Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | ₹4.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.9 LRejected-Finance | ₹4.9 L | L3 | Rejected-Finance L3 |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
17 Jul 2026, 11:30 amClosed
The EO Kolaghat PS
Paikpari Kolaghat Purba Medinipur 721134
Construction of boundary wall of Kolaghat PWM unit at Pansila from KTPS CSR Fund
2026_ZPHD_1031336_1
1156/TQ/Kolaghat PS dated 07.07.2026 from KTPS CSR Fund 25 26
Open Tender
CIVIL WORKS
Percentage
15 days
Within Kolaghat Panchayat Samity area
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹10,000
27 Aug 2026
8 Jul 2026
20 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches for drains…………………..
A) Depth of excavation not exceeding 1500 mm……... as required | 1 | cum | 119.27 | ₹119.26 |
| 2 | Depth of excavation for additional depth beyond 1,500 mm. and rpto 3,000 mm. but not requiring shoring. | - | cum | 192.38 | - |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | cum | 543.51 | - |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | - | cum | 77.54 | - |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | sqm | 348 | - |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | - | sqm | 205 | - |
| 7 | Supplying and laying Polythene Sheet (1509m / sq.m.) over damp proof course or below flooring or roof tenacing or in foundation or in foundation trenches. | 1 | sqm | 24 | ₹24 |
| 8 | Plain Cement concrete (mix 1:3:6) with 40mm size stone ballast excluding shuttering and reinforcement,if any, in gound floor as per relevant lS codes | - | cum | 4,737 | - |
| 9 | Brick work with 1st class bricks in cement mortar (1 :6).
(a) In foundation and plinth. | 1 | cum | 5,198 | ₹5,197.48 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15mm th plaster | 1 | sqm | 139 | ₹138.99 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_2532432.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].