| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.8 LAccepted-AOC NO 130 1 THIRUVETRIYUR HIGH ROAD THADAPERUMBAKKAM VILLAGE PONNERI TALUK TIRUVALLUR DISTRICT 601024 | THADAPERUMBAKKAM | TIRUVALLUR | TAMIL NADU | 601024 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | Rejected-Technical | - | Rejected-Technical Quoted L2 rate | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received |
| Sl No | Description | Qty | Unit | B BALASUBRAMANI L2 | M/S. ATS INFRA L1 |
|---|---|---|---|---|---|
| 1.001. CONSTRUCTION OF COMPOUND WALL IN CHIEF MINISTER MINI STADIUM IN MINJUR PANCHAYAT UNION @ TIRUVALLUR DISTRICT UNDER CER INDIAN OIL LNG PRIVATE LIMITED/2025 - 2026/ RD/TVLR/MJR02 | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 172.5 | CUM | 270 ₹46,575 | 263.6 ₹45,471 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 22.89 | CUM | 2,170 ₹49,671.3 | 2,157.25 ₹49,379.45 Lowest |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 22.89 | CUM | 5,960 ₹1,36,424.4 | 5,913.6 ₹1,35,362.3 Lowest |
| 5.00 | Supply and Fabrication of steel including cost and conveyance of all
materials to site and all labour charges for placing in position etc,..completed.. | 5.25 | MT | 92,000 ₹4,83,000 | 91,865.7 ₹4,82,294.93 Lowest |
| 6.00 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed | 46 | SQ.M | 560 ₹25,760 | 547.4 ₹25,180.4 Lowest |
| 7.00 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed.. | 397.5 | SQ.M | 1,100 ₹4,37,250 | 1,095 ₹4,35,262.5 Lowest |
| 8.00 | RCC 1:1.5:3 Mix (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 87.85 | CUM | 9,650 ₹8,47,752.5 | 9,637.3 ₹8,46,636.81 Lowest |
| 9.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 47.78 | CUM | 6,280 ₹3,00,058.4 | 6,265.9 ₹2,99,384.7 Lowest |
| 10.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 639.75 | SQ.M | 300 ₹1,91,925 | 288.25 ₹1,84,407.94 Lowest |
Tender Value
Refer Docs
EMD Value
₹39,000
Closing Date
6 Mar 2026, 3:00 pmClosed
BDO BP Minjur
Block development office
Construction of Compound wall in Chief Minister mini stadium in Minjur Block
2026_RDTN_670045_1
RC no 3249/2022/A2 dated 03.03.2026
Open Tender
Civil Works
Item Rate
Minjur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,000
16 Oct 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CONSTRUCTION OF COMPOUND WALL IN CHIEF MINISTER MINI STADIUM IN MINJUR PANCHAYAT UNION @ TIRUVALLUR DISTRICT UNDER CER INDIAN OIL LNG PRIVATE LIMITED/2025 - 2026/ RD/TVLR/MJR02 | - | - | - | - |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 172.5 | CUM | 263.78 | ₹45,502.05 |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 22.89 | CUM | 2,157.49 | ₹49,384.95 |
| 4 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 22.89 | CUM | 5,913.74 | ₹1,35,365.51 |
| 5 | Supply and Fabrication of steel including cost and conveyance of all
materials to site and all labour charges for placing in position etc,..completed.. | 5.25 | MT | 91,865.86 | ₹4,82,295.77 |
| 6 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed | 46 | SQ.M | 547.5 | ₹25,185 |
| 7 | Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed.. | 397.5 | SQ.M | 1,095 | ₹4,35,262.5 |
| 8 | RCC 1:1.5:3 Mix (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 87.85 | CUM | 9,637.41 | ₹8,46,646.47 |
| 9 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 47.78 | CUM | 6,265.95 | ₹2,99,387.09 |
| 10 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 639.75 | SQ.M | 288.35 | ₹1,84,471.91 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_805217.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TenderDocumentMJR02.pdf
Tender Documents • 0.33 MB
BOQ_805217.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .