Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L Quoted ₹6.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.3 LRejected-AOC | ₹6.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SPK ENTERPRISES L1 | MARAN BROTHERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of 8mm M.S/Chequered Plate (IS2062) (If the materials are available in NCTPS Store at time of work execution, it will be supplied by TANGEDCO at free of cost and it will be excluded from contractor’s scope). | 4 | MT | 76,960 ₹3.1 L | 78,398 ₹3.1 L |
| 2.00 | Providing scaffolding arrangement at flue gas duct ESP inlet mechanical hopper including the cost of consumables and T&Ps. | 100 | Sq.mtr | 72 ₹7,200 | 73 ₹7,300 |
| 3.00 | Charges for dismantling of damaged splitter assembly in flue gas duct ESP inlet. This work involves arresting, cutting, leading and removal of eroded duct plates in the form of multilayer and devolution of scraps to stores, including cost of consumables and T&P's. | 2 | MT | 13,179 ₹26,358 | 13,425 ₹26,850 |
| 4.00 | Charges for leading, lifting and transportation of Iron & Steel materials to site (above 20 Mtr) including hire charges for mobile crane. | 4 | MT | 4,967 ₹19,868 | 5,060 ₹20,240 |
| 5.00 | Charges for fabrication and erection of Splitter assembly in flue gas duct ESP inlet. Including cost of consumables and T&P’s (The required material is under contractor scope). | 4 | MT | 54,819 ₹2.2 L | 55,844 ₹2.2 L |
| 6.00 | Labour charges for welding eroded initial welding joints of Splitter assembly in other flue gas duct ESP inlet, including cost of cosumables and T&P's. | 160 | Mtr | 262 ₹41,920 | 267 ₹42,720 |
Tender Value
Refer Docs
EMD Value
₹6,800
Closing Date
10 Jul 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle BM Unit II AOH 2025 26 Replacement of the severely eroded
2025_EB_578048_1
CE NCTPS II SE M I O M 78 2025 26
Open Tender
Miscellaneous Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,800
Yes
9 Jan 2026
4 Jul 2025
11 Jul 2025
4 Jul 2025
10 Jul 2025
4 Jul 2025
Amount
Supply of 8mm M.S/Chequered Plate (IS2062) (If the materials are available in NCTPS Store at time of work execution, it will be supplied by TANGEDCO at free of cost and it will be excluded from contractor’s scope).
Providing scaffolding arrangement at flue gas duct ESP inlet mechanical hopper including the cost of consumables and T&Ps.
Charges for dismantling of damaged splitter assembly in flue gas duct ESP inlet. This work involves arresting, cutting, leading and removal of eroded duct plates in the form of multilayer and devolution of scraps to stores, including cost of consumables and T&P's.
Charges for leading, lifting and transportation of Iron & Steel materials to site (above 20 Mtr) including hire charges for mobile crane.
Charges for fabrication and erection of Splitter assembly in flue gas duct ESP inlet. Including cost of consumables and T&P’s (The required material is under contractor scope).
Labour charges for welding eroded initial welding joints of Splitter assembly in other flue gas duct ESP inlet, including cost of cosumables and T&P's.
MARAN BROTHERS (BID ID -1396048)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid