| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L Quoted ₹8.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹8.9 L+₹2,555 (0.29%)Rejected-AOC | ₹8.9 L+₹2,555 (0.29%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹9.6 L+₹72,310 (8.15%)Rejected-AOC CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹9.6 L+₹72,310 (8.15%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹9.6 L+₹73,220 (8.25%)Rejected-AOC RAM SHIV COLONY GALI NO 2 NAIKA CHATNAG ROAD JHUNSI PRAYAGRAJ UP 211019 | PRAYAGRAJ | UTTAR PRADESH | 211019 | ₹9.6 L+₹73,220 (8.25%) | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | TARA ENTERPRISES L4 | M/S RAGBIR ENGINEERING SERVICES L2 | Jai Maa Electrical Works L3 | M/s A.S. ENGINEERS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Opening of self starter from the DG Set, dismentling/strip opening for inspection and servicing/ Overhauling 12 Volt of cap 10 KVA to 75 KVA i.e. Cleaning of self starter including supply & replacement of carbon brushes if required and making it free from dust and other sticky particle complete, reassembling after replacement of UNSV worn out parts if required for smooth operation and reinstallation to DG set of any make/model complete as per satisfaction of Engineer-in-Charge.
Note: Cost of replacement of carbon brushes is included in the rates quoted against this item . However supply of other spares parts required for making self starter serviceable will be paid separetely in relevant items of this BOQ hereinafter. | 2 | Each Job | 500 ₹1,000 Lowest | 1,500 ₹3,000 | 2,500 ₹5,000 | 500 ₹1,000 Lowest |
| 1.01 | Supplying only as in replacement of burnout solenoid switch as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | 550 ₹550 | 500 ₹500 Lowest | 900 ₹900 | 800 ₹800 |
| 1.02 | Rewinding of burnout armature of self starter including supply of heavy duty, high quality ''H'' Class super enamelled copper wire, soldering or brazing and insulate the joint with fiber glass sleeves as per repair norms/ site requirement and as directed by Engineer-in-Charge. | 1 | Each Job | 600 ₹600 Lowest | 750 ₹750 | 2,000 ₹2,000 | 3,500 ₹3,500 |
| 2.00 | Opening of self starter from the DG Set, dismentling/strip opening for inspection and servicing/ Overhauling 12/24 Volt of cap 125 KVA to 250 KVA i.e. opening, checking and cleaning of self starter including supply & replacement of carbon brushes if required and making it free from dust and other sticky particles and reassembling after replacement of UNSV worn out parts if required for smooth operation and reinstallation to DG set of any make/model complete as per satisfaction of Engineer-in-Charge.
Note: Cost of replacement of carbon brushes is included in the rates quoted against this item . However supply of other spares parts required for making self starter serviceable will be paid separetely in relevant items of this BOQ hereinafter. | 2 | Each Job | 700 ₹1,400 | 1,750 ₹3,500 | 3,000 ₹6,000 | 500 ₹1,000 Lowest |
| 2.01 | Supply only as in replacement of burnout solenoid switch as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | 600 ₹600 | 500 ₹500 Lowest | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 2.02 | Rewinding of burnout armature of self starter including supply of heavy duty, high quality ''H'' Class super enamelled copper wire, soldering or brazing and insulate the joint with fiber glass sleeves as per repair norms/ site requirement and as directed by Engineer-in-Charge. | 1 | Each | 1,000 ₹1,000 | 750 ₹750 Lowest | 2,500 ₹2,500 | 2,500 ₹2,500 |
| 3.00 | Opening of self starter from the DG Set, dismentling/strip opening for inspection and servicing/ Overhauling 24 Volt of cap 320 KVA to 500 KVA i.e. opening, checking and cleaning of self starter including supply & replacement of carbon brushes if required and making it free from dust and other sticky particles and reassembling after replacement of UNSV worn out parts if required for smooth operation and reinstallation to DG set of any make/model complete as per satisfaction of Engineer-in-Charge.
Note: Cost of replacement of carbon brushes is included in the rates quoted against this item. However supply of other spares parts required for making self starter serviceable will be paid separetely in relevant items of this BOQ hereinafter. | 2 | Each Job | 1,000 ₹2,000 | 2,000 ₹4,000 | 4,000 ₹8,000 | 800 ₹1,600 Lowest |
| 3.01 | Supplying as in replacement of burnout solenoid switch as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | 800 ₹800 | 500 ₹500 Lowest | 1,500 ₹1,500 | 1,200 ₹1,200 |
| 3.02 | Rewinding of burnout armature of self starter including supply of heavy duty, high quality ''H'' Class super enamelled copper wire, soldering or brazing and insulate the joint with fiber glass sleeves as per repair norms/ site requirement and as directed by Engineer-in-Charge. | 1 | Each Job | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest | 3,000 ₹3,000 | 3,000 ₹3,000 |
| 4.00 | Opening of AVR from the alternator, inspection for voltage output check, M & L for Repair/ replacement of (AVR) automatic voltage regulator Diode forward and reverse rotating rectifier assembly, half wave phase controlled thyristor type, complete all as per existing type & size for DG set of capacity 10 KVA to 75 KVA, complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | 2,500 ₹2,500 Lowest | 2,500 ₹2,500 Lowest | 3,000 ₹3,000 | 3,000 ₹3,000 |
Tender Value
₹13.1 L
EMD Value
₹26,160
Closing Date
24 Jul 2026, 6:00 pmClosed
Garrison Engineer
GE (U) Chandimandir Pin-134107
CA NO GE(U)/CHM-09/2026-27 COMPREHENSIVE MAINTENANCE OF DG SETS UNDER AGE E/M-II OF GE (U) CHANDIMANDIR
2026_MES_774693_1
GE(U)/CHM-09/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
240 days
GE (U) Chandimandir
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
GE (U) Chandimandir
₹26,160
Yes
31 Aug 2026
25 Jun 2026
28 Jul 2026
25 Jun 2026
24 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Opening of self starter from the DG Set, dismentling/strip opening for inspection and servicing/ Overhauling 12 Volt of cap 10 KVA to 75 KVA i.e. Cleaning of self starter including supply & replacement of carbon brushes if required and making it free from dust and other sticky particle complete, reassembling after replacement of UNSV worn out parts if required for smooth operation and reinstallation to DG set of any make/model complete as per satisfaction of Engineer-in-Charge.
Note: Cost of replacement of carbon brushes is included in the rates quoted against this item . However supply of other spares parts required for making self starter serviceable will be paid separetely in relevant items of this BOQ hereinafter. | 2 | Each Job | - | - |
| 1.01 | Supplying only as in replacement of burnout solenoid switch as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | - | - |
| 1.02 | Rewinding of burnout armature of self starter including supply of heavy duty high temp. super enamelled copper wire as per site requirement and as directed by Engineer-in-Charge. | 1 | Each Job | - | - |
| 2 | Opening of self starter from the DG Set, dismentling/strip opening for inspection and servicing/ Overhauling 12/24 Volt of cap 125 KVA to 250 KVA i.e. opening, checking and cleaning of self starter including supply & replacement of carbon brushes if required and making it free from dust and other sticky particles and reassembling after replacement of UNSV worn out parts if required for smooth operation and reinstallation to DG set of any make/model complete as per satisfaction of Engineer-in-Charge.
Note: Cost of replacement of carbon brushes is included in the rates quoted against this item . However supply of other spares parts required for making self starter serviceable will be paid separetely in relevant items of this BOQ hereinafter. | 2 | Each Job | - | - |
| 2.01 | Supply only as in replacement of burnout solenoid switch as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | - | - |
| 2.02 | Rewinding of burnout armature of self starter including supply of heavy duty high temp. super enamelled copper wire as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | - | - |
| 3 | Opening of self starter from the DG Set, dismentling/strip opening for inspection and servicing/ Overhauling 24 Volt of cap 320 KVA to 500 KVA i.e. opening, checking and cleaning of self starter including supply & replacement of carbon brushes if required and making it free from dust and other sticky particles and reassembling after replacement of UNSV worn out parts if required for smooth operation and reinstallation to DG set of any make/model complete as per satisfaction of Engineer-in-Charge.
Note: Cost of replacement of carbon brushes is included in the rates quoted against this item. However supply of other spares parts required for making self starter serviceable will be paid separetely in relevant items of this BOQ hereinafter. | 2 | Each Job | - | - |
| 3.01 | Supplying as in replacement of burnout solenoid switch as per site requirement and as directed by Engineer-in-Charge. | 1 | Each | - | - |
| 3.02 | Rewinding of burnout armature of self starter including supply of heavy duty high temp super enamelled copper wire as per site requirement and as directed by Engineer-in-Charge. | 1 | Each Job | - | - |
| 4 | Opening of AVR from the alternator, inspection for voltage output check, M & L for Repair/ replacement of (AVR) automatic voltage regulator Diode forward and reverse rotating rectifier assembly, half wave phase controlled thyristor type, complete all as per existing type & size for DG set of capacity 10 KVA to 75 KVA, complete all as specified and directed by Engineer-in-Charge. | 1 | Each Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tenderdocuments09.pdf
Tender Documents • 0.95 MB
BOQ_867473.xls
BOQ • 0.30 MB
Corrigendum01.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .