERY PS BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | - | - | Rejected-Technical not being L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical not being L1 |
| Sl No | Description | Qty | Unit | Rahul Mahato L1 | Rajkishore Deb L3 | MAA TARINI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00Supply fitting Tyre Coupling F-140 for Quarry Pump with Plastic rope for movement of Pontoon at LOCP. | ||||||
| 1.01 | Tyre coupling | 4 | set | 22,236 ₹88,944 Lowest | 23,500 ₹94,000 | 23,000 ₹92,000 |
| 1.02 | Machining charge | 4 | set | 1,621 ₹6,484 Lowest | 1,750 ₹7,000 | 1,700 ₹6,800 |
| 1.03 | Key way cutting | 8 | set | 760 ₹6,080 Lowest | 790 ₹6,320 | 780 ₹6,240 |
| 1.04 | Cost of Tyre for Tyre cag | 10 | no | 3,509 ₹35,090 Lowest | 3,650 ₹36,500 | 3,600 ₹36,000 |
| 1.05 | Cost of Plastic rope 22 mm | 200 | kg | 155 ₹31,000 Lowest | 170 ₹34,000 | 160 ₹32,000 |
| 1.06 | 01 semi skilled X 02 shift X02 days | 4 | shift | 644 ₹2,576 Lowest | 655 ₹2,620 | 650 ₹2,600 |
| 1.07 | 01 Un skilled labour X 02 shift X 02 days | 4 | shift | 551 ₹2,204 Lowest | 562 ₹2,248 | 560 ₹2,240 |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
13 Apr 2026, 5:00 pmClosed
Project Engineer(EnM),Locp
Office of project engineer(EnM) LOCP
Supply fitting Tyre Coupling F-140 for Quarry Pump with Plastic rope for movement of Pontoon at LOCP.
2026_MCL_357816_1
MCL/GM/IBV/ENM/LOCP/044 dated 31/03/2026
Open Tender
Miscellaneous Works
Item Rate
15 days
Office of project engineer(EnM) LOCP
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,500
16 May 2026
31 Mar 2026
15 Apr 2026
31 Mar 2026
13 Apr 2026
1 Apr 2026
31 Mar 2026 - 6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply fitting Tyre Coupling F-140 for Quarry Pump with Plastic rope for movement of Pontoon at LOCP. | |||||
| 1.01 | Tyre coupling | 4 | set | - | - |
| 1.02 | Machining charge | 4 | set | - | - |
| 1.03 | Key way cutting | 8 | set | - | - |
| 1.04 | Cost of Tyre for Tyre cag | 10 | no | - | - |
| 1.05 | Cost of Plastic rope 22 mm | 200 | kg | - | - |
| 1.06 | 01 semi skilled X 02 shift X02 days | 4 | shift | - | - |
| 1.07 | 01 Un skilled labour X 02 shift X 02 days | 4 | shift | - | - |
| 2Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.79 MB
Tendernotice_2.pdf
PDF • 1.19 MB
BOQ_370680.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .