| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.4 CrAccepted-AOC GROUND FLOOR 72 BUSINESS PARK CROSS ROAD C MAROL INDUSTRIAL AREA MIDC ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹4.4 Cr | L-1 | Accepted-AOC Accepted |
| 2 | L-2₹4.6 Cr+₹21.2 L (4.83%)Rejected-AOC | ₹4.6 Cr+₹21.2 L (4.83%) | L-2 | Rejected-AOC Rejected |
| 3 | L-3₹9.4 Cr+₹5.0 Cr (113.6%)Rejected-AOC 52 A 4TH FLOOR INDIAN REGISTER OF SHIPPING ADI SHANKARACHARYA MARG POWAI LAKE POWAI MUMBAI MAHARASHTRA | ₹9.4 Cr+₹5.0 Cr (113.6%) | L-3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
Closing Date
5 Oct 2021, 3:00 pmClosed
GM(TnC)
GM(TnC), NALCO, Damanjodi
CONSTRUCTION MANAGEMENT AND QUALITY CONTROL WORKS FOR CONSTRUCTION OF RED MUD POND II AT NALCO, DAMANJODI
2021_NALCO_647039_1
TnC/AR/03/eC-2271
Open Tender
Miscellaneous Works
Item Rate
900 days
NALCO, Damanjodi
As per Annexure-IC of Tender Document.
8 documents required · 8 mandatory
₹2,000
Yes
NALCO
Exempted
12 Nov 2021
7 Sept 2021
7 Oct 2021
7 Sept 2021
5 Oct 2021
7 Sept 2021
Amount
Diversion of Nallah (Weightage of activity (%): 10
Survey & Marking: Survey of proposed diversion route with bench marking with levels along with the route as per the instruction of EIC. (1%)
Commencement of Excavation: Commencement of excavation after finalization of the sections of the diversion canal with approval of EIC.(1%)
Completion of Excavation: Completion of the diversion canal as per the approved sections and submission of measurements . (6%)
Construction of Culverts and retaining walls: As required in the site with approval of EIC. (1%)
Completion of diversion works with all documents & final measurements (1%)
Garland drain & Roads (Weightage of activity (%): 5
Survey & marking: Survey and demarking the garland drain and road alignment around the proposed RMP 2 basin. (0.25%)
Commencement Excavation: Commencement of excavation after finalisation of excavation section approved from EIC.(1%)
Completion of Excavation: Excavation of garland drains Complete as per the approved sections.(1%)
Construction of culverts and retaining walls: As required at site with approval from EIC. (0.5%)
Construction of roads: Construction of road after finalisation of alignment,gradient and specification and approval from EIC.[Progressive Payment] (1.5%)
Disposal of Excavated materials: The disposal of good earth,rocks will be disposed in designated areas as jointly finalised with EIC. (0.25%)
Completion of garland drains and submission of final measurement along with as built drawings.(0.5%)
Preparation of Basin (Weightage of activity (%): 10
Jungle cleaning/surface dressing/removal of debris in order to make the whole area accessible.(1%)
Survey & marking: Survey and bench marking of the basin, identification of good earth area and finalise the base levels for the proposed RMP 2 basin.(1%)
Levelling of basin area: excavation as per the approved excavation chart for inside basin area to arrive at a proper shape.[Progressive Payment](4%)
Ash filling with levelling and compaction: The ash filling with compaction as per technical specification to provide a base for HDPE laying after final excavation levels of the basin is reached.[Progressive Payment] (3%)
Completion of basin works in all aspects with submission of measurement with final levels of the basin. (1%)
Laying of base filter/chimney filter (Weightage of activity (%): 10
Preparation of dam bed for base filter laying: excavation of cutoff trench and back filling as per specification , stripping and cleaning with proper marking for base filter laying (1%)
Laying of base filter as per the specification with all required quality control [Progressive Payment] (3.5%)
Laying of chimney filter as per the specification with all required quality control [Progressive Payment] (3.5%)
Completion of toe drain & rock toe as per the specification with all required quality control (1%)
Completion of the filter laying works with rock toe and toe drains work ia all aspects and submission of all final measurement, drawings, quality control reports. (1%)
Embankment Filling for all three Dams as per the specification with all quality control tests (Weightage of activity (%): 40
Preparation of borrow area with lead demarcation: Identification of borrow area, testing of soil, setting of lead pillars for all dams and borrow areas. (2%)
Cutoff trench and filling: Excavation of cutoff trench and back filling with good borrow earth as per the specification with quality control. (2%)
Embankment filling as per technical specification. 20% of the total embankment filling quantity complete as per specification and quality control. (6%)
Embankment filling as per technical specification . 40% of the total embankment filling quantity complete as per specification and quality control. (6%)
Embankment filling as per technical specification. 60% of the total embankment filling quantity complete as per specification and quality control. (6%)
Embankment filling as per technical specification 80% of the total embankment filling quantity complete as per specification and quality control. (6%)
Embankment filling as per technical specification 100% of the total embankment filling quantity complete as per specification and quality control. (6%)
Slope dressing with turfing and surface drains: Slope dressing of all dams as per the profile drawing with required slope,surface drains with turfing all complete. (2%)
Completion of embankment filling in all aspects for all the dams with proper quality control, designed slopes and submission of final measurements with all quality control documents. (4%)
Laying of HDPE Lining (Weightage of activity (%): 10
Cordination for Procurement of HDPE lining material by the executing agency as per the specification . (1%)
Inspection and testing for confirmation of the HDPE lining materials as per the specification. (1%)
Laying of HDPE Lining: Laying of HDPE lining as per the specification and quality control guidelines.[Progressive Payment] (6%)
Completion of HDPE lining in all aspects with proper lapping and all side anchoring complete. (1%)
Submission of final measurements with all documents (1%)
Construction of Reclamation Ramp with pump House and site grading for Red Mud Filtration unit (Weightage of activity (%): 5
Survey and site preparation: identification of site, survey and site grading works (1%)
Construction of Reclamation Ramp: Design ,Drawing and execution With approval of Engineer In Charge. (1%)
Construction of Pump House : Design ,Drawing and construction with approval of Engineer in Charge. (1%)
Construction of view points : Design ,Drawing and construction with approval of Engineer in Charge. (1%)
Completion with final documents with all measurements and quality documents (1%)
Completion of the construction work in all aspects and closing of the contract (Weightage of activity (%): 10
Timely submission of all RA Bills of the work "Construction of RMP II" along with all quality documents.[Progressive Payment] (3%)
Submission of as-built drawings after complete verification and with all required data as per the instruction of Engineer-In-Charge[Progressive Payment] (3%)
Submission of Final bill of the work "Construction of RMP II" after detailed verification along with all quality control documents with all statutory and contractual document for the closure of the contract. Closing of the contract. (4%)
S.M. Consultants
IRCLASS Systems and Solutions Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .