Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | ₹1.8 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not As per NIT |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not as per NIT |
| Sl No | Description | Qty | Unit | SINGH ELECTRICALS L1 |
|---|---|---|---|---|
| 1.00Items Description | ||||
| 2.00Repairing/Rewinding of one no. of 112kW, 550V, 740-RPM, NGEF make Slipring Motor of Dhemomain Incline Colliery under Sodepur Area. | ||||
| 2.01 | Dismantling of motor rotor by dismantling both side cover, bearing, fan, fan cover and slipring. | 1 | Nos. | 2,000 ₹2,000 |
| 2.02 | Cost super enamelled copper wire-138 | 138 | Kg | 876 ₹1.2 L |
| 2.03 | Cost of F class insulating materials | 1 | Nos. | 22,000 ₹22,000 |
| 2.04 | Cost of glass fibre copper flexible cable | 6 | Nos. | 500 ₹3,000 |
| 2.05 | Cost of copper socket | 6 | Nos. | 300 ₹1,800 |
| 2.06 | Cost of wooden forma for coil formation | 1 | Nos. | 1,000 ₹1,000 |
| 2.07 | Cost of synthetic enamel paint | 1 | Nos. | 800 ₹800 |
| 2.08 | Labour charge | 1 | Nos. | 4,000 ₹4,000 |
Tender Value
₹2.0 L
EMD Value
₹2,600
Closing Date
9 Mar 2026, 1:00 pmClosed
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
Repairing/Rewinding of one no. of 112kW, 550V, 740-RPM, NGEF make Slipring Motor of Dhemomain Incline Colliery under Sodepur Area.
2026_ECL_354785_1
ECL/SDPA/AE(EnM)/e/25-26/364 dt.26.02.2026
Open Tender
Miscellaneous Works
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,600
23 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 1 Mar 2026
Items Description
Repairing/Rewinding of one no. of 112kW, 550V, 740-RPM, NGEF make Slipring Motor of Dhemomain Incline Colliery under Sodepur Area.
Dismantling of motor rotor by dismantling both side cover, bearing, fan, fan cover and slipring.
Cost super enamelled copper wire-138
Cost of F class insulating materials
Cost of glass fibre copper flexible cable
Cost of copper socket
Cost of wooden forma for coil formation
Cost of synthetic enamel paint
Labour charge
Cleaning of stator with cleaning agent
Cost of adjusted value of Copper bar-86
Cost of glass insulated leads and sockets
Cost of varnish, heating and backing
Cost of stud and insulators
Cost of glass fibre wedge of slot size
Cost of glass & nomex tape for insulation of cu bar
Reformation of copper bar coils
Dismantling of rotor binding both sides
Cost of rotor binding both sides with steel wires
Labour charge
Less scrap value
Overhead & profit @10%
Transportation charges
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_367618.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_367618.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid