Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC | L1 | Accepted-AOC Eligible tenderer | |
| 2 | L2₹26.8 L+₹1.7 L (6.97%)Rejected-Finance 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | L2 | Rejected-Finance L2 Tenderer |
Tender Value
Refer Docs
EMD Value
₹21,700
Closing Date
10 Mar 2025, 2:00 pmClosed
CE/MTPS-II
MTPS-II / Mettur Dam
Providing GI sheet cladding arrangement Fifth Phase for a length of 19mtrs on the northern side of Conveyor 3A 3B to prevent the deposit of coal particles emanating from Conveyor 3A 3B crossover up to PCH eastern side to the nearby village
2025_EB_526909_1
OT37/24-25
Open Tender
Miscellaneous Works
Works
90 days
MTPS-II / Mettur Dam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,700
Yes
22 Apr 2025
21 Feb 2025
11 Mar 2025
21 Feb 2025
10 Mar 2025
21 Feb 2025
Amount
Clearing the jungle growth and collecting the cleared debris of vegetation and disposed to suitable place away from the site as directed by the Engineer at site including all labour charges, hire charges for vehicle, tools and plants, lead, lift, etc., complete.
Earth work excavation for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in all types of soil as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete.
MR&DMR(Not requiring blasting )Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in medium rock and dense medium rock not requiring blasting as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete.
Providing PCC 1:4:8 using 40mm HBG metal for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, lead, lift, etc., complete.
Providing PCC 1:2:4 using 20 mm HBG metal for foundation as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc., complete.
Supply, fabrication and erection in position of vertical column posts and inclined struts using I BEAM 200x100x6 and 150x100x6 mm, welded with base plate 8mm thick, ISA 50x50x6mm, with vertical posts for fixing the G.I Sheet, the rate includes cost for supply of MS angles, MS base plate and charges for fabrication, aligning, placing in position, erecting the posts, all labour charges, scaffolding charges,welding, bolts and nuts if required, all lead, lift, etc., complete.
Painting the structural steel work with two coats of enamel paint of approved quality and colour over a coat of primer including cost of all materials, labour charges, scaffolding charges, brushes, lead, lift, etc., complete.
Supplying and fixing of Corrugated G.I Sheet of approved quality with necessary screws including cost of all materials, labour charges, scaffolding charges, lead, lift, etc., complete.
LENIN ENGINEERING WORKS (BID ID -1266705)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .