Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹20.8 L+₹1.2 L (5.92%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹21.9 L+₹2.3 L (11.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹23.3 L+₹3.7 L (18.6%)Admitted-Fee/PreQual/Technical/Finance THAYAN KALAROOS SHAH BULDING THAYAN KALAROOS THAYAN KAAROOS KUPWARA JAMMU KASHMIR 193222 UDYAM JK 12 0011118 | KUPWARA | JAMMU AND KASHMIR | 193222 | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹23.3 L+₹3.7 L (18.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.7 L
EMD Value
₹83,160
Closing Date
21 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Construction of 03 ACR at GUPS Sonmulla
2026_RDPR_315887_9
NIT NO 53 OF 2026-27 GENERAL
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Eng REW Kupwara
₹83,160
4 Aug 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : Wherever necesaary | 83.2 | Cum | 187.3 | ₹15,583.36 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 79.51 | Cum | 256.85 | ₹20,422.14 |
| 3 | Supplying and Laying of stone soling hand packed tightly incl ramming watering etc complete | 12.93 | Cum | 1,000 | ₹12,930 |
| 4 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 5.56 | Cum | 5,202.9 | ₹28,928.12 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete
including curing but excluding the cost of centering, shuttering, finishing and
reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone agg 20 mm N. size) Raft | 12.4 | Cum | 7,788.4 | ₹96,576.16 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.14 | Cum | 9,821.85 | ₹99,593.56 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete | 2,254.82 | Kg | 115.35 | ₹2,60,093.49 |
| 8 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:3:6 coarse sand 40mm nominal size crushed stone agg.) | 39.78 | Cum | 5,733.6 | ₹2,28,082.61 |
| 9 | Filling by Available excavated earth (excluding rock) in trunches,plinth,sides of fondation etc, in layers not exceding 20 Cm in depth ,consolidation each deposited layer by ramming and watering lead upto 50m and lift upto 1.5 m | 26.52 | Cum | 218.4 | ₹5,791.97 |
| 10 | Supplying and filling in plinth with fine sand /Nallah Muck under floors including watering rammiing ,consolidating and dressing complete. | 11.23 | Cum | 1,204.5 | ₹13,526.54 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_1026828.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .