| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.0 LAccepted-AOC | ₹41.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹42.2 L+₹1.2 L (2.91%)Rejected-AOC | ₹42.2 L+₹1.2 L (2.91%) | L2 | Rejected-AOC L2 |
| 3 | L3₹42.9 L+₹1.9 L (4.55%)Rejected-AOC | ₹42.9 L+₹1.9 L (4.55%) | L3 | Rejected-AOC L3 |
| 4 | L4₹43.6 L+₹2.6 L (6.39%)Rejected-AOC | ₹43.6 L+₹2.6 L (6.39%) | L4 | Rejected-AOC L4 |
| 5 | L5₹45.2 L+₹4.2 L (10.4%)Rejected-AOC | ₹45.2 L+₹4.2 L (10.4%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | DSA Construction L3 | KKM Construction L9 | CHINNAPAIYAN AND CO L2 | Sasikumar L7 | RAVISHANKAR.P L4 | Sharveshwaran Constructions L8 | Karthikeyan Construction L6 | KRISHNAMOORTHI CONTRACTOR L1 | C.K.Saravanan L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Strengthening of the road from VCC road to Gundalpatty road Km 0/0-1/190 H/O Semmandakuppam R-181 | ||||||||||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | ||||||||||||
| 3.00 | KM 0/0-1/190 | 928.44 | Sq.m | 5.55 ₹5,152.84 | 6.49 ₹6,025.58 | 5 ₹4,642.2 Lowest | 6.36 ₹5,904.88 | 6 ₹5,570.64 | 6.36 ₹5,904.88 | 5.93 ₹5,505.65 | 5 ₹4,642.2 Lowest | 6 ₹5,570.64 |
| 4.00Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | ||||||||||||
| 5.00 | KM 0/0-1/190 | 139.27 | Cu.m | 425.16 ₹59,212.03 | 347.99 ₹48,464.57 | 418 ₹58,214.86 | 487.57 ₹67,903.87 | 434 ₹60,443.18 | 340.93 ₹47,481.32 Lowest | 419.4 ₹58,409.84 | 405 ₹56,404.35 | 452 ₹62,950.04 |
| 6.00Picking the existing BT surface wornout surface including all labour charges etc | ||||||||||||
| 7.00 | KM 0/0-1/190 | 967.13 | Sq.m | 20.37 ₹19,700.44 | 23.73 ₹22,949.99 | 20 ₹19,342.6 | 23.36 ₹22,592.16 | 21 ₹20,309.73 | 23.25 ₹22,485.77 | 20.5 ₹19,826.17 | 19 ₹18,375.47 Lowest | 22 ₹21,276.86 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | ||||||||||||
| 9.00 | KM 0/0-1/190 | 435.21 | Cu.m | 2,148.14 ₹9,34,892.01 | 2,724.15 ₹11,85,577.32 | 2,114 ₹9,20,033.94 | 2,463.46 ₹10,72,122.43 | 2,192 ₹9,53,980.32 | 2,668.87 ₹11,61,518.91 | 2,190.2 ₹9,53,196.94 | 2,045 ₹8,90,004.45 Lowest | 2,284 ₹9,94,019.64 |
| 10.00Applying Prime Coat over WMM surface at 7.00 Kg of SS-1 Bitumen Emulsion / 10 Sq.m including labour for spraying, hire charges for bitumen sprayer etc., completion | ||||||||||||
Tender Value
₹50.8 L
EMD Value
₹51,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Joint Director/ Project Director
DRDA, Dharmapuri
Strengthening of the road from VCC road to Gundalpatty road Km 0/0-1/190 H/O Semmandakuppam
2026_RDTN_657327_1
Roc.No.192/2026/R2 NABARD P08
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹51,000
23 Jun 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening of the road from VCC road to Gundalpatty road Km 0/0-1/190 H/O Semmandakuppam R-181 | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | - | - | - | - |
| 3 | KM 0/0-1/190 | - | Sq.m | - | - |
| 4 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | - | - | - | - |
| 5 | KM 0/0-1/190 | - | Cu.m | - | - |
| 6 | Picking the existing BT surface wornout surface including all labour charges etc | - | - | - | - |
| 7 | KM 0/0-1/190 | 1 | Sq.m | - | - |
| 8 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | - | - | - | - |
| 9 | KM 0/0-1/190 | 1 | Cu.m | - | - |
| 10 | Applying Prime Coat over WMM surface at 7.00 Kg of SS-1 Bitumen Emulsion / 10 Sq.m including labour for spraying, hire charges for bitumen sprayer etc., completion | - | - | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Technical_Bid_08.pdf
Tender Documents • 0.57 MB
Price_Bid_08.pdf
Additional Documents • 0.49 MB
BOQ_788317.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .