Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹9.3 L+₹88,567.19 (10.5%)Accepted-AOC GRAM MUDAADIH POST GAJWAH JANPAD BALRAMPUR | SHRAVASTI | UTTAR PRADESH | 271201 | 2 | Accepted-AOC L-2 | |
| 3 | 3₹9.3 L+₹89,567.81 (10.7%)Accepted-AOC | 3 | Accepted-AOC L-3 | |
| 4 | 4₹9.5 L+₹1.1 L (13.0%)Accepted-AOC | 4 | Accepted-AOC L-4 | |
| 5 | 5₹9.7 L+₹1.3 L (15.4%)Accepted-AOC | 5 | Accepted-AOC L-5 |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
1 Nov 2024, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, Saryu Drainage Khand-3, Gonda
Construction work of siphon at km 4.350 of Bankatwa Rajwaha in Tulsipur tehsil of Balrampur district.
2024_UPIDC_964364_16
01/EE/2024-25
Open Tender
Civil Works
Item Rate
60 days
Tulsipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Executive Engineer, Saryu Drainage Khand-3, Gonda
₹24,000
20 Dec 2024
11 Oct 2024
11 Nov 2024
18 Oct 2024
1 Nov 2024
18 Oct 2024
Amount
Earth work including lead upto 30M & Lift upto 1.5M, excluding mechanical compaction but including manual compaction and dressing to profile. required for proper completion of work including cost of all T.& P., labour etc. For road/canal/flood embankment upto 1.5M height.
Dry earth work in foundation of Masonary work on channels of discharge below 10 Cumecs including lead upto 30M. And lift upto 1.5 M and its disposal.
Earth work in Making sub grade in lining work including watering, compaction and preparation of surface as per directions of engineer-in-charge required for proper completion of work including cost of all T.& P., labour etc.
Spreading cement slurry 1:3 over prepared subgrade for lining work with portland cement one coat including cost of all material, labour T&P etc. required for proper completion of work as per directions of engineer-in-charge.
Laying CC A40-M15 in foundation of structures with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (20-40 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & mechanical vibration including cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc.
Laying CC A20 M-20 with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (10-20 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & machanical vibration including cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc.
Laying RCC A20-M20(1:1.5:3) in lining of canal with cement (OPC 43 grade) corse sand of F.M. not less than 2.0 and hard stone ballast (10-20 mm size) including lead upto 60.00m, lift upto 3.0m. mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all T.& P., labour etc.
Centering and shuttering for R.C.C work with all leads and lift required for proper completion of work including cost of all T.& P., labour etc.
Cutting ,bending, binding & placing TMT steel for reinforcement with cost of binding wire. in all structures required for proper completion of work including cost of all materials, labour carriage, rehandling and T&P etc.
Supply and filling local sand in pits as per directions of Engineer-in-charge required for proper completion of work including cost of all T.& P., labour etc.
Providing and filling in position bitumen mix filler of proportion 80 kg. of hot bitumen, 1 kg. of cement and 0.25 cubic metre of coarse sand for expansion joints.
First class bricks work in 1:4 cement mortar with sand of 2.0 F.M. including cost of all material, lead, lift labour, and T&P etc.
Cement pointing in 1:2 (flush) cement mortar with sand of 2.0 F.M. on exposed surface of brick masonry including cost of all material, lead, lift labour, and T&P etc.
Brick work 1:3 in lining 160 mm thick (double layer) including 10 mm mortar underneath including cost of material and labour etc. required for proper completion of work as per directions of Engineer-in-charge.
S/F 1200mm dia R.C.C. Hume pipe (NP-3) including cost of material and labour etc. required for proper completion of work as per directions of Engineer-in-charge.
m/s kanihya lal yadav (BID ID -4695224)
JAMAL AHMAD CONTRACTOR (BID ID -4695263)
M/S SUSHIL KUMAR SINGH CONTACTOR (BID ID -4694401)
M/S V S CONSTRUCTORS (BID ID -4695002)
M/S MAA VAISHNAV CONSTRUCTION COMPANY (BID ID -4694771)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .