Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.8 L
Closing Date
22 Dec 2021, 4:30 pmClosed
xen rew kathua
xen rew kathua
Constt. of lane drain from H/O Krishan dev to national highway
2021_RDPR_153030_15
e-NIT No. 210 REW/K of 2021 Dated 13/12/2021
Open Tender
Civil Works
Item Rate
30 days
Barnoti
sbd
2 documents required · 2 mandatory
₹500
Yes
xen rew kathua
Exempted
24 Dec 2021
13 Dec 2021
23 Dec 2021
14 Dec 2021
22 Dec 2021
14 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedAll kinds of soil :1 meter from cutting edge including aLL carriages and lifts
Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:5:10(1 cement:5 coarse sand:10 garded stone )40 mm nominal size including all lift and carriages
Providing and laying in position cement concrete of specified grade inculding curing but excluding the cost of centring and shuttering- All work upto plinth level in 1:3:6(1 cement:3 coarse sand:6 garded stone )40 mm nominal size including all lift and carriages
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages and lifts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelMild steel and medium tensile steel bars
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including all carriages and lifts
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. including all carriages and lifts
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate.
Centering and shuttering including strutting, propping etc. and removal of form work for
Eges of slab under 29 cm wide
Suspended floors, roofs, landings, balconies and access platforms.
Add cost of sign board including painting writing complete job
DALVIR SINGH GOVT CONTRACTOR
BALINDER SINGH GOVT CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .