| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | first₹27.1 LAccepted-Finance | ₹27.1 L | first | Accepted-Finance Accepted |
| 2 | second₹27.2 LAccepted-Finance | ₹27.2 L | second | Accepted-Finance Accepted |
| 3 | third₹27.3 LAccepted-Finance | ₹27.3 L | third | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | SUMEET THAKUR GOVT. CONTRACTOR L1 | Aashish kumar Govt Contractor L3 | Anup Kumar Dubey L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and Applying Polyutherane Selaent with backing rod of 10mm Dia along the expansion Joint in Horizintal and Vertical Direction complete neat and clean as per requirement of site including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 600 | Rmt | 380 ₹2,28,000 Lowest | 395 ₹2,37,000 | 380 ₹2,28,000 Lowest |
| 2.00 | Repairing of Down Pipe Joint at terrace Level with Pu Sealent, Elastomeic water proofing componenet including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 320 | Each | 20 ₹6,400 Lowest | 20 ₹6,400 Lowest | 30 ₹9,600 |
| 3.00 | Cleaning of existing Kota stone/Granite Stone surface and all joints in Bathrooms, Corridor Area, Balcony Area complete cleaning of all Joints and Filling of Joint with Transparent waterproof Liquid Epoxy Resin complete as per direction of Engineer- in charge including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 665 | Sqm | 680 ₹4,52,200 Lowest | 680 ₹4,52,200 Lowest | 681 ₹4,52,865 |
| 4.00 | Repairing of old CI Pipe/PVC Joint of various Dia at all joints of Bathroom Down Pipes in Duct/ Outer walls complete with cleaning of joint in all respect and Seal with Pu Sealent and covering with Rubrised Elastomeric Water Proofing Component at all joints with minium Coating of 150mm in length towards each side of joint complete in all repspects as per site requirement at all heights complete as per dierection of Engineer- in charge includingentire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 2,000 | Each | 600 ₹12,00,000 Lowest | 605 ₹12,10,000 | 600 ₹12,00,000 Lowest |
| 5.00 | Repairing of Bathroom Traps/ P- Traps/S-Traps Complete with cleaning of traps and Seal with Pu Sealent and covering with Rubrised Elastomeric Water Proofing Component at all jointst in all respect at all heights complete as per direction by Engineer- in charge including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 1,000 | Each | 600 ₹6,00,000 Lowest | 605 ₹6,05,000 | 600 ₹6,00,000 Lowest |
| 6.00 | Repairing of Aluminium Glazing towards Horizontal and Vertical Direction of Glass Glazing, Window Sill Level complete cleaning of all joints and repairing with PU Sealent /Epoxy?Chemical including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 500 | Sqm | 300 ₹1,50,000 Lowest | 300 ₹1,50,000 Lowest | 310 ₹1,55,000 |
| 7.00 | Providing and fixing double scaffolding system (cup lock type) onthe exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joiningwith cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldingfor workingplatform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .Thescaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection ofwork at required locations with essential safety features for theworkmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measuredfor payment purpose .The payment will be made once irrespective of duration of scaffolding including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 300 | Sqm | 230 ₹69,000 | 220 ₹66,000 Lowest | 240 ₹72,000 |
Tender Value
₹27.3 L
EMD Value
₹54,574
Closing Date
20 Jul 2026, 11:00 amClosed
Executive Engineer(Civil)
Construction Cell NIT Hamirpur H.P 177005
Repairing and Sealing of old CI Pipes T-Joints, Expansion Joints, Floor Traps, P-Traps and Kota Stone in various hostels such as Ambika, Parvati, Mani Mahesh, Himgiri, Himadri, Neelakanth, Satpura, Vindayachal along-with various department etc.
2026_NITHP_915386_1
Repairing and Sealing of old CI Pipes T-Joints, Expansion Joints Floor Traps P-Traps Kota Stone etc.
Open Tender
Civil Works
Item Rate
180 days
Construction Cell NIT Hamirpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹54,574
14 Sept 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
20 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Applying Polyutherane Selaent with backing rod of 10mm Dia along the expansion Joint in Horizintal and Vertical Direction complete neat and clean as per requirement of site including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 600 | Rmt | 100 | ₹60,000 |
| 2 | Repairing of Down Pipe Joint at terrace Level with Pu Sealent, Elastomeic water proofing componenet including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 320 | Each | 100 | ₹32,000 |
| 3 | Cleaning of existing Kota stone/Granite Stone surface and all joints in Bathrooms, Corridor Area, Balcony Area complete cleaning of all Joints and Filling of Joint with Transparent waterproof Liquid Epoxy Resin complete as per direction of Engineer- in charge including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 665 | Sqm | 10 | ₹6,650 |
| 4 | Repairing of old CI Pipe/PVC Joint of various Dia at all joints of Bathroom Down Pipes in Duct/ Outer walls complete with cleaning of joint in all respect and Seal with Pu Sealent and covering with Rubrised Elastomeric Water Proofing Component at all joints with minium Coating of 150mm in length towards each side of joint complete in all repspects as per site requirement at all heights complete as per dierection of Engineer- in charge includingentire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 2,000 | Each | 10 | ₹20,000 |
| 5 | Repairing of Bathroom Traps/ P- Traps/S-Traps Complete with cleaning of traps and Seal with Pu Sealent and covering with Rubrised Elastomeric Water Proofing Component at all jointst in all respect at all heights complete as per direction by Engineer- in charge including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 1,000 | Each | 10 | ₹10,000 |
| 6 | Repairing of Aluminium Glazing towards Horizontal and Vertical Direction of Glass Glazing, Window Sill Level complete cleaning of all joints and repairing with PU Sealent /Epoxy?Chemical including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 500 | Sqm | 10 | ₹5,000 |
| 7 | Providing and fixing double scaffolding system (cup lock type) onthe exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joiningwith cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffoldingfor workingplatform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .Thescaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection ofwork at required locations with essential safety features for theworkmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measuredfor payment purpose .The payment will be made once irrespective of duration of scaffolding including entire carriage of mateirial in all leads, lifts, hight and cost of all other incidentals. | 300 | Sqm | 10 | ₹3,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.43 MB
Tendernotice_2.pdf
PDF • 1.97 MB
Tendernotice_3.pdf
PDF • 0.67 MB
BOQ_961991.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .