| Sl No | Description | Qty | Unit | BALAMURUGAN ENTERPRISES L1 | C BALASUBRAMANIAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged RCC slab work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 1 | m3 | 3,614 ₹3,614 Lowest | 3,650 ₹3,650 |
| 2.00 | Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 3 | m3 | 116 ₹348 Lowest | 119 ₹357 |
| 3.00 | Dismantling the damaged Cement mortar concrete wall work as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 1 | m3 | 534 ₹534 Lowest | 600 ₹600 |
| 4.00 | Earth work for drain to required depth, either by cutting and disposal of excavated soil to areas of fill or by filling with earth suitable for filling brought from areas of cutting or borrow pits in all kinds of soils except rock requiring blasting | 95 | m3 | 135 ₹12,825 Lowest | 150 ₹14,250 |
| 5.00 | Conveyance the excess earth or earth not suitable for refilling, dumping and spreading, levelling of the same at places of dump approved by departmental officers and as directed including lorry hire charges, labour for loading, unloading, spreading, leveling, making approaches for areas of dumps etc., complete. | 61 | m3 | 68 ₹4,148 Lowest | 75 ₹4,575 |
| 6.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 2 | m3 | 5,590 ₹11,180 Lowest | 5,590 ₹11,180 Lowest |
| 7.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) | 61 | m2 | 978 ₹59,658 Lowest | 1,000 ₹61,000 |
| 8.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification. | 8 | m3 | 6,963 ₹55,704 Lowest | 6,963 ₹55,704 Lowest |
| 9.00 | Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123 | 12 | m2 | 1,086 ₹13,032 Lowest | 1,086 ₹13,032 Lowest |
| 10.00 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning,cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. | 2 | Qtl | 9,321 ₹18,642 Lowest | 9,321 ₹18,642 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Aug 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Construction of UGD chamber and laying of UGD pipeline omitted areas at Gokulam colony 4th street in ward no 74, West Zone
2025_MAWS_589766_30
E3/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
1 Apr 2026
7 Aug 2025
19 Aug 2025
7 Aug 2025
19 Aug 2025
7 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
BOQ_705107.xls
BOQ • 0.26 MB
SWD.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .