Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance | ₹6.8 L | L1 | Accepted-Finance due to lowest rate. |
| 2 | L2₹8.2 L+₹1.4 L (20.8%)Rejected-Finance 1090 GROUND FLOOR SECTOR 18 C CHANDIGARH | ₹8.2 L+₹1.4 L (20.8%) | L2 | Rejected-Finance due to higher rate. |
Tender Value
₹8.8 L
EMD Value
₹17,550
Closing Date
31 Aug 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Project Public Health Division No.1 Chandigarh
Rewinding of AHU/ CS AHU/ FCU and Cooling Tower 3 Phase Motors and all other contingent there in to Block- A,C,D and E of GMCH-32, Chandigarh
2026_CHD_95019_1
PH1/2026/446
Open Tender
Public Health Products
Percentage
90 days
Chandigarh
Scanned copy of Online UTR No.and Transaction Slip Receipt for Rs.17550Works completed during last 7Yrs, Performance Certificates, Annual Financial Turn Over for the last 3yrs, Affidavit reg.non blacklisted as mentioned in the tender documents.
2 documents required · 2 mandatory
₹0
₹17,550
9 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
31 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismentling, Repair & rewinding of 3 Phase Cooling tower Motor (725 rpm to 1000 rpm ) as per site rebushing, alingnement of shaft and refiting including replacement of all the defective items as required, including the cost of Nuts Bolts, rubber sheet, bearing, Connection Plates, Sleeve , Thimble, Electircal connection, labour,Carriage, etc. complete in all respect to entire satisfaction of EIC. The work included removal & refixing of cooling tower motor from cooling tower with six month guarantee of replaced part's and copper winding. | |||||
| 1.1 | 7.5 HP | 2 | Nos. | 31,435 | ₹62,870 |
| 1.2 | 12.5 HP | 2 | Nos. | 40,510 | ₹81,020 |
| 2Dismentling repair and rewinding of AHU motor, including rebushing, alingnement of shaft and refiting including replacement of all the defective items as required, including the cost of Nuts Bolts, rubber sheet, bearing, Connection Plates, Sleeve , Thimble, Electrical connection, labour, Carriage for AHU motor at various AHU's at various level of different block of GMCH etc. with six month guarantee of replaced part's and copper winding complete in all respect to entire satisfaction of EIC. | |||||
| 2.1 | 3.0 HP To 5.0 H.P | 7 | Nos. | 14,115 | ₹98,805 |
| 2.2 | 7.5 H.P | 4 | Nos. | 19,325 | ₹77,300 |
| 2.3 | 10.0 HP | 4 | Nos. | 22,340 | ₹89,360 |
| 2.4 | 12.5 H.P to 20.0 H.P | 4 | Nos. | 23,985 | ₹95,940 |
| 3Dismentling, Repair & rewinding of ( FCU)/ Cassette AC Motor including rewinding rebushing and refiting including replacement Shaft and capacitor and all the defetive items as required, including the cost of Nuts Bolts, rubber sheet, bearing labour etc with six month guarantee of replaced part's and copper winding complete in all respect. | |||||
| 0.0 | (1.5/ 2.0 TR FCU) / Cassette AC of 2.0/4.0 TR | 30 | Nos. | 2,600 | ₹78,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.60 MB
BOQ_116639.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .