Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Finance SUBHADARSAN PARK NO 3 VEERIYAMPALAYAM KALAPATTI COIMBATORE 641 048 | COIMBATORE | TAMIL NADU | 638459 | Not Admitted-Finance Others-Bid document submission not properly |
Tender Value
₹39.8 L
EMD Value
₹39,800
Closing Date
17 Nov 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Commissioner, Coimbatore Corporation
Big bazaar street, Town hall, Coimbatore-1
Removing and shifting of demaged hump pipe at Sukerawarpet main road near Pasuvannan temple from Thiyagikumaran veethi to RG street in ward no.25,central zone.
2021_MAWS_213078_1
e20/2021 (Two Cover)
Open Tender
Civil Works
Works
180 days
ward no.25, central zone
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,800
13 Dec 2021
10 Nov 2021
18 Nov 2021
10 Nov 2021
17 Nov 2021
10 Nov 2021
90 days
Amount
Labour for cutting open BT and maccadam road surface for laying sewers complete as per standard specifications and as directed by enginners
Earthwork excavation and depositing on bank, with in initial lead of 10m and initial lift of 2m in hard stiff clay,stiff black cotton, hard red earth, shales, murrams, gravel, stoney earth and earth mixed with small size houlders and hard gravel soil SS 20B
upto 2.00 m
Earthwork excavation and depositing on bank with an initial lead of 10 m and initial of 3m in soft disentegrated rock, laterite, soft rock, kankar not requiring blastering
Earthwork excavation and depositing on bank with an initial lead of 10 m and initial of 4m in soft disentegrated rock, laterite, soft rock, kankar not requiring blastering
Earthwork excavation and depositing on bank with an initial lead of 10 m and initial of 5m in soft disentegrated rock, laterite, soft rock, kankar not requiring blastering
Earthwork excavation and depositing on bank with an initial lead of 10 m and initial of 6m in soft disentegrated rock, laterite, soft rock, kankar not requiring blastering
Removal of the burst RCC from the pipe line and removal of slushy soil and bailling out water and replacing the pipe line with sand pipe including jointing the cost of refilling the pipe line with water for retesting the pipe line etc.,
Shoring and strutting with sheet piles/wooden piles and planks with necessary support for excavation beyond depth of 2m including cost of sheet piles/wooden piles, plank and other materials, removing shoring and strutting after the pipe are laid etc.,
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrams, gravel, stoney earth and mixed with small size boulders and hard grvelly soil-SS 20B
upto 2.00 m
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 2m in soft disentergrated roak, laterite, soft rock,kanker not requiring blastering up to 2.00 m
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 3m in medium rock and dense medium rock not requiring blastering
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 3m in medium rock and dense medium rock not requiring blastering
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 4m in medium rock and dense medium rock not requiring blastering
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 5m in medium rock and dense medium rock not requiring blastering
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 5m in hard rock removing hard rock by wedging,chiselling and trimming to proper shane whatever blastering
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 6m in medium rock and dense medium rock not requiring blastering
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 6m in hard rock removing hard rock by wedging, chiselling and trimming to proper shape whatever blastering is prohibited
Earth work excavation and depositing on bank with an initial lead of 10 m and initial lift of 6.30m in hard rock removing hard rock by wedging, chiselling and trimming to proper shape whatever blastering is prohibited
Removal of the burst RCC from the pipe line and removal of slushy soil and bailling out water and replacing the pipe line with sand pipe including jointing the cost of refilling the pipe line with water for retesting the pipe line etc.,
350mm dia
Supply and lowering of NP3 Class RCC hume pipe 600 mm dia SS
Jointing of RCC pipes of NP3 class of different sizes excluding earth work excavation for trenches and carting of pipes to the site work lowering into the trenches and aligning to proper grade hydraulic testing including conveyance of water to fill the pipes including cost of jointing materials and cost of jointing materials and cost of dewatering complete as per standard
Dewatering from pipe line trenches by using pumpsets 7.5 HP including hire charges and wages
Providing sand bedding using M sand laying in layers of 20 cm thick including cost of materials and labour charges for filling the foundation including watering consolidation etc., complete for pipe bedding
PCC 1:2:4 (one cement two sand and four coarse aggregate ) using 20 mm HBG stone including mixing concrete laying curing and compacting of concrete etc., complete as directed by the the officers
Refilling the outside of the well with excavated earth (other than sand) complying with standard specification for filling the foundation for filling the foundation including watering consolidation etc., complete as directed by the officers
Disposal of surplus earth including loading , conveyance with in a distance of 5kms and spreading as directed by the officers
Barricading the trenches for one side using casuarina poles 8 to 10 cm dia white PVC tape 15 mm wide with red strips printed in two rows 75 mm dia red reflectors in every 3 m length providing two no of reflectors in every 150 m length including the cost of all materials charges for fixing of barricading and removal of barricading after testing and filling the trench and stacking the cost
Conveyance of pipe to work site including loading unloading and transporation up to 8 km and part there of data
Testing of RCC pipes 600 mm dia pipes (NP3 pipe)
House service connection supplying laying jointing testing of 110 mm UPVC pipes including earth work exacavation for trenches in hard stiff clay stiff black cotton hard red earth shalles murrams gravel stoney earth and earth mixed with small size boulders carting of pipes to the site work lowering in to trenches to proper grade and alignment conveyance of water filling the pipes during testing refilling the excavated earth in layer not less than 23 cm thick watering ramming to consoldation and disposal of earth with in 5 km lead barricating works along both sides to the trenches including jointing materials including end cap and cost of timbering
Replacement of underground utilties (GI pipe) damaged during earth work excavations for pipe laying works including cost of additional earth work excavation in all soil strata including BT/CC road cutting removal of slushy soil and replacing the pipe line with sound pipe including supply and delivery of PVC pipes couplers jointing materials and required specials cutting conveying laying jointing and cost of refilling for the additional earth work etc., complete and as directed by TWAD SOR item no.46 pg.no.287
25 mm GI pipe
50 mm GI pipe (borewell water)
Replacement of underground utiities (PVC pipe) damaged during earth work excavations for pipe laying works including cost of additional earth work excavation in all soil strata including BT/CC road cutting removal of slushy soil and replacing the pipe line with sound pipe including supply and delivery of PVC pipes couplers jointing materials and required specials cutting conveying laying jointing and cost of refilling for the additional earth work etc., complete and as directed by TWAD SOR item no.46 pg.no.288 200 mm PVC (10ksc)
Road restoration with cement concrete 1:4:8 10 cm thick using 40 mm HBS metal and cement concrete 1:2:4 10 cm thick using 20 mm HBS metal cost of all materials laying curing earth work excavation for a depth of 40 cm and sand filling for 20cm depth with filling M sand etc., complete and as directed by the officers
Earthwork
Disposal of surplus earth
Wet mix
Conveying sewage and sullage water from the site to 15 km including transport loading and unloading etc., complete
NPK Associates
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .