Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAdmitted-Finance D 60 DEVELOPED PLOT ESTATE THUVAKUDI TIRUCHIRAPPALLI 620015 | TIRUCHIRAPPALLI | TIRUCHIRAPPALLI | TAMIL NADU | 620015 | L1 | Admitted-Finance | |
| 2 | L2₹6.6 L+₹15,250 (2.38%)Admitted-Finance 26 SIDCO DEVELOPED PLOT ESTATE THUVAKUDI TIRUCHIRAPPALLI 620015 | TIRUCHIRAPPALLI | TIRUCHIRAPPALLI | TAMIL NADU | 620015 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | THIRUMALAI ENGINEERING INDUSTRIES L1 | SRI BALAJI ENGINEERING ENTERPRIZES L2 |
|---|---|---|---|---|---|
| 1.00 | Checking & servicing of Tie rod support in pent house roof. Ensure the tightness of tie rod nuts and attend minor adjustment if any. Charges including consumables and T&Ps. | 250 | nos | 305 ₹76,250 Lowest | 308 ₹77,000 |
| 2.00 | Inspection and servicing of hanger supports in Boiler, checking the hangers cold reading if necessary adjustment shall be made bring the needle to cold condition actual position. And taking hot reading with maximum load and ensure the healthiness of the hanger supports by experts and submit the reading. If any minor rectification and adjustment should be corrected. Charges including consumables and T&Ps. | 75 | nos | 1,675 ₹1,25,625 Lowest | 1,723 ₹1,29,225 |
| 3.00 | Charges for providing temporary scaffolding for positioning, aligning and welding of scaffolding materials dismantling the temporary scaffolding after completion of works. Charges inclusive of T&P's and consumables. | 90 | m2 | 170 ₹15,300 Lowest | 175 ₹15,750 |
| 4.00 | Charges for Release the load of power cycle pipe line from the failed hanger supportand remove the defective hanger accessories and holding of hanger support from its location including T&P's hire and consumable charges. | 10 | nos | 10,430 ₹1,04,300 Lowest | 10,740 ₹1,07,400 |
| 5.00 | Charges for Repair/Rectification the failed internal parts of hanger supports assembly & inspect the all internal parts and replace the new hanger accessories including T&P's hire and consumable charges. | 10 | nos | 24,790 ₹2,47,900 Lowest | 25,520 ₹2,55,200 |
| 6.00 | Charges for Assemble the hanger support & refit in location and load the hanger support to the pipe line & checking and putting into service etc., including T&P's hire and consumable charges. | 10 | nos | 7,265 ₹72,650 Lowest | 7,270 ₹72,700 |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
22 Sept 2026, 2:00 pmClosed
SE M1
NCTPS II
NCTPS-II M-I Circle BM Division - Unit II - Annual overhaul of hanger supports of Main steam line, Cold Re-heater line, Hot Re-heater line, Inlet feed line, Pent House headers, Eco to drum inlet line Bottom ring header, tie rod sup
2026_EB_702323_1
NCTPS_II_UII_Spec_29_26_27
Open Tender
Maintenance Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,900
Yes
28 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Checking & servicing of Tie rod support in pent house roof. Ensure the tightness of tie rod nuts and attend minor adjustment if any. Charges including consumables and T&Ps. | 250 | nos | - | - |
| 2 | Inspection and servicing of hanger supports in Boiler, checking the hangers cold reading if necessary adjustment shall be made bring the needle to cold condition actual position. And taking hot reading with maximum load and ensure the healthiness of the hanger supports by experts and submit the reading. If any minor rectification and adjustment should be corrected. Charges including consumables and T&Ps. | 75 | nos | - | - |
| 3 | Charges for providing temporary scaffolding for positioning, aligning and welding of scaffolding materials dismantling the temporary scaffolding after completion of works. Charges inclusive of T&P's and consumables. | 90 | m2 | - | - |
| 4 | Charges for Release the load of power cycle pipe line from the failed hanger supportand remove the defective hanger accessories and holding of hanger support from its location including T&P's hire and consumable charges. | 10 | nos | - | - |
| 5 | Charges for Repair/Rectification the failed internal parts of hanger supports assembly & inspect the all internal parts and replace the new hanger accessories including T&P's hire and consumable charges. | 10 | nos | - | - |
| 6 | Charges for Assemble the hanger support & refit in location and load the hanger support to the pipe line & checking and putting into service etc., including T&P's hire and consumable charges. | 10 | nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_844273.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .