| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 245 RAJABPUR RAJABPUR RAJABPUR JYOTIBA PHULE NAGAR UTTAR PRADESH 244236 | AMROHA | UTTAR PRADESH | 244236 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹15.0 L (13.4%)Admitted-Finance 599 GTB ENCLAVE DDA JANTA FLATS NEAR GTB HOSPITAL VILLAGE TOWN GTB ENCLAVE CITY DELHI EAST DELHI 110093 INDIA | NORTH EAST DELHI | DELHI | 110093 | ₹1.3 Cr+₹15.0 L (13.4%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents not as per PQC-A |
| Sl No | Description | Qty | Unit | U.S.Enterprises L1 | Syndicate Engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Complete external water washing of all floor of Boiler, from roof of pent house to zero meter and internal cleaning of second pass including dust disposal from pant house, dog house and economizer hopper. | 1 | Job | 70,900 ₹70,900 Lowest | 74,098 ₹74,098 |
| 2.00 | Supply and Erection of Cup lock scaffolding system in Ist and IInd pass. during OH period. | 1 | Job | 32,85,510 ₹32,85,510 Lowest | 36,75,878 ₹36,75,878 |
| 3.00 | High Pressure Jet Cleaning for Pressure parts with scope of supply of pumps. | 25 | Days | 20,795 ₹5,19,875 Lowest | 23,028 ₹5,75,700 |
| 4.00 | High Pressure joints of Carbon /Low alloy steel, T-11, T-22, T91, TPH 347 HP Joints up to 76.1mm tube OD. | 4,000 | Nos. | 1,050 ₹42,00,000 Lowest | 1,165 ₹46,60,000 |
| 5.00 | Thickness survey of Boiler Pressure parts consisting of 18 Hangers Economizer (lower & upper bank) / 18 Hangers of LTSH and other area of boiler pressure part i.e. water wall, SCW, CRH, HRH, FSH etc. | 36 | Nos. | 12,607 ₹4,53,852 Lowest | 13,962 ₹5,02,632 |
| 6.00 | Metal build up on eroded portion of pressure parts tube caused by Ash / Steam erosion using suitable electrode matching with parent metal composition by Arc and Argon Welding where joint is not required (Size:150mm Length X 35mm Width Depth of erosion up to 2.5mm). | 500 | Nos. | 291 ₹1,45,500 Lowest | 345 ₹1,72,500 |
| 7.00 | Fin welding work of water wall / steam cool wall. | 1,000 | RM | 406 ₹4,06,000 Lowest | 475 ₹4,75,000 |
| 8.00 | Installation of SS shielding /cassette baffles in all erosion pro area like in screen water wall, LTSH, Economiser and Extended SCW. | 2,600 | Nos. | 220 ₹5,72,000 Lowest | 275 ₹7,15,000 |
| 9.00 | DP test of dissimilar joints and Header Tubes. (DP test Kit shall be in the scope of Contractor). | 2,500 | Job | 120 ₹3,00,000 Lowest | 155 ₹3,87,500 |
| 10.00 | Repairing of skin casing of first path & second path of penthouse and complete furnace sealing in pent house and dog House. Disposal of ash of penthouse and Dog house in contractor scope. | 1 | Job | 4,17,560 ₹4,17,560 Lowest | 5,25,769 ₹5,25,769 |
Tender Value
₹1.1 Cr
EMD Value
₹1.4 L
Closing Date
18 Jun 2025, 1:00 pmClosed
SE/OMC-II/CTPS.PTPP PARICHHA JHNASI
SE/OMC-II/CTPS.PTPP PARICHHA JHNASI
Complete OH of Pressure parts of boiler,drum internal, supply of scaffolding, jet cleaning of boiler,main boiler works, Soot blower, pant house, repairing works of buck stay,Repairing/Servicing of Hanger Support and other works in Boiler of U-6
2025_RVUNL_1033739_1
NPAR/C/OMC2/BMD1/6000008203_00
Open Tender
Power/Energy Projects/Products
Fixed-rate
45 days
BMD-I/OMC-II/CTPS.PTPP PARICHHA JHNASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dy. CAO, CFA AND BO, PTPP, Parichha
₹1.4 L
SE/OMC-II/CTPS.PTPP PARICHHA JHNASI
18 Aug 2025
28 Apr 2025
20 Jun 2025
28 Apr 2025
18 Jun 2025
28 Apr 2025
16 Jun 2025
Amount
Complete external water washing of all floor of Boiler, from roof of pent house to zero meter and internal cleaning of second pass including dust disposal from pant house, dog house and economizer hopper.
Supply and Erection of Cup lock scaffolding system in Ist and IInd pass. during OH period.
High Pressure Jet Cleaning for Pressure parts with scope of supply of pumps.
High Pressure joints of Carbon /Low alloy steel, T-11, T-22, T91, TPH 347 HP Joints up to 76.1mm tube OD.
Thickness survey of Boiler Pressure parts consisting of 18 Hangers Economizer (lower & upper bank) / 18 Hangers of LTSH and other area of boiler pressure part i.e. water wall, SCW, CRH, HRH, FSH etc.
Metal build up on eroded portion of pressure parts tube caused by Ash / Steam erosion using suitable electrode matching with parent metal composition by Arc and Argon Welding where joint is not required (Size:150mm Length X 35mm Width Depth of erosion up to 2.5mm).
Fin welding work of water wall / steam cool wall.
Installation of SS shielding /cassette baffles in all erosion pro area like in screen water wall, LTSH, Economiser and Extended SCW.
DP test of dissimilar joints and Header Tubes. (DP test Kit shall be in the scope of Contractor).
Repairing of skin casing of first path & second path of penthouse and complete furnace sealing in pent house and dog House. Disposal of ash of penthouse and Dog house in contractor scope.
Overhauling of wall blower and APH blower.
Complete internal overhauling of Boiler Drum.
Repairing and reconditioning work of inspection window and manholes.
Inspection & Repairing and reconditioning of hanger and its supports at different places at boiler and repairing and reconditioning of horizontal and vertical buckstay of first & second pass.
Overhauling of seal trough, making of scaffolding plate from rear and front side, lifting & alignment and welding of seal trough plates.
Rate of Scaffolding per day Beyond Overhauling period (45 days) (Optional work)
Syndicate Engineers (BID ID -5245326)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .