Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.0 CrAccepted-AOC INDORE | ₹39.0 Cr | L1 | Accepted-AOC Agreement done as per attached letter. |
| 2 | Rejected-Technical | - | - | Rejected-Technical Disqualified in Envelope B due to non fullfilment of Technical criteria. |
Tender Value
₹43.5 Cr
EMD Value
₹21.8 L
Closing Date
29 Jan 2024, 5:30 pmClosed
Project Admis. MKPMU , Rajgarh
Project Admis. MKPMU , Rajgarh
On Turn-key basis- Management, Operation and Maintenance of existing pressurized irrigation schemes of Mohanpura Major Project
2023_WRD_317641_1
1037/2023-24/Einc/Etendering/ dt.21-11-2023
Open Tender
Civil Works - Others
1825 days
Rajgarh
Please refer Tender documents.
29 documents required · 29 mandatory
₹50,000
₹21.8 L
o/o ENC , TULSI NAGAR , BHOPAL
27 Dec 2024
5 Jan 2024
31 Jan 2024
5 Jan 2024
29 Jan 2024
8 Jan 2024
16 Jan 2024
Amount
On Turn-key basis- Management, Operation and Maintenance of existing pressurized irrigation schemes of Mohanpura Major Project
On Turn-key basis- Management, Operation and Maintenance of existing pressurized irrigation schemes of Mohanpura Major Project for 5 Years covering 5 years of Mohanpura Left Bank Lift system sub-Project with its rising mains network, 4 years of Mohanpura RBC sub-Project with its complete distribution network by Pipeline covering Culturable Command Area (CCA) 25600 Ha, 2 years of Mohanpura LBC extension sub-Project with its complete distribution network by Pipeline covering Culturable Command Area (CCA) 16984 Ha. On Turn-key basis comprising of operation and maintenance of all Pumps (40 Nos), Switch yard & Transmission lines (8 Nos), Rising Mains (50.1 Km), Gravity Mains (225.8 Km), SCADA, filling and operation of all Balancing Reservoirs/Distribution Chamber (2 Nos), . Distribution network of 42584 ha CCA of complete scheme including the proper distribution of water up to 1 ha Chak including watch and ward of complete scheme. Along with testing and calibration of all electro-mechanical components before the start of irrigation period every year in the O&M Period of 5 Years which may further be extendable up to next Five years. The Contractor shall adhere to the requirements in the Guidelines of “Operation and Maintenance Requirements for Pressurized Micro Irrigation Systems”, MPWRD, December 2016, guidelines and circulars issued by the Department and amended from time to time. The Contractor shall follow the appropriate Standard Operating Procedures (SOPs) as prescribed by the Water Resource Department.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid