Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | +0.00% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 L+₹2,773.71 (1.50%)Admitted-Finance | +1.50% | ₹1.9 L+₹2,773.71 (1.50%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 L+₹4,160.57 (2.25%)Admitted-Finance | +2.25% | ₹1.9 L+₹4,160.57 (2.25%) | L3 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹4,000
Closing Date
24 Jun 2026, 2:00 pmClosed
EE TPS
Tallah Pumping Station 71 B.T Road Kolkata-700002
PREVENTING ENTRY OF WATER INSIDE PUMPHOUSE OF STATION NUMBER ONE AND TWO AND CESC 1ST POINT SUPPLY ROOM DURING OUTSIDE WATER LOGGED AT TPS
2026_KMC_1027500_1
KMC/WS/TPS/02/2026-2027
Open Tender
Miscellaneous Works
Percentage
120 days
Tallah Pumping Station 71 B.T Road Kolkata-700002
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
22 Aug 2026
13 Jun 2026
27 Jun 2026
13 Jun 2026
24 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (A) Materials delivered and
stacked at site: 6)a)Sand coarse (Finenses moduls not less than
2). Note: 1. The above rates are inclusive of all charges such as
Royalty, Supervision Charges, etc. and also include allowance for
sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit
but exclusive of GST
2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at
site and no other costs need to be considered. For other items,
necessary loading-unloading & carriage charges are admissible.
3. Laterrite Boulder &Moorum are available in the districts as
mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may
add necessary carriage cost as applicable. | 46.95 | CUBIC METER | 1,095 | ₹51,410.25 |
| 2 | (C) III: Labour Rate for Sanitary and Plumbing 3.Methor Mistry
NOTE:The above rates are exclusive of 10 % profit and 1% Labour
welfare cess, which would be admissible to the Contractor, but
contractual percentage will not be applicable on the above rates.
Page 113 of 124 | 224 | EACH | 326 | ₹73,024 |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
19)Hammer Man. Note: (I)The above rates of labour are exclusive of
10% contractors profit and 1% Labour welfare cess which would be
admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any
structure over 30 ft in height and also workers engaged in Tunnel
shall be paid 20% extra wages. | 224 | EACH | 270 | ₹60,480 |
| 4 | Sub Total | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice_2.pdf
PDF • 0.50 MB
BOQ_2523974.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .