Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAccepted-AOC | ₹17.4 L | L1 | Accepted-AOC Low Level Quoted |
| 2 | L2₹17.4 LRejected-Finance | ₹17.4 L | L2 | Rejected-Finance High Level Quoted |
| Sl No | Description | Qty | Unit | PVMG TRADERS L2 | V.GOPINATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with | 42 | Cum | 269.7 ₹11,327.40 | 268.7 ₹11,285.40 |
| 2.00 | Providing and laying Granular Sub Base material using 53mm to 26mm , 26mm and below including cost and conveyance of all materials and all other charges etc complete | 68.25 | Cum | 2,450.9 ₹1.7 L | 2,450.1 ₹1.7 L |
| 3.00 | Supply and fixing of centering materilas for Concrete works including cost and conveyance of all materials to site and all labour charges etc complete | 357 | Cum | 547.5 ₹2.0 L | 547 ₹2.0 L |
| 4.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 80.85 | Cum | 5,370.1 ₹4.3 L | 5,369.1 ₹4.3 L |
| 5.00 | CEMENT CONCRETE 1:2:4 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 44.63 | Cum | 6,671.9 ₹3.0 L | 6,670.9 ₹3.0 L |
| 6.00 | Cement Concrete 1:1.5:3 mix using 20 mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete | 51.19 | Sqm | 7,218.1 ₹3.7 L | 7,218 ₹3.7 L |
| 7.00 | Provision for Bitumenious Pad exposition joint. | 7.07 | Cum | 224.2 ₹1,585.09 | 224 ₹1,583.68 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,65,874.03 ₹2.7 L | 2,65,800.75 ₹2.7 L |
Tender Value
₹17.6 L
EMD Value
₹17,630
Closing Date
19 Feb 2026, 2:00 pmClosed
Block Development Office,Uthiramerur
Block Development Officer,Uthiramerur
Providing for Cement Concrete Road Kattupakkam Muthumariyamman Koil Street At Mennalur Panchayat
2026_RDTN_654975_1
R.C.No.1422/2025 A2- Dt 04.02.2026
Open Tender
Civil Works
Uthiramerur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,630
16 Apr 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
19 Feb 2026
11 Feb 2026
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with
Providing and laying Granular Sub Base material using 53mm to 26mm , 26mm and below including cost and conveyance of all materials and all other charges etc complete
Supply and fixing of centering materilas for Concrete works including cost and conveyance of all materials to site and all labour charges etc complete
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
CEMENT CONCRETE 1:2:4 mix using 20mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
Cement Concrete 1:1.5:3 mix using 20 mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete
Provision for Bitumenious Pad exposition joint.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Schedule.pdf
Tender Documents • 0.38 MB
BOQ_785306.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid