Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.8 LAccepted-AOC BUS STAND BINA BINA 231220 UTTAR PRADESH INDIA | BINA | SONBHADRA | UTTAR PRADESH | 231220 | 1 | Accepted-AOC Bidder has submitted all documents asked in NIT and found technocommercially eligible and rates are reasonable . |
| Sl No | Description | Qty | Unit | M/S DURGA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.10 | Labor charge including contractor's profit for the work of Tyre mounting , De-mounting , Dismantling , assembling , fitment , Tyre inflation and Tyre pressure checkup work of BH 100 Dumper , Water Sprinkler , Motor Grader , Crane , Tyre Handler , Wheel Dozer of Krishnashila project on daily basis . | 365 | Days | 2,880 ₹10,51,200 Lowest |
| 1.20 | General Tools and tackles required for the work | 365 | Days | 50 ₹18,250 Lowest |
| 1.30 | Personal Protective Equipment as per mines safety rules | 365 | Days | 50 ₹18,250 Lowest |
| 1.40Note -1.Scope of Work/ Technical Specifications: Refer NIT 2. EPF/CMPF is not included in estimate cost and will be reimbursed only after producing of documentary evidence of payment. | ||||
| 2.00 | Total impact of GST for the purpose of CTC | 1 | No. | - |
Tender Value
₹17.4 L
EMD Value
₹21,700
Closing Date
17 Oct 2025, 6:00 pmClosed
Staff Officer (EXCV), KSL Project
Excavation Department , GM Office , Krishnashila Area .
Offloading the work of Tyre mounting , De-mounting , Dismantling , assembling , fitment , Tyre inflation and Tyre pressure checkup work of BH 100 Dumper , Water Sprinkler , Motor Grader , Crane , Tyre Handler , Wheel Dozer of Krishnashila project .
2025_NCL_345016_1
KSL/SO (Excv.)/E_Tender/2025-26/17
Open Tender
Excavation Department Work
Item Rate
365 days
Workshop (Excavation, KSL Project
Please refer tender documents .
5 documents required · 5 mandatory
₹21,700
11 Mar 2026
3 Oct 2025
18 Oct 2025
3 Oct 2025
17 Oct 2025
4 Oct 2025
3 Oct 2025 - 9 Oct 2025
Amount
Labor charge including contractor's profit for the work of Tyre mounting , De-mounting , Dismantling , assembling , fitment , Tyre inflation and Tyre pressure checkup work of BH 100 Dumper , Water Sprinkler , Motor Grader , Crane , Tyre Handler , Wheel Dozer of Krishnashila project on daily basis .
General Tools and tackles required for the work
Personal Protective Equipment as per mines safety rules
Note -1.Scope of Work/ Technical Specifications: Refer NIT 2. EPF/CMPF is not included in estimate cost and will be reimbursed only after producing of documentary evidence of payment.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_357655.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Document
1.45 MB
Tender Documents
Tender Documents • 1.19 MB
Tender Documents
Tender Documents • 1.72 MB
Tender Documents
Tender Documents • 1.02 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .