Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical BAKSEDA SIKANDRA JANPAD PRAYAGRAJ | SIKANDRA | PRAYAGRAJ | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 30 AMBEDKAR VIHAR YOJANA CHO CHOWK PRAYAGRAJ | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical 129 5 MALVIYA ROAD GEORGE TOWN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
₹94.5 L
EMD Value
₹6.7 L
Closing Date
19 Sept 2026, 3:00 pmClosed
SE, PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
SE, PRAYAGRAJ CIRCLE, PWD, PRAYAGRAJ
Construction work of Mamfordganj me Arun Kumar Tiwari ke ghar se rajeev jaiswal ke ghar tak road
2026_CEALD_1183042_2
3859/10Com(P)-PRJ.CIRCLE/2026 DATED 18.08.2026
Open Tender
Civil Works - Roads
Fixed-rate
180 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.7 L
19 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
19 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | - | Cum | 83 | - |
| 2 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 52.5 | Cum | 2,980 | ₹1,56,450 |
| 3 | Prime coat Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 525 | Sqm | 65 | ₹34,125 |
| 4 | Dense Graded Bituminous Macadam Grading 1 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 131.25 | Cum | 12,445 | ₹16,33,406.25 |
| 5 | Tack coat Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical | 2,625 | Sqm | 16.5 | ₹43,312.5 |
| 6 | Bituminous Concrete Providing and laying bituminous concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 78.75 | Cum | 15,240 | ₹12,00,150 |
| 7 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 262.5 | Cum | 1,925 | ₹5,05,312.5 |
| 8 | Providing and Laying Interlocking Concret Block Pavement having thickness 80 mm as per drawing and Technical Specifiaction Clause 1500 of MORD Specification. | 2,100 | Sqm | 940 | ₹19,74,000 |
| 9 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 120 | Cum | 5,850 | ₹7,02,000 |
| 10 | R.C.C. grade M 20 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump | 281.25 | Cum | 8,745 | ₹24,59,531.25 |
stage.html
html • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_2224792.xls
BOQ • 0.30 MB
01YYYEXTENSION.pdf
PDF • 0.36 MB
01xxxxxxxx.pdf
PDF • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .