Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹9,320 (3.15%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.2 L+₹24,400.01 (8.25%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L3₹3.2 L+₹24,400.01 (8.25%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L3₹3.2 L+₹24,400.01 (8.25%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
8 Jun 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
CONSTRUCTION OF R/WALL WITH DRAIN AT DIFFERENT SPOTS WITH STEEL TRASH PLATE CULVERT AT MANTRIGAM
2026_RDPR_310627_13
NIT03
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹8,000
13 Jun 2026
23 May 2026
9 Jun 2026
23 May 2026
8 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing Cement concrete manually/by mechanical means and disposal of material within 50 meters lead as per direction of Engineer-in-charge. | 22.8 | Cum | 602.8 | ₹13,743.84 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soils | 13.6 | Cum | 479.3 | ₹6,518.48 |
| 3 | Providing and laying of dry stone soling, tightly hand packed and Plum in concrete etc incl. all cost and carriages involved | 15.55 | Cum | 1,204 | ₹18,722.2 |
| 4 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M10 using 20 mm nominal size agg excluding cost of shuttering i/c curing( All works upto Plinth level) | 44.25 | Cum | 5,733.6 | ₹2,53,711.8 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns | 61 | Sqm | 286.35 | ₹17,467.35 |
| 6 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 61 | Sqm | 266.2 | ₹16,238.2 |
| 7 | Structural steel work in single section, fixed with or without connecting
plate, including cutting, hoisting, fixing in position and applying a priming
coat of approved steel primer all complete. | 180 | kg | 120.8 | ₹21,744 |
| 8 | Excavating,supplying and filling of local earth/RBM (including royalty) by mechanical means transport upto lead of 10 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc complete job. | 69.47 | Cum | 555.3 | ₹38,576.69 |
| 9 | Add Provision for weep holes using pipe 75 mm dia in P/wall as per directions of Engineer-incharge. | 1 | L.S | 2,500 | ₹2,500 |
| 10 | Add carriage of materials involved:Sand/aggregates with Av. Lead of 10Km by M.T. | 61 | Cum | 279.04 | ₹17,021.44 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1004700.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .